Loading…
Loading…
7,167 results • Best match
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc.under Pattana Pragathi Program in ward No.9,10,20,21 & 22 in Peerzadiguda Municipal Corporation under Municipal General Funds /Pattana Pragathi Funds For the year 2022-23
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward No.3,4,5,6,7 & 8 in Peerzadiguda Municipal Corporation under Municipal General Funds /Pattana Pragathi Funds For the year 2022-23
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward No.1,2,11,13 & 14 in Peerzadiguda Municipal Corporation under Municipal General Funds /Pattana Pragathi Funds For the year 2022-23
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward 15,16,17,18 & 19 in Peerzadiguda Municipal Corporation under Municipal General Funds /Pattana Pragathi Funds For the year 2022-23
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward No.1,2,3,4,5,6,7,8,9,10,11 & 12 in Peerzadiguda Municipal Corporation under Municipal General Funds/ Special Sanitation drive for the Year 2023-24.
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward No.12,23,24,25 & 26 in Peerzadiguda Municipal Corporation under Municipal General Funds /Pattana Pragathi Funds For the year 2022-23
Engaging JCB, tractor with trolley, Dozer and Labour for Removal of garbage, Construction and Demolition Waste and Removal of road side bushes and etc. under Pattana Pragathi Program in ward No.1,2,11,13 & 14 in Peerzadiguda Municipal Corporation under Municipal General Funds/Pattana Pragathi Funds For the year 2021-22
Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC
AE for Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on
2nd Call for COMBINED RESIDENTIAL CUM COMMERCIAL AREA SOLID WASTE HANDLING, STREET SWEEPING, LITTER COLLECTION, DRAINS CLEANING AND OTHER SANITATION ACTIVITES AND REMOVAL AND TRANSPORTATION OF CONSTRUCTION AND DEMOLITION(C&D) WASTE FOR A PERIOD OF THREE YEARS ON "BUY/HIRE,OWN,OPERATE" BASIS IN GUDUR(N) MUNICIPAITY
3rd call for Combined residential cum Commercial area solid waste handling, street sweeping, Litter collection, Drains cleaning and other Sanitation activities and Removal and Transportation of Construction and Demolition waste (C&D) for a period of 3 years on Buy/Hire,Own,Operate (BOO) basis in Kavali Municipality
CONSTRUCTION OF GOS TRAINEE MESS WITH 20 ROOM FOR TRAINEES INCLUDING DEVELOPMENT WORK INCLUDING ELECTRICAL WORK, C/O R.C.C ROAD FROM ADMIN BLOCK TO DEMOLITION GROUND AND C/O ROAD FROM SHIVAJI GATE TO ADM. BLOCK AT COMBAT WING ITBP, ACADEMY, MUSSOORIE. (SH:-BALANCE WRK). (2ND CALL). Subwork/Packages: BALANCE WORK
CONSTRUCTION OF MULTISTORIED RESIDENTIAL FLATS FOR CENTRAL BANK OF INDIA STAFF AT T NAGAR CHENNAI SH PREPARATION OF DIGITAL TOPOGRAPHICAL SURVEY PLAN, EXISTING BUILDING FLOOR WISE PLAN FOR DEMOLITION APPROVAL AND SITE SOIL INVESTIGATION AND MISC WORK Subwork/Packages: CONSTRUCTION OF MULTI STORIED RESIDENTIAL FLATS FOR CENTRAL BANK OF INDIA STAFF AT T NAGAR CHENNAI SH PREPARATION OF DIGITAL TOPOGRAPHICAL SURVEY PLAN AND MISC WORKS
DEMOLITION, LAND DEVELOPMENT, CONSTRUCTION OF BOUNDARY WALL FOR CATALYST PLANT AT IOCL PANIPAT REFINERY
RIVER STONE, CEMENT BAG, WOODEN GARDER 12 FT, RIVER SAND, DEMOLITION HAMMER DRILL MACHINE
Demolition and C/o cement concrete pavement from RD 0/435 to 0/454
Roofing sheet replacement, PVC Septic tank chamber construction, demolition and rebuilding of wall etc
Area clearing,Demolition of flexible pavement, soling and concrete works, PCC and RCC works.
Area clearing, excavation, Brickwork demolition, RCC works, RCC Precast slabs for new culvert, Plastering
Demolition of RCC work, floor tiles, steel work, cement concrete and painting etc. DMFT
Demolition of defunct water Over Head Tank in Fatehpur Beri in AC-46 (Chhattarpur).
Demolition of godown no. 1,3,4,6,12 and 13 and clearance of site at Siliguri Warehouse.
Demolition of RMB Building at Burdwan Medical College and Hospital, Purba Bardhaman (3rd Call)
Removal of Permanent and Temporary structures demolition at different road side under Bolpur Municipality
Demolition and Re-construction of Jatav Chopal at village Bhorgarh in Narela AC-01.
Demolition and Re-construction of Harijan Chopal at Village Bakner in Narela AC-01.
construction of 3 lakh litre capacity over head tank with 20 mtr staging height and demolishing dismantaling of existing 3 lakh litre capacity OHT with 20 mtr staging height as per dismantaling methodology as per NIT condition at AG colony shsastri nagar gwalior SH L supplying and installation of pumps and panel for over head tank Subwork/Packages: work
Alteration Renovation of Directors Room by PF Vitrified tiles flooring and cladding dado after demolishing the existing damaged wooden flooring & wall panelling and vitrified tiles wall lining external and internal finishing work of new office building in ICAR ATARI Zone II Jodhpur (SH Construction of toe wall along the approach road and sides of office building beyond the path)
Design and Construction various building for WHO-GCTM Permanent Campus at Jamnagar, Gujarat including all internal and external, civil, Electrical & Mechanical service, all external civil & E&M Development works & Horticulture works etc. all complete ... and Demolishing of ...
Minor Structural Repairs Demolishing and recasting of damaged unsafe gutter drain wall at the roof (225-229), replacement of damaged RCC Chajja with FRP, repair of plinth, damaged paver blocks, damaged wall plaster, beams columns and other misc. repairs to building No.225-229 (5 Nos.) Type-IV Buildings in Sector-VI, Kane Nagar, Antop Hill, Mumbai-37.
Load Bearing Structure with GCI Sheet Roof.
ELECTRIFICATION OF DOUBLE STOREY GENERAL CHOPAL AT VILLAGE HAMID PUR IN ALIPUR BLOCK
ELECTRIFICATION OF DOUBLE STOREY BALMIKI CHOPAL AT VILLAGE MUKHMELPUR IN ALI PUR BLOCK
Repair renovation
Providing a new store
Custom Bid for Services - Demolition of the vacated unauthorised hutments total 100 units at Nanak Nagar and Dhipa sahi Basti at Gua Ore Mines under the relocation campaign process to clear the land for upcoming projects at GOM of Gua Ore Mines Per.. Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Seven Point Six Two mm Sig Rifle Chart, Seven Point Six Two mm AK 203 Chart, Seven Point Six Two mm NEGEV LMG Chart, MMHG Chart, SAKO SNIPER chart, 84 mm RL MK IV Chart, 84 mm RL MK III Chart, Five Point Five Six mm INSAS Drill Carts, MMHG CUT SEC ... CHARGE DEMOLITION NO ... CHARGE DEMOLITION NO ... CHARGE DEMOLITION NO ... CHARGE DEMOLITION NO ... CHARGE DEMOLITION NO ...
Demolishing brick works , Demolishing RCC works, Painting , Tile work , False ceiling etc New wiring installation at the lab and library are proposed to charge from this DB.3 nos of AC points are proposed at library near to the lab.One 4 Module etc
Demolishing and reconstruction of boundary wall on Left Bank of Supplementary Drain from RD 6150m to RD 6550m
Demolishing and reconstruction of boundary wall on Left Bank of Supplementary Drain from RD 5700m to RD 6100m.
Demolishing, Solid block masonry work, wood work, ceiling, plastering, painting, Drill work, FRP door, Plumbing and Electrical works
Demolishing of existing abandoned Over Head Tank of C-Block, Naraina Vihar under AEE(M)-39 Rajender Nagar.
Clearing grass, Ring bund, earthwork, demolishing cement concrete, chipping of concrete, centering and shuttering, CC Steel reinforcement, plastering
Demolishing and reconstruction of various culverts on Kirari Sulaman Nagar Drain from RD 4140m to RD 0.0 m
Cost of Demolishing the existing damaged culverter and construction a new culvert in the compount of Mudickal Depot
Clearing grass demolishing CC earth work excavation CC 1 4 8 CC1 3 6 centering and shuttering etc
Demolishing and Re-construction of Double Storey Shisodia Chaupal at Village Mukandpur in Burari Constituency in Distt. Central
Construction of outer boundary wall of 3 meter height after demolishing existing boundary wall at Lakhimpur Kheri BP
Demolishing and Reconstruction of Double Storey Gurjar Chaupal at Village Rampura in Tri Nagar Assembly Constituency AC-16.