Loading…
Loading…
1,820 results • Best match
Providing services of 02 Nos ( Two ) Computer operator one for O/o Chief Engineer Rajghat Dam Project Jhansi ,ONE NO FOR o/O Financial Advisor ( FA ) Betwa River Board Jhansi
Under the Bundelkhand Development Fund (Rajjayansh), the work of new construction of the link road from Tehrauli Khas to the culvert of the Chandwari Marg canal via the Talab Dam.
Fabrication of Trusses, Purline, M.S. Column Pipe, M.S. Plate, M.S. Clit for Durashine shed and Erecting of TATA Durashine shed over superstructure of Regulator gates at Ratauli wear Dam, Mahoba.
Cleaning of cemi circular half round pipe drain and repairing work from RD 4380 m to 8675 m (4295) left top of the dam road at left Tondon side, Rajghat
Construction of temporary bund at Kichha barrage for the year 2022-23
Jungle clearance from Dam, Dykes, in take and off take channel of Obra Dam.
In Vasundhara falling in Ward-54 and 74, work of resurfacing of damaged road from Sa.-01 Hindon Barrage Elevated to Sa.-05 Kanawani Pulia Sewer Pump and from Sa.-07 Vasundhara Police Chowki to Sa.-06 Vaishali Pulia by Dans and work of laying perforat
Repair work of damaged road from H-Block Power House in Ward-15 to HIG in H Block under Vijayanagar Zone through Dam and Interlocking Tiles and construction of RCC drain.
Repair work of erosion caused by flood from Azizganj Dehat via Dam to Gopalpur Nagaria (Ring Road Km-1). In Distt. Shahjahanpur (BC Work) (Hot Mix Plant) (Financial Year 2024-25)
Painting With Exterior Painting of Right Affflux Bund and Road Parapet and Left and Right Cabin ,UP and MP Police chauki and Wierless room of Matatila Dam For Year 2024-25
Sharda Sagar Dam se nikalne wali outlet channel ke km. 0.000 se tail tak dayein evam vayein bank main khadanza lagane ththa head regulator ke pakke karyon ki marammat ka karye.
NAGAR PALIKA PARISHAD LALITPUR KE WARD NO 12 AZADPURA- 3 ME DEVENDRA PANTH KE MAKAN SE CHETRAM RAJAK KE MAKAN HOTE HUE DAM KI OOR C.C. ROAD AVAM NALI NIRMAN KARYA
Construction of pipe culvert with 1200 mm dia NP3 cement concrete pipe and C.C. road both side of culvert of village-Kalyanpura to Gausala marg in submergence area of kachnauda Dam.
Estimate for Cleaning of out fall drain D/s of Sonchar nala Bada Dawla Near Ramnivas khet to 370.00 m. Distance(RD 390.00 to 760.00m.) at left flank of Earthen Dam
Jungle clearance and Earthwork cleaning of out fall drain and Relaying Outfall Drain damaged stone pitching in patches from RD 2.050 KM. (0 to 360M) At right Earthen Flank Rajghat Dam
Epoxy painting work after prescribed blasting method at Madhya Ganga Barrage Gates Bijnor
Carriage and Erection of Super structure of Service Gate of Rohin Barrage, Maharajganj
Conducting an electrical resistivity test (ERT), Inspection of sluice gate mechanical parts, including NDT and underwater survey work , To make operational the top 2 sluice gates of Matatila Dam in Lalitpur district.
Miscellaneous Civil works in D-0 quar-ter like construction of water tank plat-form, pathway and repairing of dam-aged boundary wall etc in Sector B and C of Dudhichua Area
Increasing capacity of 220/132 KV 100 MVA T/F-I to 160 MVA T/F at 220 KV Switchyard ATPS Obra on deposit basis for Obra Dam TSS under ETD, Robertsganj.
DAM TIRAHA SAUCHALAY SE DEHRE MANDIR AVAM SHARDA MATA SCHOOL HOTE HUE SRI KRISHNA KUMAR PANTH KE MAKAN KE AAGE TRANSFARMER KI OOR SADAK KI DONO OOR NALA AUR PULIYA NIRMAN KARYA
Works of saddle dam top and between 2.250 km to 8.000 km of saddle dam road.
Epoxy Painting AT Jargo dam
Morphological Survey on 300 km stretch (160 Km old Stretch and 140 Km New Stretch) of River- Ramganga from D/s of Kalagarh Dam to Bareilly H.O sites under MGD-II, CWC, Lucknow
Under District Lucknow, CC road construction and asphaltization work in village Tiwari Ganj Ayodhya Marg (Faizabad Marg) in Vidhan Sabha constituency BKT, Tamarind Dam Baba Road for about 400 meters. Lot No 4
Pkg No UP 67162 Construction of RCC Box Shell Bridge 5x4.50 mtr. at Km. 08 on Chopan Mahalpur Road to Parsoi via Khewandha Chakari and Obra Dam (Length 25.100 Meter) in District Sonbhadra
Jungle Clearance and Scraping of Gunta Main Canal From Km 0.000 to 15.795
Scraping and Jungle Clearance of Rasin Left main canal 5-80 km and Gajpatipur minor 3.10 km.
Jungle Clearance and Scraping of Rasin Left Main Canal from Km 0.00 to 5.800 and Gajpatipur Minor at km 0.00 to 3.100. TENDER COST-3.78 Lacs Excluding GST
R.C.R. Lining in Budhwal Minor Ist at km 0.00, 0.680, 1.070, and Aqueduct (Ch-1.440) both side of Structures.
Jungle Clearance, Bed cutting and Scraping of Gunta Main Canal From Km 15.920 to 39.600. TENDER COST-11.57 Lacs (Excluding GST)
Scraping and jungle clearance of Rasin Right main canal 5.20 km and Badausa Minor 3.60 km, Mahurai Minor 4.40 km and Sudinpur minor 2.00 km TENDER COST-4.19 Lacs Excluding GST
Jungle Clearance and Scraping of Gunta Main Canal From Km 0.00 to 15.795. TENDER COST-9.65 Lacs Excluding GST
Earth work in Restoration of Budhwal Minor Ist. , Fixing Boundary pillar and Bed Bar From km 0.00 to km 1.392.
Jungle Clearance and Scraping of Gunta Main Canal From Km 15.920 to 39.600
Estimate for Repairing/Renovation of Service Road (Left Bank) of D.M.C. from Km. 0.000 to 1.550
Scraping and Jungle Clearance of Rasin Right main canal 5.200 km and Its minor Badausa minor 3.60 km, Mahurai minor 4.40 km and Sudinpur minor 2.00 km.
R.C.R. Lining in Budhwal Minor Ist at km 2.500, 2.800, 4.050, 4.850, 5.050, 5.780, 5.970, 6.300, 6.400, 6.800, 6.830 and 7.350 both side of Structures.
Estimate for Repairing/Renovation of Service Road (Right Bank) of D.M.C. from Km. 2.000 to 4.500
Earth work Restoration of Budhwal Minor 1st., Fixing Boundary pillar and Bed Bar From km 1.446 to km 7.350.
Bagul bandh par upkaran avam Spaillway Down stream par boulder dumping ka karya.
Tehra Nala avam outfall Drain per boulder pitching ki punarsthapana ka karya.
Puccka structure Repairing in Budhwal Minor Ist at km 0.580, 2.80, 4.07, 6.83, 5.05, 5.075, 5.97, 6.300 and Aqueduct (Ch-1.440)
Restoration of canal fixing boundary pillar and bed bar, R.C.R. Lining, Puccka structure Repairing in Budhwal Minor IInd at km 0.96, 1.045, 1.38, 1.800, 2.400 and Outlets.
Baigul bandh ke down stream me seemankan abam survey karne ka karya.
Baigul bandh ke km 6.800 se km 10.770 ke madhya P.O.P,P.R.well ke safai marmmat avam piezometer lagane ka karya.
M3394236001, M3394236053, M3394236002, M3394236003, M3394236019, M3394236006, M3394236017, M3394230003, M3394230002, M3394236007, M3394236023, M3394236022, M3394236062, M3394236065, M3394060019, M3394066006, M3394060030, M3394060029, M3394060010, M3394066001, M3394060032, M3394066007, M3394060028, M3394060026, M3394060013, M3394060011, M3394060027, M3394066009, M3394060012, M3394060015, M3394060033, M3394060034, M3394066008, M3394060009, M3394991017, M3394991102, M3394991018, M3394991019, M3394991023, M3394991024, M3394991025, M3394991026, M3394991051, M3394991029, M3394991036, M3394991033, M3394991022, M3394991101, M3394126039, M3394126056, M3394126013, M3394126012, M3394126018, M3394126059, M3394126060, M3394126004, M3394126005, M3394126009, M3394126010, M3394126031, M3394126042, M3394126053, M3394126061, M3394126002, M3394226052, M3394226014, M3394226015, M3394226016, M3394226032, M3394226019, M3394226030, M3394226036, M3394226049, M3394226020, M3394226043, M3394226050, M3394226051, M3394226029, M3394226011, M3394226027, M3394226033, M3394211121, M3394211137, M3394211141, M3394211122, M3394211123, M3394211131, M3394211112, M3394211144, M3394211145, M3394211118, M3394211002, M3394116006, M3394116017, M3394116020, M3394116018, M3394116019, M3394116033, M3394116036, M3394116026, M3394116041, M3394116009, M3394116005, M3394116040, M3394116039
Super Structure Painting at Moosakhand Dam
Carriage and Erection of Liftting Mechanism and Rollar assembly of Service Gates of Rohin Barrage
Supplying and engaging staff for regulation of Ch. C.S.M.G. Barrage Bijnor for 16.09.2017 to 15.10.2017