Loading…
Loading…
1,820 results • Best match
Painting work of Prarpet wall and Cleaning of top drain RD 370 m. to 1320 m. Left Flank of Rajghat Dam.
2026-27 Renewal Work with ordinary repair of Sukwa Dhukwa dam road (Jhanwar) to poorakhurd link road in km 1,2(050)
Block Dilari ke gram Bajidpur me Primary vidhyalaye / panchayat bhawan se dam dama nadi ki aur mitti khadanja / Puliya Nirman karye
Construction of stone masonary stair on D/S slope of left flank at ch. km. 1.420 of Kanhar Dam at Amwar
Construction of stone masonary stair on D/S slope of right flank at ch. km. 2.200 of Kanhar Dam at Amwar.
Construction of Inspection Road of Gulariya Dam (Top Road) From Km. 0.000 to Km. 2.150 and Km. 2.377 to Km. 3.170
Pilling work A1, P2 and A2 for Construction of Kosi River Bridge at Khod-Tanda Road (Lalpur Dam) in Distt. Rampur.
4- Atal bhujal yojana ke antargat karwi me gram panchayat samara charandasi me dhoda nale par check dam/rapta nirman karya.
Janpad Jhansi ke vibhin tank, dam evam jheel ko Ken-Betwa Link canal se jodne ke karya ke liye sarvekshan karya.
Special repair work of the road in km 1 to 6 of the road from Sanauli to Kunda Kalna Yamuna Dam
Repair work of damaged V.R.B. situated on Cross Drainage of Pili Drain starting from pili dam collecting Drain in district Bijnor.
Fabrication and Erection of Tata dura shine colour coated steel shade as per drawing on super structure of Upper khajuri Dam.
Village Sabha Construction work of road from Prem Sagar Mishra garden in Mahuva Pakri to Siddharth Nagar dam to the north.
CC construction work from Ranjeet Ahirwars farm to Gargauli Check Dam in village Garrauli of development block Jaitpur in Mahoba district.
Project for construction of boundary wall for security of departmental land situated downstream of Sahzad Dam as per NIT Lot -3
Providing new roller cage assembly of other way Gates Number 4, 12 and 18 by replacing damaged rollers at Ram Ganga Barrage, Harevali, including replacement of roller cage assembly plate and new rollers pin
Construction Work Of Road On The Right Side Of The Canal From Gopia Barrage To Joganiya Bridge In Gramsabha-Joganiya Iin District Bahraich Financial Year 2024-25 (Vidhan Sabha-Balha) With Five Year Maintenance
Providing new roller cage assembly of Under Sluice Gate Number 1, 2 and 3 by replacing damaged rollers at Ram Ganga Barrage, Harevali, including replacement of roller cage assembly plate and all roller pins
sarda barrage banbasa ke upstreem mein isthit dayen guidbundh ke KM 0.000 se KM 0.400 tak (Tail Race Channel Tak) bundh ke top par interlocking tiles lagane evm safty pairapit ke nirman ke kary
Hiring of mud pump for sand/earth work at river flood zone, as per Departmental specifications, for protection from flood and erosion at upstream side of Madhya Ganga Barrage situated on river Ganga, Distt.Bijnor
Composite work of levelling Excavated/Dredged material by tractors with leveler karaha, as per Departmental specifications, for protection from flood and erosion at upstream side of Madhya Ganga Barrage situated on river Ganga, Distt.Bijnor
Composite work of levelling Excavated/Dredged material by tractors with leveler karaha, as per Departmental specifications, for protection from flood and erosion at upstream side of Madhya Ganga Barrage situated on river Ganga, Distt.Bijnor
Manufacture and Replacement of new C.S. Main Roller Assembly
Enamel painting work as per detail in document and BOQ
DURA SHINE SHADE AT BANGANGA BARRAGE
Gomti river front per rabar dam (sp office) se gandhi setu (LHS) ke madhya audyanik karya ka 01 varsh ka rakh rakhao.
Renovation of road back side lake via main garden gate to ball fountain in matatila garden at matatila dam (Total length 0.710Km)
Renovation of Top Service road including ramp road with special repair at left flank of Bandai dam From km. 0.000 to 1.450
Round the clock patrolling of Ash Disposal pipelines and AWRS pipelines of 5x200MW BTPS, Obra from Positive Tiraha to Chakari Ash Dam
Making internal road no.04 with paver block and both side drain of rehabilitaion area of Tikaratiwari phase-III at Kachnoda dam
Bed and Berm scrapping and Jungle Clearance work of Ghat Rajwara Minor From KM. 0.000 to 4.000 at Pathrai Dam Lot 4
Renovation, painting and maintenance of D/s of Jali work RD 655.00 M TO 2305 M. Left flank of Rajghat Dam, Rajghat
Renovation of Service Road with special repair of Kurar Main Canal from Km. 0.00 to 10.00 at Kurar Dam(Lot no-1)
Bed and Berm scrapping and Jungle Clearance work of Left Main Canal From KM. 0.000 to 9.400 at Pathrai Dam Lot 2
Renewel of road from Chadhraudhwari main canal to ds spillway inspection road from km .0.00 to 0.560 of Pathrai dam(Lot-7)
Bed and Berm scrapping and Jungle Clearance work of Right Main Canal From KM. 0.000 to 15.400 at Pathrai Dam LOT 1
Construction work of link road to Benia dam via Kamla Mauryas house via canal track from village panchayat Andor Kodupur link road
Renovation of Top Service road including ramp road with special repair at right flank of Bandai dam From km. 0.000 to 1.400
Construction and Maintenance Works of District Gonda Under Pkg No UP 3091 Road T05-BELSAR NAWABGANJ ROAD TO PD DAM DHEMWA GHAT
Bed and Berm scrapping and Jungle Clearance work of Chadraudhwari Main Canal From KM. 0.000 to 2.200 at Pathrai Dam Lot 3
H. of vehicle for carriage of dam./ rep. new d./ T/F for RAPDRP T.Kandhala and IPDS alum u edd-2 sml
Under District Gorakhpur, Construction of Pitch work from irrigation dam to expensive house in village Garyakol of Block Gagha. Lot No 1
Raising of Baghadu to Bhisur existing road from km. 0.890 to km 1.025 for protecting it from submergence of Kanhar Dam Reservoir.
Comprehensive AMC (Annual Maintenance Contract) including Operations for Real Time Sensing and Monitoring Stations of Water Level and Discharge of Banbasa Barrage, Sarda Sagar Reservoir and Sarda Main Canal from Km. 0.00 to Km. 45.00
Comprehensive AMC (Annual Maintenance Contract) including Operations for Real Time Sensing and Monitoring Stations of Water Level and Discharge of Banbasa Barrage, Sarda Sagar Reservoir and Sarda Main Canal from Km. 0.00 to Km. 45.00
Janapad Pilibhit ke antargat wifercation se sharada sagar dam tak km 0.000 se Km. 4.500 tak ki lambai mein gaddha mukti ka karya
Cleaning work of sump and mesh of Pump House No. 1, 2, 3, 4 and 5 installed at Bakshi Dam Flood Pumping Station.
Supplying and Placing Stone boulder in G.I. Wire Crate for Making Launching apron in D/S of Spillway at Ratauli Dam. (Lot-1)
Cleaning work of sump and mesh of Pump House No. 1, 2, 3, 4 and 5 installed at Bakshi Dam Flood Pumping Station.
Ward-02 me Dam Bhakra ki puliya se kewal ki dukan tak C.C. Tiles Interlocking Road va Nali Nirman Karya (As per Estimate)