Loading…
Loading…
2,409 results • Best match
Repairs to Nachan Dam from ch. 4.00 to ch. 28.00 and ch. 41.00 to ch. 51.00 of LBMC for Boro Irrigation of Nachan Kandar Irrigation Scheme of Durgapur Section No. II under Damodar Headworks Sub-Division in Ps-Faridpur, Block-Durgapur Faridpur, Dist.-
Guarding arrangement through Registered firm organized by Ex-Military person for WTP and floating barge structure site near Murguma Dam site of Jhalda Augmentation W/S Scheme under Purulia Sadar Sub-Division, PHE Dte. (w.e.from 01/09/2019 to 31/08/20
Const of cement concrete road from Afflux Dam to Raju Hotel near Puthiya Mandir via Rabiul Sk to Jamal SK house.Mainul SK via Paikora Mathpara Masid T Puthiya, Borojumla under Sekhalipur G.P in Raghunathganj-II block( XV F.C and UNTIED- 2020-21)
M/R to different types of structures at Ch. 14.00, Ch. 28.00, Ch. 74.00, Ch. 86.00 and Ch. 103.00 of L.B.M.C.including painting and lettering of Dam water level gauge of Beko Irrigation Scheme under Block and PS- Kashipur, Dist.- Purulia for khariff
Patch repair of surface of Ramkanali Panchet Dam Road 6.00 km to 10.00 km by 20 mm premix surface and seal coat (type B) under Raghunathpur Sub Division under Purulia Division PWD in the district of Purulia during the financial year 2023-24.
Running repairs and maintenance of L.B. Main Canal in between Ch. 0.00 and Ch. 118.00 and R.B. Main Canal in between Ch. 0.00 and 97.30 of Jamgari Dam in connection with Khariff Irrigation 2023 under P.S and Block Gangajalghati Dist Bankura of Asan
Guarding arrangement through Registered firm organized by Ex-Military person for WTP and floating barge structure site near Murguma Dam site of Jhalda Augmentation W/S Scheme under Purulia Sadar Sub-Division, PHE Dte. (w.e.f.01/01/2021 to 31/12/2021
Impvt upgradation of Moutorejore I Scheme by resectioning of RBMC from 6450m to10410m, Dy 1 to 6 of RBMC, total length 13740M with lining of the canal in diffnt chainage including impvmt of Dam Dyke at Block Raghunathpur, Purulia Dist Balance work
Restoration work of the road after laying of Water Pipe Line at Ramkanali Railway Station to Panchet Dam Road from 4.80 km to 10.80 km under Raghunathpur Sub-Division, PWD of Purulia Division PWD during the year 2023- 24 (Raghunathpur W/S Scheme
Guarding arrangement through Registered firm organized by Ex-Military person for WTP and floating barge structure site near Murguma Dam site of Jhalda Augmentation W/S Scheme under Purulia Sadar Sub-Division, PHE Dte. (w.e.f.01/05/2022 to 31/08/2022
Preventive measures for flood fighting by supplying empty cement polybags to T D D Sub Division Godown Amta in Block Amta I P S Amta Dist Howrah during monsoon of 2024 under Lower Damodar Construction Sub Division No IV of Lower Dam
Clearing and removing of water hyacinth for the period of July 2024 to 30 Th November 2024 in between Gumgar to Ronjoyber of Maja Damodar Length 3.0 Km Block PS Udaynarayanpur under Lower Damodar Construction Sub Division No IV of Lower Dam
Running repairs and maintenance of L B Main Canal in between Ch 54.00 to Ch. 118.00 R.B. Main canal in between Ch. 53.00 to 97.30 of Jamgari Dam in connection with khariff irrigation 2025 under P.S. Block Gangajalghati Dist. Bankura of Asansol
Sarbari Tiluri Panchet Dam Road ( Panchet Portion) Temporary Restoration work due to Flood or Excessive Rainfall from Ch 2.00 km to 2.370 Km 2.80 km to 4.240 km and 4.40 Km to 6.00 Km (In stretches) in the district of Purulia during the year 2025-
Repairing Potholes with mending depression in stretches from 0.00 to 1.50 Km, 2.10 to 3.00 Km, 3.60 to 4.50 Km.....20.00 to 21.20 Km and 22.50 to 22.80 Km of Kalijhora Dam to Mandir khola Road via Panbu Dara Road under Kalimpong Division,P.W.D.
CONSTRUCTION OF CC ROAD WITH CC DRAIN INCLUDING RCC SLAB FROM HOUSE OF ANKUR CHANDRA PAUL TO HOUSE OF SUJIT DAM UNDER MAL MUNIUCIPALITY, Ward - 10, AC-20 (Mal), Booth 128, Project(s) Id. No-APAS/01/020/128/0001, Source of Fund-APAS Fund
Maintenance and repair to the 1 numbers inlet on left bank of river Ghea and 1 no inlet on left bank of river Julkia and repair of Chandanpur bridge within GP Babnan and Chandanpur Block Polba Dadpur and Haripal in District Hooghly under Lower Dam
Clearing and removing of water hyacinth and other congestion from July 2024 up to 30 Th November 2024 from Old Damodar for length of 15.00 km in Block Shyampur I P S Shyampur under Lower Damodar Construction Sub Division No IV of Lower Dam
M-R to lining work at different spots of HMC from ch.0 to ch. 186 and ch. 188 to ch. 210 under Dam Section in Block and p.s.- Khayarasole under Hinglow (I) Sub-Division of Mayurakshi South Canals Division for the year 2026-27
M/R to canal 6MC from Ch 816.00 to Ch 969.00,6LMC Ch 0.00 to Ch. 322.00 6JMC from ch. 0.00 to 140.00,L1MCfrom Ch. 0.00 to 106.00 including all WC in connection with kharif Irrigation - 2023 under Kusumgram Section of D.C.No-1 Sub Division within Dam
Repairing of drain and cover slab from Halder Bhavan to Karbala Club and from H/o Nirmal Dam to H/o Chaitanya Nandi at 2 no. goli of (part no. 91) in ward no. 18 under Madhyamgram Municipality. (Fund-APAS), (Project ID-APAS/ 01/118/91/0005)
M/R to inspection path of right bank of PC from Ch. 40 to Ch. 60 and Ch.75 to 80 for an effective length of 700.00 M at Village-Palishgram, G.P-Simulia-II under Mongalkote Block, Dist. Purba Bardhaman under Katwa Irrigation Sub-Division of EEII, Dam
UPLIFTING OF CONCRETE ROAD FROM HO TARUN ROY TO JOYDEB CHOWDHUARY HO PAPPU ROY TO AMAL MITRA HO SISHIR DAM TO RAMA ROY AT GOLABATI STREET HO MAYA RANI DAS TO SAMBHU NATH DAS NETAJI CLUB TO BIMAL ACHERJEE TO ARUN SARKAR AT BHANGAN PARA AT WARD NO 2
Sirkabad-Ajodhya-Bagmundi Road, Clearing and grubbing and restoration work of scoured embankment from 4 to 5 Kmp, 7 to 9 Kmp, 11 to 12 Kmp, 15 to 18 Kmp, 21 to 23 Kmp, 24 to 26 Kmp and link road towards PPSP Upper Dam and Hatinada under PHD.
FLOOD RESTORATION WORK OF ROAD FROM KULDAHA MAJPARA SITALA MANDIR TO KULDAHA GOM DANGA IN MANOHARPURII GRAM PANCHAYET UNDER CHANDRAKONA DEVELOPMENT BLOCK IN THE DISTRICT OF PASCHIM MEDINIPUR under PathashreeIII Length of the portions 2KM
As per bid document
Electric Ceiling Type Fan (V3) ISI Marked to IS 374 (Q2)
SMART INTERACTIVE DISPLAY BOARD 86 INCH WITH OPS & 1X4-4R HDMI SPLITTER AND WITH INSTALLATION
UPPER SEALING RING 6TK, BOTTOM SEALING RING 6TK, ISOLATING SEAL WITH BRASS NOZZLE, VAPOUR SEAL, NEOPRENE SHEET, NEOPRENE RUBBERCORD, NEOPRENE RUBBER CORD, RUBBER CORD NEOPRENE, RUBBER CORD
Purchase of oil guide (upper) of oil header segment installed in Generating units of TLDIVPS
Purchase of 03 Nos. Rotating Shaft Sleeve with nut and stud for TLDPIV Power Station
Purchase of server along with windows server operating System for TLDP-IV Power Station
ANABOND RTV 666, 100 GB2 B36M TUBE, GRINDING GOGGLES, TUNGSTEN CARBIDE 10X10MM, P30, RH, FINISHING, DPT TEST KIT, HOSE CLAMP 1 and 1 by 2, HOSE CLAMP 4 INCH, D.A. REGULATOR 2 STAGE, SAFETY BELT DOUBLE ROPE DOUBLE HOOK, LINE DORI 5MM, MUG PLASTIC 1 LTR CAPACITY, HEXA NIPPLE 3 by 4 INCH, NIPPLE 3 by 4 2084 4S 1, MS NIPPLE 3 by 4 INCH, GI UNION 3by 4 INCH, GATE VALVE 3 by 4, MS BALL VALVE 1 by 2, M.S.UNION 1 by 2 INCH, PRESSURE GUAGE 0.6KG PER SQCM, PB2PH, MARKIN CLOTH, SANDER WHEEL FOR AG 4, SANDER DISC DIA.125 MM, GRIT SIZE 60, CENTER PUNCH 6 INCH, HAMMER 2000 GRAM, HAMMER-1KG., M SEAL STEEL PUTTY, CUTTING PLIERS, 8 INCH by 210 MM, MOLYCOTE GREASE, WELDING HOLDER 400AMP, COLGATE POWDER, SIZE 100 GRAM, GLOVE VALVE NB25, BRASS, MS PLUG 3 by 4 INCH, GLAND PACKING, SIZE 8 MM, GLAND PACKING 10MM, Gland packing, 12mm, LATHE SQUARE CUTTING TOOL BIT SIZE 1 by 2 INCHX8, DRY PRESSURE GUAGES 0 to 100 KG per CM SQUARE 3 by 8 BSP, HSS TAP SET SIZE 12X1.75, HSS TAP SET SIZE 10X1.5, HSS M16X2.0 METRIC TAP SET OF 3, HSS DRILL BIT 10.5MM, HSS DRILL BIT 14MM, HSS DRILL BIT 17.5MM, HSS DRILL BIT WITH CARBIDE TIP, STRAIGHT SHANK, 21 MM DIA., DRILL BIT 23MM, HAND TAP SET 8X1.25 MM, PLASTIC FUNNEL 150ML, SS PARRELEL RIMMER 25 MM, S.S ALLEN KEY SCREW M10X1.5X25, MS PLUG 1, TARPOLIN 2MX30M
Servicing of SERTEL’ s GPS Master Clock system including Supply of Items required for Servicing of SE
Supply, Transportation, Installation and commissioning of 24 W solar Street light under CSR scheme o
Upgradation of the Portable Engineering Workstation of the SCADA System for Power House, TLD IV PS
Procurement of Modified Sill Beams for Spillway Stoplog Gate of TLD-IV Power Station
Purchase of Heat Exchanger Plates with Gasket for Cooling Water System of Power House, TLD-IV PS
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2)
Purchase of 3 PHASE 4 WIRE DIGITAL/ELECTRONIC TRI- VECTOR ENERGY METER for measuring units generation
Sleeve and Spool of Main Distributing Valve(MDV) G-40
Maintenance of ACBs (Air Circuit Breaker) installed at TLD - IV Power Station, Kalijhora
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)
welding electrode 7018, 3.15 x 450 mm, Welding Electrode 7018, 2.50 x 350 mm, Welding Electrode 6013, 3.15 x 450 mm, Welding Electrode 6013, 2.50 x 350 mm, Welding Electrode 309 Mo 15, 3.15 X 350 mm, Gouging Rod, 3.15 x 350 mm, Welding Holder, 600 Amp, Welding Helmet, Welding Hand Gloves
Purchase of 220 KV 4400PF Capacitor Voltage Transformer
10X11 Double Ended SPANNER SINGLE, 10X11 RING SPANNER SINGLE, 12X13 Double Ended SPANNER SINGLE, 14X15 Double Ended SPANNER SINGLE, 21X23 Double Ended SPANNER SINGLE, 21X23 RING SPANNER SINGLE, 8X9 Double Ended SPANNER SINGLE, CENTER PUNCH 150MM, CHIPPING HAMMER, 500GM, COMBINATION PLIER 8 INCH, DOUBLE ENDED SPANNER 6x7 to 30x32, DOUBLE RING SPANNER 6x7 to 30x32, FLAT CHISELS 150MM, SLEDGE HAMMER 2KG, SLEDGE HAMMER 1KG, ALLEN -KEY 06MM, ALLEN -KEY SET, NEEDLE FILE SET, PNEUMATIC SOCKET 24MM, S.S SOCKET 14MM, S.S SOCKET 15MM, S.S SOCKET 16MM, S.S SOCKET 18MM, S.S SOCKET 19MM, SCREW DRIVER HEAVY DUTY 300MM LONG, SCREW DRIVER SET, SOCKET SET BOX, THREAD TAP SET 12MM, THREAD TAP SET WITH HANDLE 10MM, TUNGSTEN CARBIDE ROTARY BURR CUTTER 10X20MMX70 MM CYLINDRICAL TYPE
Purchase of Tablet as per DTS for TLD-IV Power Station
Purchase of All-in-One PCs with MS Office for TLDP-IV Power Station
50 Mbps Internet Lease Line Connectivity for TLD-Iv Power Station
Supply and Application of Wear Protective Coating on Runner Blades and Runner hub of Turbine instal