Loading…
Loading…
1,820 results • Best match
Removing alumina from dam gallery of Obra Dam.
Special repair work of the Azamgarh-Dohrighat road from km- 25 to village Jamin Harkhori (Dhanchhula) and Tal Salona dam, to the Amma Aima link road
Renewal of Bandhi Bisaundha main road of block Ramnagar via village Bisaundha via Arkhan Purva to the boundary of Gunta Dam Link road Km 1(400)
Year 2024-25 Under Road Safety work crash barriers and other protective works in the high embankment areas on the Haribaba Dam to Narora Road VR
Laying of B.O.E. Soling from the dam in Gram panchayat Akhri to Tulsipur barren border through the fields of Rampyari and Vinod Maurya, Block- Rampur Mathura
Construction work of culvert and approach road on the drain Benia dam via Kamla Mauryas house via canal track from village panchayat Andor Kodupur link road
Year 2025-25 Under Road Safety work crash barriers and other protective works in the high embankment areas on the Haribaba Dam to Narora Road VR
Estimate for Cleaning of out fall drain D/s of Sonchar nala From RD 0.00 M. to 390.00 M. at left flank of Earthen Dam Rajghat.
S/E for renovation of Top road of Govind Sagar Dam Between km 0.000 to 3.505 and Right Lalitpur Canal Service Road km 1.220 to 1.550
Jungle clearance U/S and D/S left and Right Afflux bund and repairing of X- drain no. 8,9,10 of left afflux bund of Matatila Dam.
Work of filling the rain formed spill on the left bank of check dam constructed between km 81.420 to 81.485 of Maharajganj Drain in Distt. Reabareli
Construction work of RCC slab culvert in place of damaged culvert in km 08 of the road from Gangoh to Sairajpur Sayed Marg to Yamuna Dam
Epoxy painting of all gate of old rusted M.S surface of gates and appurtences after prepration of surface properly by sand blasting process.At Upper khajuri Dam
Construction work of tin shed in a public place below the hill of Dugarasan Mata Temple on Jamni Dam Road in village Dongarakala of Block Madawara
Repair work of damaged upstream boulder pitching at various places between Km 4.450 to Km 4.895 and Km 9.250 to Km 9.282 of Sharda Sagar Dam.
Providing and fixing vertical steel gates of head regulator of RMC and minors and Dy fixing checker plates on top of super structure Saprar Dam Jhansi
45. Ganga Barrage sthit Dr. Ram Manohar Lohia 200 MLD WWTP plant me filter sankhya 12 ka inlet backwash valve 600 mm vyaas tatha filter sankhya 07 ka inlet gate valve 600 mm vyaas ka sluice valve ki marammat ka karya.
44. Ganga Barrage sthit Dr. Ram Manohar Lohia 200 MLD WWTP plant me filter sankhya 13 ka inlet backwash valve 600 mm vyaas tatha filter sankhya 02 ka inlet gate valve 600 mm vyaas ka sluice valve ki marammat ka karya.
LAYING OF PORCUPINE IN GAP BETWEEN EXISTING SET FOR CLOSING SPILL DOWN STREEM OF BALMIKI BARRAGE AND RESTORATION OF PORCUPINES WITH GRASS AND JHAD-JHANKHAD ON A-B LINK ROAD BUND OF RIVER GREAT GANDAK IN DISTRICT-NAWALPARASI IN NEPAL TERRITORY.
Janpad Champawat ke Antragart Sharda Barrage Banbasa ke Downstream main dayen belbandh ke km. 0.000 se km. 1.120 nepal rashtaye seema tak chatigrasst launching appren ki punarsthapna evem km. 0.935 se km. 1.120 tak apstrim slope par piching ke karya
46. Ganga Barrage sthit Dr. Ram Manohar Lohia 200 MLD WWTP plant me filter sankhya 15 ka inlet backwash valve 600 mm vyaas tatha filter sankhya 01 ka inlet gate valve 600 mm vyaas ka sluice valve ki marammat ka karya.
Embankment protection work and special repair work on the entire route from Gidrapur pakki road to Saraisurjan link road via Bodhikpurwa across the Ghaghra river dam. (VR)
Renovation Work of Old Painted Approach Road from Km 0.000 Tikari Mod Near Bundh No.-1 to 0.650 Ohan bundh No. 2 of Ohan Dam. Lot-5
Renewal work with Annual Repair from PC and type-C seal coat at Km 1, 2, 3, 4(500) of Patharai dam se satpura Link road (VR).
Renovation of Road from zero point to Hydal office and back side of I.C.D office in R/B Colony at matatila dam. (Total Length 2.150 KM)Matatila.
Appointment of Consultant / Expert Agency for preparation of Detailed Project Report (DPR) and Bathymetric Survey of 100 MW Floating Solar PV Plant at Kadra Dam Reservoir, Karnataka
Due to the Mohamedi Mosque from 60 Futa Road in Ward No 54 Chowki Nagar, dam and street construction work in damaged lane up to Liyaqat house.
Section improvement work from Km 1.200 to Km 2.200 of Ramnagar Thuthibari Dam situated on the right bank of Chandan River in Maharajganj district. (Lot No.4)
Clearing of jungle and earth work Clearance of toe drain at Rd 4380 m to 7820 m (3440 m) at left earth dam, (Tondan side)at Rajghat
Clearing of jungle and Earth work parellel Nala RD. 0.00 m To 2455m ( 2455 m) chanderi Road culvert Upto at left earth dam, (Tondan side) at Rajghat.
Enamel painting work on superstructure of Madhya Ganga Barrage Bijnaur
Erection of shutter assembly of Service Gate Rohin Barrage, Maharajganj
Lot No.1
On Occasion of organizing of G-20 Summit and Global Investors Summit in Lucknow city, Repair and painting work of Divider/Footpath, ramp and railing of 06 lane road from Lohiyapath to Gomti Barrage on Ring Road to Khurramnagar on the left embankment
General repair and servicing of Electric/Diesel Pump and Vacuum Pump of Pump House No. 1, 2, 3, 4 and 5 installed at Bakshi Dam Flood Pumping Station.
Manufacturing /casting and providing of Rollar and other parts for Emergency gate of Chandra Pramba Dam (as per BOQ and drawing) F.O.R. at Irrigation Work Shop Division Bareilly.
CONSTRUCTION WORK OF IRON MEMORIAL GATE AT A PUBLIC PLACE IN THE NAME OF SHRI MAHARANA PRATAP JI ON HARIBABA DAM IN VILLAGE-MOHAMMEDABAD DISTRICT- AMROHA (Nidhi Work)
Work of laying of kerbs on the service road near by seepage drain between Km 2.300 and Tindale Room at Km 2.570 of Pilli Dam in district Bijnor.
Construction of pipe culvert with 1200 mm dia NP3 cement concrete pipe and C.C. road both side of culvert of village-Kachnauda in submergence area of Kachnauda Dam.
Renewal work by PC in km 1 2 3 4 5 (500) of the link road from Shivpur to Mahula Garhwal Dam via Indrabahadur Cantonment to Devara Turkchara
General repair and servicing of Electric/Diesel Pump and Vacuum Pump of Pump House No. 1, 2, 3, 4 and 5 installed at Bakshi Dam Flood Pumping Station.
Patch repair work on Bahilpurwa railway station to Dadri road, Bahilpurwa railway station to ohan dam road and Devangna Dadri Markundi road (ODR) in block Manikpur District Chitrakoot
Jungle clearance from Dam, right dyke and left dyke of Obra Dam.
Providing and repairing electrical items/Lighting of Dam Gallery of Obra Dam.
2nd FLOOR UPTRON BUILDING NEAR GOMTI BARRAGE GOMTI NAGAR LUCKNOW 226010
Renovation work of 6 studs built on Azizganj dam for the safety of Mohalla-Azizganj situated on the right bank of river Garra under district Shahjahanpur (Lot No.-06)
Construction work of CC road (with L-type drain) from Mr. SurajpalBalmiki s house to Ranveer s house in Dhakia Dam village of development block Shergarh (MP Fund-Shergarh)
E-tender for disposal of 1,09,619 cubic meter stone (Boulder/Muck) extracted from the excavation of foundation of slipway under the construction work of Kanhar Dam in Sonbhadra district
Construction of 02 nos 132 KV TSS bay for 132 KV Obra Hydel-Dam TSS D/C line at 132 KV Substation Obra Hydel on Deposit Basis under ETD, Robertsganj.
Park Devel opment, Pai nti ng of railli ng,constructi on of new railli ng control room park and parapet Right Si de D/s park of masonary dam Rajghat