6,231 results • Best match
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work
MTPS I Boiler Maintenance V Work shop Inspection and Load Test certification of EOT Crane of capacity 50 10 Tons
MTPS I Mill Plant Replacement of Grinding Rollers and Bull ring segments in any five Mills of Unit I to IV
MTPS I TM Unit IV Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling 2024 25
MTPS I BM Unit I and II Boiler Pressure Parts AOH COH 2024 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I TM UNIT I Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2023 2024
MTPS I Mill Plant Unit II Reconditioning of mill outlet elbow and Ceralin coal bends released from Unit I to III during AOH by patch welding and applying ceramic wear coat
MTPS 1 Mill Plant Unit IV Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies etc
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP/LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days
MTPS 1 Mill Plant Unit I Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings etc
MTPS I TM Retubing of 1 No Gland Cooler I Tube nest by 9010 Cupronickel tubes
MTPS I Mill Plant Unit III Rewinding and rectification of rotor shaft of Kirloskar make 37 KW Seal air fan motor.
MTPS I Mill Plant Unit IV Hot air ducts welding of eroded and wornout portion of hot air duct joints Renewal of insulation and GI sheets and providing guard plates for the expansion joints in hot air ducts 4A to 4F
MTPS I CA CWS II De watering complete cleaning and sludge removal cleaning with bleaching powder including painting the structure of clarifier IV during AOH 2023 24
MTPS I Mill Plant Unit IV Overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venturi vanes and venturi collars during annual overhaul 2023 24
MTPS I BM Unit II Boiler pressure parts AOH 2021 Overhauling of secondary air dampers scanner air fans and its damper flap gate
MTPS I Civil Circle - Cleaning removal collecting loading, transporting and disposal of debris / slush / silt and waste materials etc., in all around Cooling Tower Unit I to IV area, CWPH, Chlorination building, lime softner house and Central Store
MTPS I CA RWS Overhauling of Service water Pump 1 No Water Treatment pump 2 Nos including Interconnection of WTP stage I and II pipe lines Reconditioning of worn out Evaporators in chlorination plant
MTPS I TM Unit II Replacing the existing defective Constant variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during Unit II COH 2024
MTPS I TM I Dismantling Inspection and Overhauling of Pennwalt Centrifuges 4A 4B in Unit IV during COH 2025 26
MTPS 1 Mill Plant Unit III Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I BM Unit III Boiler Pressure Parts AOH 2024 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit III Boiler Pressure parts AOH 2022 Maintenance of boiler drum and all safety valves and allied works
MTPS I TM Unit III Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line and suction discharge flange Gaskets
MTPS I M I CA CWS I Cooling Tower II Overhauling of Flow Control Valves and including reconditioning of released FCV spares during AOH 2025 2026 of Unit II
MTPS I BM Unit IV Annual maintenance 2021 22 Overhaul of ESP AB pass Internals and related works
MTPS I Mill Plant Unit III Overhaul of Hot air dampers and Cold air dampers cold air gates and Hot air gate power cylinder and renew the damaged hot air gate seals during Boiler statutory inspection 2020 21
MTPS I Mill Plant Unit III Overhauling of classifier assemblies repairing of eroded venturi vanes venturi Collars during AOH 2021 22
MTPS I TM Unit III Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs Renewal of BFP leak off line
MTPS I Mill Plant Unit IV Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos in Mill 4A to 4F during Annual overhaul 2023 24
MTPS I TM I Unit II Annual Maintenance work in Main Turbine and its Auxiliaries during 2021 22
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Servicing of various size actuators and allied works
MTPS I Mill Plant Unit IV Removal of accumulated ash from the Horizontal portions of the mill inlet hot air duct at 45 mtr and 18 mtr level for mills 4A to 4F during AOH 2024 25
MTPS I BM UNIT II Boiler pressure parts COH 2024 Inspection and Rectification of worn out lines and bends of Super heater header drain lines etc
MTPS I BM Unit III Boiler Pressure parts AOH 2021 Maintenance of boiler drum and all safety valves and allied works
MTPS I Mill Plant AC Plant N E Room Unit I to IV Fabrication and Erection of New G I duct with supply air grill Dismantling the ideal duct in the Mini conference hall by removing the false ceiling perforated particle board Erecting etc
MTPS I BM Unit II AOH 2022 23 Flue Gas duct A side Patch up works and other repair works between APH out let to ESP inlet
MTPS I CA CWS I Reconditioning of GRP fan blades 2 set of Cooling Tower ID fans of Unit I AND II
MTPS I TM Unit IV Overhauling of OLCTC System Pump LHS and RHS Inspection Cleaning of Condenser CW box steam side Hot well OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve and Condenser
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Servicing of various size actuators and allied works
MTPS I TM Unit III Overhauling of Valves in Feed Water Main Condensate and Extraction Steam lines during Annual Overhauling 2022 23
MTPS I BM Unit IV Boiler Pressure parts AOH 2022 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I Civil Circle Annual Over haul 2025-26 Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower IV
MTPS I BM Unit I Annual maintenance 2023 2024 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS RHS Inspection Cleaning of Condenser CW box steam side Hot well OLCTC System Ball collecting Screen Overhauling of 200 mm condenser air release cum vacuum breaking valve
MTPS I TM Unit III Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC 1 Changing the defective valves ES 3 etc
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate and Extraction Steam lines during bearing high vibration problem rectification work
MTPS I BM Unit II Boiler Pressure parts COH 2024 Overhauling of HP LP valves and replacement of defective valves
MTPS I - Civil Circle - Providing two coats of oil bound distemper to the inner wall surface and painting two coats with enamel paint of steel structures in compressor room Unit III of power house building at MTPS I
MTPS I Mill Plant Unit II Complete inspection of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft if necessary and renewal of worm gear hub Mill bottom Mill bottom cover plate