Loading…
Loading…
837 results • Best match
Removal of Jungle and Silt clearance of Sub Lat-1 of Lat-5 from Ch 0.00 to 4.618 km of WBC of D-9A NRBC.
Package estimate for Silt removal & Jungle clearance of of Distributary-2, lateral 1& 2 of Distributary-2 & Lateral-1 of Distributary-4 of MLIS-1
Zonal no.07 Ward No. 31 Silt removal and cleaning work in the Nala at Vajpayee Nagar From A-Block to C-Block & E-Block.
Desilting Machine (Q3)
Desilting Machine (Q3)
Desilting Machine (Q3)
Desilting Machine (Q3)
Desilting Machine (Q3)
Dredging and Development of the River Bed Near Chand Mulla farm in Kannolli Gram Panchayat
Supply of Materials to Dredging and Development of lake at Obannanahalli village in Challakere taluk
Dredging and Development of the River Bed in the Field of Mallappa Biradar of Kannolli Village
Removal of Junglee and Silt clearance from ch 6.00 to 9.00km of Dy-15 & from 0.00 to 4.00km of Lat 12of Dy-15 of MBC (Selected reaches)
Removal of Jungle & Silt clearance from Ch.0.00 to 1.50km of Lat-5 and Ch.0.00 to 1.85km of Lat-6 of BD-1 of Dy16 NRBC.
Removal of Jungle and Silt clearance in Lat 4 of Dy-18, Lat 5 of Dy-18 and Lat 06 of Dy-18 of MBC (selected reaches)
Removal of Jungle and Silt clearance of Lat no.4 (from 0.00 to 1.11km) Lat no.5 (from 0.00 to 1.39 km) of BD-5 of Distributary-15
Removal of Junglee and Silt clearance from ch 0.00 to 2.00km, from ch 2.00 to 4.00km and from ch 4.00 to 6.75km of Dy-18 of MBC (Selected reaches)
Removal of Jungle and Silt clearance of Lat no.6 (from 0.00 to 2.51 km) Lat no.8 (from 0.00 to 1.90 km) of BD-5 of Distributary-15.
Removal of Jungle and Silt clearance of Lat-3 from 0.00 to 2.44Km & Lat-4 at ch.0.00 to 3.38km of SBD of BD-1 of NRBC Dy-15.
Package estimate for Silt removal & Jungle clearance of lateral 1,2,3,4& 5 of Distributary-1,Distributary-5, from Ch. 7.00 km to tail end of Distributary-3 OF MLIS-1
Maintenance Dredging at New Mangalore Port for the years 2026-27, 2027-28 and 2028-29 (03 Years)
Post Monsoon maintenance dredging at New Mangalore Port for the year 2020-21, 2021-22 and 2022-23
Removal of Silt-Mixed Sand Deposited During Dredging in the Stream at Kodikanyana Jetty, Brahmavara Taluk, Udupi District.
DREDGING AT BARMOUTH AND SELECTED REACHES OF COMMERTIAL CHANNEL OF OLD MANGALORE PORT FOR THE YEAR 2024-25
Removal of Jungle Clearance of from 0.50 to 7.50km and silt removal in 0.5 to 4.00km of wadavatti branch canal of NRBC Dy-9(A). 2)Removal of Jungle Clearance of Lat-1 from 0.40 to 2.8km & Lat-3 from 0.70 to 5.00km & silt removal in lat-1 from 0.40 t0 1.6km & lat-3 from 0.70 to 2.90km of Wadavatti branch canal of NRBC Dy-9(A).
Package Tender of 1) Desilting of Drain at 31 Bejai ward 2)Desilting drain at 32 Kadri North ward 3)Desilting drain at 33 Kadri South ward 4)Desilting drain at 34 Kadri Shivabagh ward in MCC limits
Removal of Junglee and Silt clearance from ch 0.00 to 4.00km of Lat 01 and from ch 0.00 to 2.00km of Lat 03 of Dy-18 of MBC (Selected Reaches)
Removal of Jungle & Silt clearance from Ch.0.00 to 1.30 km of Lat-2 and from Ch.0.00 to 5.36 km of SBD of BD-2 of NRBC Dy-16.
Removal of Jungle and Silt clearance of Lat-23 from Ch 0.00 to 1.69 km & Lat-24 from Ch 0.00 to 2.82 km of BD-1 of NRBC Dy-15.
Removal of Jungle & Silt clearance of Lat-9 from Ch.0.00 to 2.53km & Lat-10 from Ch.0.00 to 2.95km of SBD -1 of BD-1 of NRBC Dy-16.
Drain cleaning, jungle cleaning and silt removal for village sanitation in all villages (Basavanhal, Basavanhal gollarahatti, Rampura, Lingadahalli, Lingadahalli lambanihatti) of davangere taluk basavanhal village, mainly in SC/ST colonies.
Package Tender of 1)Desilting of drain at 48 Kankanady Valencia ward 2)Desilting of drain at 55 Attavara ward 3)Desilting of drain at 57 Hoigebazar ward 4)Desilting of drain at 59 Jappu ward in MCC limits
Desilting of drains
Removal of Jungle & Silt clearance from Ch.0.00 to 1.57 km of Lat-6A and from Ch.0.00 to 1.45 km of Lat-8 of BD-2 of NRBC Dy-16.
Removal of Jungle & Silt clearance from Ch.0.00 to 1.48 km of Lat-3 and from Ch.0.00 to 4.07 km of Lat-5 of BD-2 of NRBC Dy-16.
Removal of Jungle & Silt clearance from Ch.0.00 to 2.170 km of Lat-2 and from Ch.0.00 to 2.350 km of Lat-3 of BD-3 of NRBC Dy-16.
Removal of Jungle & Silt clearance from Ch.0.00 to 1.87 km of Lat-1 and from Ch.0.00 to 1.76 km of Lat-1A of BD-3 of NRBC Dy-16.
Removal of Jungle and Silt clearance of Lat-5 at ch.0.00 to 2.62 km and Lat-6 from 0.00 to 1.70Km of SBD of BD-1 of NRBC Dy-15.
Post Monsoon Maintenance Dredging at New Mangalore Port for the years 2023-24, 2024-25 and 2025-26 (3 Years)
K Katapur Lake Desilting
Jungle clearance and silt removal of selected Reaches of GLBC Main Canal, Mudhol Branch Canal & other connected canal network & other repair work coming under Mudhol sub division for the year 2025-26
Package Tender of 1) Desilting of Drain at 44 ward 2)Desilting drain at 49 ward in MCC limits
Desilting of drains
Desilting of nahla around Shivanagara STP Plant
SUPPLY OF DESILTING MACHINE FOR CMC HOOTAGALLI
Package Tender of 1) Desilting of Drain at 41 Central ward 2)Desilting drain at 42 Dongrakeri ward 3)Desilting drain at 43 Kudroli ward in MCC limits(Category-II(A)Reserved)
Package Tender for 1)Desilting of drain at ward No 35 and 36 2)Desilting of drain at 38 Bendoor ward 3)Desilting of drain at 39 Falnir ward in MCC limits
Construction of break water, marine structure with allied civil works, dredging and reclamation for fishing harbour at Kulai, on EPC basis
Dredging and Development of the River Stream in the field of Ramesh Siddappa Naganeswar of Gadyal village in Kannolli Gram Panchayat
Desilting of drains
SUPPLY OF VEHICLE MOUNTED DESILTING MACHINE TO UDUPI CMC