Loading…
Loading…
11,290 results • Best match
ENGAGING TECHNICAL CONSULTANT FOR FINALIZATION OF ALIGNMENT AND PREPARATION OF FEASIBILITY STUDY ON EPC MODE FOR DEVELOPMENT OF POONCH URI ROAD TO NHDL SPECIFICATIONS TENTATIVE LENGTH 120 KM IN UT OF JAMMU AND KASHMIR UNDER BHARATMALA PRIYOJANA
Hiring of Consultants - Milestone/Deliverable Based - SELECTION OF AN AGENCY FOR CONDUCTING INFRASTRUCTURE GAP STUDY AND FEASIBILITY STUDY FOR THE DEVELOPMENT OF 13 (THIRTEEN) IDENTIFIED AGRI- CLUSTER ZONES IN TO EXPORT ZONES IN THE STATE OF GUJARAT; ..
Consultancy Services for Carrying out Feasibility Study and Detailed ProjectReport of Jalori Pass Tunnel 4.200 Km including approaches on Sainj0.00 Luhri Aut 97.00 Road NH 305 from Km. 46.080 to Km. 57.00 in theState of Himachal Pradesh.
Custom Bid for Services - Consultancy Package for Detailed Feasibility Study FSRFR for Augmentation of Railway siding Infrastructure Systems including Over Head Electrification and ST for Gadarwara STPP StageII 2x800 MW Similar Category Empanelment of Consultants/Service Providers
ERECTION OF 33/11KV INDOOR SS WITH 2NOS 8MVA PTRS ALONG WITH CONSTRUCTION OF CONTROL ROOM, COMPOUND WALL ALONG WITH MS GATE AND BORE WELL, CABLE TRENCHES, POWER TRANSFORMER PLINTHS, TOILET BLOCK, ELECTRIFICATION, SANITARY AND WATER SUPPLY ... OF MASTER PLAN CIRCLE, ... OF MASTERPLAN ZONE ...
Selection of Agency for Preparation of Solid Waste Management Detailed Project Reports (DPR) and Providing Project Management Consultancy Services During Implementation of The Project
providing Technical Assistant for Badgaon to Kavita MasterPlan 100ft.Road Site supervision in UDA Dn-IV through agencies.
Consultancy Services for preparation of DPR for 1. 4 Lane with PS from km 37.40 to km 66.7 of NH-848 and 2. 4 lane from km 0.00 to km 4.200 , km 7.200 to km 10.00 of NH-848A 3. 4 Lane with PS from km 24.200 to km 28.600 of NH 848B in Valsad District
Preparation of DPR-(i)Topographical survey at 20m cross section interval covering minimum 30m corridor (ii)Soil investigation of pavement and structures (iii)Geometric design of road (iv)preparation of pan & profile drawings & (v)Cost estimates for the work of Improvements to Gajwel to Rajivrahadari PWD via Mutrajpally from km 0/0 to 7/2 in siddipet district
Preparation of DPR (i) Topographical survey at 20m cross section interval covering minimum 30m corridor (ii)Soil investigation for pavement and structures (iii)Geometric Design of road (iv)Preparation of plan & profile drawings& (v)Cost estimates for the work of Improvements to Markook to Narayanpur road from km 0/0 to 10/0 in siddipet District
Preparation of DPR (i)Topographical suurvey at 20m cross section interval covering minimum 30m corridor (ii) soil investigation for pavement and structures (iii)Geometric design of road (iv)Preparation of plan & profile drawings & (v)cost estimates for the work of Improvements toPWD road to Koluguru via Ahmadipur from km 0/0 to 4/0 in siddipet distrcit
Consultancy Services for Preparation of DPR, Architectural, Structural and other services Drawings for the works of Construction of New PHC building at Theerthapura village of Chikkanayakahalli taluk for already sanctioned PHC, Construction of New Sub Center building at Somanahalli, Theerthapura (Theerthahalli) and Chikkabidare villages, Renovation of Taluk General hospital, Chikkanayakahalli and provision of Supernumerary medical officer.
PROVIDING CONSULTANCY SERVICES FOR PREPARATION OF DPR ,STRUCTURAL DESIGN DRAWINGS AND ALIGNMENT WORK FOR Proposed construction of RCC Multi Cell Box Culvert on Madanamatti Side and Maheshwadgi side Along with service road/Ramp for the approaches of the on going Maheshwadgi Bridge (Bridge Code N-BGK-JAM-27) takenup by KRDCL Across Krishna river in Bagalkot District.
PROVIDING CONSULTANCY SERVICES FOR PREPARATION OF DPR AND CONSTRUCTION DRAWINGS FOR ALL SERVICES INCLUDING STRUCTURAL DESIGNS AND DRAWINGS ALONG WITH ALL ALLIED WORKS OF PROPOSED CONSTRUCTION OF BRIDGE ON NAGARGALI-KATKOL SH-138 AT 40.40KM. (NEAR PARISHWAD VILLAGE ACROSS MALAPRABHA RIVER) IN KHANAPUR CONSTITUENCY OF BELAGAVI DISTRICT UNDER HOA 5054-80-190-0-01-132 (KRDCL) for 2026-27.
Reconstruction of Bridge 4vents of 7.00 m across polaraj drain in km 2/6 of BG Road to GPK Road via Dakaram Putlacheruvu in Krishna District. Sub-work: Preparation of DPR for reconstruction of Bridge(4vents of 7.00m) across Polaraj drain in Km 2/6 of BG Road to GPK Road via Dakaram Putlacheruvu in Krishna District
Main work-Construction of vented causeway in Nuliveedu-Pandikunta-Korlakunta road (KDMD-313) at km 16/2-4 in YSR District (Across Local vagu) Sub Work-Conducting Pre survey Investigation and Preparation of DPR for Construction vented causeway in Nuliveedu-Pandikunta-Korlakunta road (KDMD-313) at km 16/2-4 in YSR District (Across Local vagu)
Consultancy services for preparation of Detailed Project Report for Rehabilitation Upgradation Widening of existing Highway to Rigid Pavement two Lane with Paved Shoulder of NH 965DD from Lonand Shirvar Bhor Mandangad Pachral
Preparation of DPR for Rejuvenation of Water Body at ward no-11 within Dalkhola Municipality under AMRUT 2.0
Preparation of DPR for DEVELOPMENT OF MASS HOUSING COLONY BY WAY OF FLATTED ACCOMMODATION AT PADGAMPORA DISTRICT PULWAMA
Preparation of DPR for reconstruction of approach road at Kumarganj RIDF Godown, in the district of Dakshin Dinajpur.
Preparation of DPR for reconstruction of approach road at Egra RIDF Godown, in the district of Purba Medinipur.
Preparation of DPR for rejuvenation of water body at 28, Aprakash Mukherjee Lane, under HMC, ward no - 25
Preparation of DPR of roads for different blocks under PMGSY IV in the jurisdiction of WBSRDA Hooghly Division
Preparation of DPR of roads for different Blocks under RIDF XXXI in the jurisdiction of WBSRDA Hooghly Division
EOI for Hiring of Consulting Agency for identification of site, preparation of DPR and preparation of tender documents
Preparation of DPR for Shyamchak Mini PWSS, Panchla Block under Sadar Sub-Division of Howrah Division PHE Dte.
SELECTION OF CONSULTANCY FIRM FOR PREPARATION OF DPR FOR VARIOUS CDP ROADS WITHIN BHUBANESWAR DEVELOPMENT PLAN AREA ,BDPA
(SH Preparation of DPR including project feasibility, Hydraulic studies, Studies related fieldwork completed in all respect by outsourcing.)
Preparation of DPR for reconstruction of internal road at Balurghat RIDF Godown, in the district of Dakshin Dinajpur.
ENGAGEMENT OF CONSULTANTS FOR PREPARATION OF DPR FOR VARIOUS PROJECTS WITHIN WBSRDA, KALIMPONG DIVISION UNDER GORKHALAND TERRITORIAL ADMINISTRATION
Preperation of Detailed Project Reports for the roads Bathenapalli to Dokupadu upto CG border from 0/0- 10/0, Bathinapally to Thippapuram from Km. 0/0-5/0 and Punugudu Chelaka to Sampathnagar from Km.0/0-25/0 in Bhadradri Kothagudem District.
Preperation of Detailed Project Reports for the roads Muthyalampadu X road to Cheemalapadu (via) Thadikalapudi from Km.0/0 -18/0 and Bethampudi to Lekhyathanda (via)Abbireddygudem, Maddiralathanda, Bhadruthanda, Thummalachelaka and Petranchilaka from Km.0/0- 25/0 in Bhadradri Kothagudem District.
Construction of BT Roads , Additional proposals of roads/ bridges in LWE affected areas under RCPLWEA Scheme ( 2019-20) of (R&B) Division, Mancherial Priority road Sl.No.1,3,7,12,13 &14(Six Roads 25.50 Kms ) in Mancherial District Sub Work : ... of Detailed Project Reports
Construction of BT Roads , Additional proposals of roads/ bridges in LWE affected areas under RCPLWEA Scheme ( 2019-20) of (R&B) Division, Mancherial Priority road Sl.No.4,5,10 & 11 ( Four Roads 22.10 Kms ) in Mancherial District Sub Work : ... of Detailed Project Reports
DPR
Hiring of Consultancy Services for Construction of Pre Fab Structure (PUF) which should include complete Drawings of Footing, Truss etc. Including details of Doors Windows, Complete Estimates , BOQ in form of Detailed Project Report. Design Drawing
Redevelopment of Master Plan 80ft. wide Road to Connecting of 100ft. wide Road in Meera Nagar Residential Scheme. (2703)
Preparation of Detailed Project Report for Collection of Data and Preparation of Alignment and Land Plan Schedule for the formation of Arni ByPass Phase II town
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam
Construction of CC Drain, CD Work and RCC Nalla at Master Plan 100ft. Road Revenue Village Shobhagpura. 7105
P and F of Octagonal Pole and LED Light at Master Plan 60ft. Road near DPS School. 9405
Hard paved shoulder for Master Plan road from Mahatma Gandhi to Awadhpuri at BHEL Sub Div 3, Bhopal
Appointment of Consultant for Preparation of Tourism Master Plan for Tourist Spots Within Navi Mumbai Municipal Corporation Area
Selection of Consultant for Preparation of Master plan for beautification of Kaliapani Township in the district of Jajpur.
RFP for Selection of Consultant for Preparation of Master Plan for Integrated Logistics Corridor in Paradeep, Jagatsinghpur, Odisha.
Appointment of Consultant for Preparation of Hydraulic Modelling and Master Plan along with Water Audit for Solapur WSS
D/O PRATHALA CHOWK (CONSTRUCTION OF FLYOVER ON MASTER PLAN ROAD NO.3 AT PRATHALA CHOWK), NOIDA, (UP)
Special repair works for the Crime Branch CID office building at Master Plan Complex VIRUDHUNAGAR in Virudhunagar District
CONSTRUCTION OF ROAD OF PROPOSED MASTER PLAN 100 FEET WIDE ROAD AT EAST SIDE OF KOTA RING ROAD
200 ft. ring road par sithya grid ke pass prativit 120 ft. master plan road ka nirman karya