Loading…
Loading…
739 results • Best match
PREPARATION OF MASTER PLAN FOR THE EXISTING AND PROPOSED DEVELOPMENT OF SMMKDA AT MAHADESHWARA HILLS, HANUR TQ CHAMARAJANAGAR DIST.
Preparation of Detailed Project Reports (DPRs) for SWD.BCWD.HLK.PKG-3. 1. Construction of D.Devaraj Urs Back Ward Class Post-Metric Boys Hostel at Muttugaduru. 2. Construction of D.Devaraj Urs Back Ward Class Post-Metric Girls Hostel at Village in Holalkere Taluk (BCWD-2291) (2 works)
Selection of Consultant for Preparation of Detailed Project Report for Development of Tourist Destinations and Restoration of mining affected area with Karnataka Mine Environment Restoration Corporation Under CEPMIZ Scheme Development of Tourism Infrastructure through Various Activates at Chitradurga District
Tender for selection of consultant for PREPARATION OF GIS-BASED MASTER PLAN-2041 FOR THE VEMAGAL-NARASAPURA LOCAL PLANNING AREA
Consultancy services for Preparation of Detailed Project Report(DPR) and estimates including survey, detailed investigation, preparation of designs, drawings for Modernization of Ranikere Feeder Canal network (Canal re section, lining, & Canal structures, including bridges, Aqueduct, Under Tunnels, Super passages etc) and also submission of strength checking reports of existing canal structure and SBC test reports, including flow measurements, preparing detailed plans and designs and DTP for the work
IMPROVEMENTS TO ROAD CONNECTING SUTTUR MUTT GUEST HOUSE ROAD TO PWD SUBDIVISION OFFICE IN MASTERPLAN AREA OF MMHILLS IN HANUR TALUK
Preparation of Detailed Project Reports for a.Package No.04 Improvements and Resurfacing to road from 1.Yeshwanthnagar Main Road to Gandi Narasingaswamy Temple road from km 0.00 to 0.75 2.Sulthanapura to DRDO road from km 0.00 to 2.90 3.Toranagallu to join NH (Military farm) road from km 0.00 to 1.60 4. Link road Near H Madhapura to Taluk border road from km 0.00 to 2.70 5.Yeshwanthnagar village to Field (Raghapura) road from km 1.00 to 4.00 6. Approach Road to S.Gangalapura road from km 0.00 to 0.70 7. Road connecting Yeshwanthnagar road from km 0.00 to 0.35 8. Taranagar to Villge Limit road from km 0.00 to 0.80 and 9. Nagalapura to Joga road from km 0.00 to 8.50 and 10. Kurekuppa to Taluk Border road from km 0.00 to 1.77 villages in sandur Tq Ballari Dist
Selection of Consultant for Preparation of Detailed Project Report for Destination Development of World Heritage site Hampi Arts, crafts and Cultural village, Restoration, Last mile connectivity, Interpretation and other Tourism Infrastructure Facilities at Kamalapura, Hosapete, Hampi, Vijayanagara District under CEPMIZ Scheme.
Preparation of Detailed Project Report for Improvement of Ravihal-Itigihal MDR road From KM. 1.55 to KM 3.87 and Construction of box culvert on Ravihal-Itigihal MDR road at km 2.30 and 3.50 Under CMIDP grant for the year 2025-26.
Selection of Consultant for Preparation of Detailed Project Report for Development of Tourist Destinations and Restoration of mining affected area with Karnataka Mine Environment Restoration Corporation Under CEPMIZ Scheme Construction of Natural Treatment Yoga and Dhyana Centre at Sanganakallu Bellary
Consultancy services for preparation and submission of detailed project report for construction of checkdam across local nala near Iralgaddi, Umalihosur and Jagirpannur village in Sirwar taluk and construction of checkdam across local nala near Jagirpannur village in Manvi taluk Raichur district.
Consultancy service Estimate for preparation of DPR for Construction of Lift Irrigation Scheme from Arkavathi River near Kalegowdanadoddi village to fill Bolappanahalli Tank, Arehalli Tank, Belagumba Tank and other Tanks in Ramanagara Taluk Ramanagara District.
Sangolli Rayanna Circle development on Birur Sammasagi Road under the jurisdiction of Davangere-Harihara Urban Development Authority in the master plan
Detailed Survey drawing, Plan and Structural Drawing, Detailed Estimate with furnish in all respect and successful completion of project
Preparation of Detailed Project Report for Construction of Bridge On State Highway-230, Highway Connecting from Ujjini(On SH-45) to Thumbaraguddi road Via Sunkadakallu, Nagalapura, Kudligi, Sovenahalli, Vaderahalli, Chornur road at Ch.13.10(Near Nagalapura Village), in Kudligi Taluk, Vijayanagara District
Consultancy services for preparation and submission of detailed project report for construction of checkdam across local nala near Kamalgera & Goldinni village in Sirwar taluk and construction of checkdam across local nala and nala clearance near Chikalparvi village in Manvi taluk Raichur district.
Consultancy services for preparation and submission of detailed project report for construction of checkdam across local nala near Janekal, Amaravathi, Gavigatta and Aldal village in Manvi taluk and construction of checkdam across local halla nala in Bailmerched village in Manvi taluk Raichur district.
Consultancy services for preparation and submission of detailed project report for construction of checkdam across local nala near Yegnur, Devanpalli, Vadavatti and Bejangera village in Raichur taluk and construction of checkdam across local nala near Utaknur village in Manvi taluk Raichur district.
Consultancy service for submission of Detailed Project Report for the work Constrction Seris of Check Dam At survey No. 23 and 24 Flowing Near Halawagali village in Koppal taluk of Koppal district. Constrction of Check Dam At survey No. 180/5 Flowing ... for DPR along ...
PREPARATION OF DPR Construction of Check dams across Adaguru Kanchinabare halla, Gonisomanahalli-Tattehalli Bare Halla, Halla near Girikallahalli-Tattehalli, Halla near Girikallahalli, Idalla halla near Ganguru, Halla near Mathighatta (Kodikoppalu) Bara halla near Hulikere, K G Mandi halla near Maranahalli, Kettappayyanakere halla near Halebeedu, Halla near Chilanayakanahalli, Halla near Hagare Mudibetta and Halla near Channenahalli Sri Satya Nikethana trust in Belur taluk Hassan district.
Conducting total station survey for Internal sewer network, outfall sewer network, rising main pipeline, STP land and preparation of hydraulic design of internal sewer network, rising main, wetwell, sewage pumps, STP etc and preparation of DPR for the work of providing UGD scheme to Afzalpur town under DC works of TMC, Afzalpur Shall be read in conjuction with Section II Terms of reference of the bid document
Consultancy Services for Preparation of DPR, Architectural, Structural and other services Drawings for the works of (1) Construction of civil works, Human Resources for Strengthening of existing district Hospital, Ballari (HR for 2 years) (2) Strengthening of existing 300 bedded district Hospital, Ballari and Upgradation of District Hospital from 300 to 400 Bedded Hospital with necessary Equipment and human resources as per IPHS standards for 2 years.
Construction of CC Road From Anjaneyaswami temple to Sub Road at Benki Nagara Ward Under Harihara city Limit As per Master Plan.
Construction of CC Road in the survey no.203/3 of Kundawada Village in Davanagere as per the Master plan Continuation Work
Selection of Consultant for Development OF Master Plan for Development of World Heritage UNSECO Sites Belur Halebeedu and Somanathapura as Tourist Destination
Providing Consultancy Services for Preparation of DPR and Construction drawings for all series including Structural Design Drawings and all allied Works of Construction of Bridge Across River Krishna between Krishna Kittur and Khemalapur In Athani Taluk of Belagavi District. Including Preparation of Detail report of Major Bridge/ Road Survey, fixing of Alignment, LiDAR/DGPS/Total Station Survey, Identification of Government Land availability, Land acquisition survey, Preparation of Land Acquisition Proposals, Detail Soil Investigations and Site supervision during the excecution of work, Document Printing, etc., complete as per Directions of Engineer in Charge (inclusive of Consultancy service taxes, local taxes, duties, fees, levies, vetting of structural design from IIT/IISc and other impositions imposed under the applicable law on the consultants but Including GST charges).
Consultancy Services for DPR Preparation in Bangalore Revenue Division
Development of Park which is located in the Rs No 9/2 mahajenahalli, Harihara Taluk within the limit of Davangere Harihara master plan
Preparation of Detailed Project Report for Construction of Box Culvert On MDR-31103, Road Connecting SH-131 Kotturu to Banavikallu(SH-131) road Via Kodihalli, Rampura, Sunkadakallu, Palayyanakote, Suladahalli road at Ch.9.70 and Km 9.99 (Near Sunkadakallu Village), in Kudligi Taluk, Vijayanagara District
Consultancy service for conducting topographical survey and preparation of Detailed Project Report for the work of Improvements to Kabini right bank canal from ch. 0.00 km to Ch. 140.0 km & Remodelling of Kabini right bank canal from Ch. 140.0 km to Ch. 180.0 km
Consultancy services for preparation and submission of detailed project report for construction of checkdam across local nala near Siddarampura, Kasbe camp, Gousenagar, Rajalbanda and Hosa Maliyabad village in Raichur taluk and construction of checkdam across local nala near Udbal village in Manvi taluk Raichur district.
Preparation of Detailed Project Report for the work of Improvements to road vattumurani-ts kudlur MDR from chainage km. 0.00 to 2.50 and Construction of box culvert at ch. Km. 0.45 in Siruguppa taluk, Ballari district, under CMIDP grant for the year 2025-26.
Consultancy services for preparation and submission of detailed project report for construction of bridge cum barrage across local nala between Korvi to Rabankal road and construction of bridge cum bridge across local halla nala between Manvi and Korvi village in Manvi taluk of Raichur district.
CONSULTANCY SERVICES FOR PREPARATION AND SUBMISSION OF DETAILED PROJECT REPORT FO 1) MARALDINNI TANDA, MATTUR TANDA IN MASKI BARRAGE CUM BRIDGE 2)PROVIDING NEW LIFT IRRIGATION SCHEME FROM BALAGANUR-BADDILAPUR-UDBAL VILLAGE HALLA TO (NARAYANUR VILLAGE) IN MASKI CONSTITUENCY OF RAICHUR DISTRICT. (Package-2)
Preparation of Detailed Project Reports for Package No. 1 Improvements and Resurfacing to road from B. Gollarahatti Road to DB. Halli Road from km 0.00 to 2.30, D. Upparahalli to MDR Chornur road from km 0.00 to 1.26, Approach road to D. Upparahalli from km 0.00 to 0.70, Jigenahalli Village to Tippanamaradi-Hirehal Road from km 0.00 to 2.83, Devigiri to MDR road from km 0.00 to 6.01, Swamihalli to Camp A/R road from km 0.00 to 1.30, Jigenahalli Village Road to Bommagatta Village from km 0.00 to 2.70 and Hiral to Bandri-Chornur road from km 0.90 to 3.50 in Sandur Taluk, Ballari District.
Consultancy for preparation of Integrated Township Master Plan and Infrastructure Plan for the proposed Rehabilitation and Resettlement project of KPCL at Angul District, Odisha.
Consultancy services for preparation of DPR, Estimate and DTP for the work of Survey Investigation, Design of Scada and PLC system for pumps to maintain the required discharge in canal network of ILC and scada system for canal network management system from Ch. 0.00 to 97.300Km ( including main canal/Dys/Lats/ Dpos) and from Ch. 97.300 to 147.00Km of INDI LIFT CANAL (including main canal / Dy s head regulators)
PROJECT MANAGEMENT CONSULTANTS (PMC) FOR PREPARATION OF DPR FOR TP OFFICE ROADS,DRAINS AND BUILDING WITH WATER SUPPLY/UGD,RETAINING WALL INCLUDING SURVEY DESIGN SERVICES.CONSTRUCTION DRAWINGS FOR ALL SERVICES, STRUCTURAL DESIGNS INCLUDING STRUCTURAL DRAWINGS FOR BUILDING AND ASSISTANCE IN TENDER PROCESS. EXECUTION AND SUPERVISION OF WORKS, ASSISTANCE IN BILLING PROCESS AND ALSO 3RD PARTY FOR THE URBAN INFRASTRUCTURE WORKS IN THE NEGALUR ROAD AT TP GUTTAL IN HAVERI DISTRICT.
PROJECT MANAGEMENT CONSULTANTS (PMC) FOR PREPARATION OF DPR FOR CREMATORIUM BUILDING WITH ROADS AND DRAINS,WATER SUPPLY/UGD INCLUDING SURVEY DESIGN SERVICES.CONSTRUCTION DRAWINGS FOR ALL SERVICES, STRUCTURAL DESIGNS INCLUDING STRUCTURAL DRAWINGS FOR BUILDING AND ASSISTANCE IN TENDER PROCESS. EXECUTION AND SUPERVISION OF WORKS, ASSISTANCE IN BILLING PROCESS AND ALSO 3RD PARTY FOR THE URBAN INFRASTRUCTURE WORKS IN THE IJARI LAKMAPUR HINDU SMASHAN AT CMC HAVERI IN HAVERI DISTRICT.
Regarding the Service tender for the selection of detailed project report and selection of Project Development and Management Consultants (PDMC) for propose to establishment of an information/lecture center on the life history of Buddha in a new building located in Kanaganhalli, Chittapur Taluk, Kalaburagi District.
Consultancy services for survey, investigation and preparation of design, drawings, estimates, Detailed project Report, package estimate & DTP for the works of improvement and development of Nala/Tank/Rajkaluve/Tank Filling workand Construction of checkdam/Bridge/Box culvert and other allied works in Shiggaon & Savanur Taluk, Haveri District.
Consultancy charges for preparation of Architectural Plans & Elevations, Structural Designs, Drawings and Detailed Project Report for proposed Construction of Construction of Bridge Across Krishna River Near Burdipad to Connect Burdipad Village to Naradagadde Island. In Raichur taluka, Raichur District. Under Fund For the year 2025-26.
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Economic Analysis, Survey, Plan Design, Preparation of Estimates, Cost Structure etc., for Implementation of 30MLD External Water Supply Scheme to Raichur Growth Area, Deosugur 2nd phase Housing Layout, Yeramaras, Raichur Industrial Area from Krishna River in Raichur Taluk, Raichur District and Implementation of 20 MLD External Water Supply Scheme to Nandur Industrial Area 1st phase, 2nd Phase, 3rd Phase, Kapnoor Industrial Area 1st Phase, 2nd Phase, 3rd Phase from Bheema River in Gulbarga District on Total Turnkey Basis.
Printing and Binding of Books on DPR Krishna
PROCUREMENT OF FKM TIGHT JOINTS FOR DPR FOR
Construction of a road from Pamenahalli Village to Tholahunase SH-76 under the juridiction of the Davanagere-Harihara Urban Development Authority Under The Master Plan.
PREPARATION OF DETAILED PROJECT REPORT, TO THE PROPOSED CONSTRUCTION OF 1704 DWELLING UNITS (G PLUS 3) AT HANCHYA VILLAGE SURVEY NO.65 CHAMARAJA CONSTITUENCY AS BUILD AND TRANSFER BASIS USING APPROVED MONOLITHIC SHEAR WALL SINGLE POUR TECHNOLOGY WITH SINGLE STAGE ALUMINIUM SHUTTERING UNDER PRIME MINISTER AWAS YOJANA (U)
Preparation of Detailed Project Report for Construction of Bridge On State Highway-226, Road Connecting from (NH-50) Banavikallu to Kallahalli road via Kadekola, Makanadaku, Chokkajogihalli, Siddapura, Hosahalli, Hulikere, Khanamadugu, Aluru, Kenchamallanahalli road at Ch.13.10 and Km 14.70 (Near Chikkajogihalli to Siddapura Road), in Kudligi Taluk, Vijayanagara District
Development of Park which is located in the R S No 18/2B of mahajenahalli village of harihara within the limit of Davanagere Harihar master plan
Preparation of Detailed Project Reports for a. Package No.03-Improvements and Resurfacing to road from 1. Kodihalli to Join AnkammanaluBandri road from km 0.00 to 1.19 2. Krishnanagar to Sandur Bypass road from km 0.00 to 1.40 3. SRS Halli to BandeBasapurathanda road from km 0.00 to 3.50 4. Genatikatte to Mallarahalli via Nalla Banda road from km 0.00 to 3.47 5. MDR to MDR near Genatikatte road from km 0.00 to 0.99 6. Approach road to Uchenahalli from MDR road from km 0.00 to 1.90 7.H.K.Halli road to join taluk border via Ucchennahalli road from km 0.00 to 2.68 and 8. Approach road to C.K. Halli& on to MDR road from km 0.00 to 1.72 9. Doulathpura to Singanakere road from km 1.10 to 2.14 and 10.Agrahara to join Sovenahalli S Lakkalahalli road from km 0.00 to 1.50 in SandurTaluk.