Loading…
Loading…
5,788 results • Best match
Improvement and strengthening of road from Dyke-1 to Earth Dam of Lower Indra Irrigation Project.
Improvement to Quality control laboratory at Dam site and parking area near Dyke-I of LIIP
Protection of acquired Land of Irrigation Colony at Dam Site Tikhali of Lower Indra Irrigation Project.
Improvement and Restoration of U/S of Padhala Anicut.
Renovation of Brake System of Mahanadi Barrage Gates along with H R Gates of Taladanda and Kendrapada Canal by Supply Erection and Commissioning of Electro Magnetic Brakes under Superintending Engineer Mechanical Division Cuttack for the year 2025 26
Replacement of dewatering pipe line of foundation Gallery at Rengali Dam Site
Improvement to sloping drain from RD 384M to 3780M of Earth Dam of Lower Indra Irrigation Project.
Improvement to Jaleswar Temple along with Periphery development at Dam Site Tikhali of Lower Indra Irrigation Project.
Improvement to internal Permanent Colony road at Rengali Dam Site
Construction of inter connecting Paver road to community hall and repair to existing CC road at barrage colony of Anandapur Barrage Project Salapada
Repair and Renovation of damage structures of Barrage and HR left and right side of Salandi Barrage, Bidyadharpur for the year 2025-26
Repair and Maintenance of Project High School and College at Rengali Dam Site
Supply and Fixing of Galvanized iron doors in Residential buildings under RHEP, Rengali Dam Site
Repair and Replacement of Gates of Sujanpur Check Dam under Drainage Division Kendrapara for the year 2024 25
Removal of silt from up stream of Sorisamuli Barrage.
Improvement of upper colony road of Samal Barrage Township.
Priming and Painting of Kusumi Barrage for Nayagarh District
Improvement of Hanumanpur village Rehabilitation Colony of Samal Barrage
CONSTRUCTION OF DG ROOM AT BIDYADHARPUR BARRAGE AT BIDYADHARPUR.
Renovation of 250 KVA DG room near Samal Barrage
Improvement to control tower and DG Shed
Engagement of 2 (two) nos. Amin in office of the Superintending Engineer, Anandapur Barrage Division, Salapada for the period from 01.01.2025 to 31.12.2025.
FABRICATION, ERECTION, TESTING AND COMMISSIONING OF 3 NOS. CHECK DAM GATE OF BHAGAPOSI CHECK DAM, 3 NOS. CHECK DAM GATE OF DHOBADHARA CHECK DAM AND 2 NOS. CHECK DAM GATE OF THAKURANIBEDA CHECK DAM OF PATNA BLOCK UNDER M.I DIVISION, KEONJHAR.
Repair and maintenance of plus two College at Rengali Dam Site
Barrage construction work
Providing and Laying Paver Block from RD 00m to 225m to Earth Dam top of Lower Indra Irrigation Project.
Improvement to D/S Slope of Earth Dam from RD 384m to RD 540m of Lower Indra Irrigation Project
Supplying and installation of 250KVA,33/435KVATransformer near Control Room at Dam Site, Tikhali of Lower Indra Irrigation Project.
Engagement of unskilled labour for operation and maintainance of dewatering of foundation gallery,water supply and electrical work of Rengali Dam Sub-Division No.II under Rengali Dam Division
Repair and Maintenance of C type Quarters of Permanent Colony of Rengali Dam Division
Renovation of Diversion weir
Construction of Piano Key Weir
FABRICATION, ERECTION, TESTING AND COMMISSIONING OF 3 NOS. CHECK DAM GATE OF BADIA CHECK DAM, 3 NOS. CHECK DAM GATE OF JAYANTA-I CHECK DAM,3 NOS. CHECK DAM GATE OF JAYANTA-II CHECK DAM OF PATNA BLOCK UNDER M.I DIVISION, KEONJHAR
Improvement to Diversion Weir of Aunli Irrigation Project.
Renovation of Jagabandhu Diversion weir at Tala Putibandha.
Cleaning of toe drain and longitudinal drain from RD 384m to 3780m of Earth Dam of Lower Indra Irrigation Project.
Improvement to stone riprap in U/S of Earth Dam from RD 384M to 520M of Lower Indra Irrigation Project
Construction of Cow Ctcher in front of Gallery at Rengali Dam Site
Improvement and widening of roads from NH to Rengali Dam Junction(PhaseII)
Stainless steel grill fencing at Project Guest House at Rengali Dam Site
Imp to Canal of Kusumi MIP Pranadeipur Barrage under MIPSP
Repair and Maintenance of Earthen Dams of Red Mud Pond and Ash pond at Nalco, Damanjodi
REPAIR AND MAINTENANCE OF EARTHEN DAMS OF RED MUD POND AND ASH POND AT NALCO, DAMANJODI
Repair and Maintenance of Earthen Dams of Red Mud Pond and Ash pond at Nalco, Damanjodi
Engagement of hired vehicle used by the D and M Office of the Chief Construction Engineer,Anandapur Barrage project, Salapada for the year 2025-26
IMPROVEMENT TO COMMUNICATION FACILITY FOR RENOVATION OF GOBARDHANPUR BARRAGE
Improvement to JharananallaMIP(Diversion Weir) in Baramba Block of Cuttack District under Improvement to Diversion Weir Scheme for the Year 2026-27.
Improvement to Dam Approach Road from PWD Road to Ghatakeswar Dam.
Desilting and restoration of Rushikulya river U/S of Janivilly Anicut.
Selection of an Agency for preparation of Detailed Project Report for the work Improvement of Road from Mahanadi Barrage to Birupa Barrage and up to Choudwar