Loading…
Loading…
2,805 results • Best match
Improvement of various works under 2nd Installment of Untied Basic Grant under the award of 15th Finance Commission for the year 2020-21 during the Financial year 2021-22
Construction of 2 Nos. Staff Quarter, Boundary Wall with Gate, Brick Masonry Close Drain and Beautification work of the campus of the Dumunichowki IB under SOPD-G for the year 2022-23.
Improvement of Balijan Path,Sawkuchi From Ch 0.00m to 200.00m under SOPD(G) for the year 2024-25.(Providing load bearing drain, E/W in subgrade soil, GSB, WBM-III and ICBP)
Strengthening of Rd from Shyamananda Lane, Sanjug Setu Pt to Hotel Indraprastha Pt and Con of RCC Cover Drain at Chincoorie Rd to Ambicapatty Chouronge (Left) under MMNPPNA under SOPD-G for 2025-26.P/No.MMNPPNA_2025-26_05_A
Construction of Water Trough_RCC Post with Delivery UPVC Pipe_Road Crossing Culvert_Cattle Crossing Slabs_Main and Branch Canals_Cross Drainage Works_Outlets_Bank Protection Work at intake point.
PVC Flex sheet as per requirement, Voltas Split AC 1 ton 3 Star, AC Stand steel for outdoor, AC Starter, AC Drainage pipe
Grinder Machine, Drill Machine, Green Cloth, Iron Rack, Wooden Triangle, Flex Bd, Wire 6 mm, Push Button Switch, Bell Buzzer, Drainage PVC Pipe
Construction Modernization of toilet and drainage system etc. of Girls Hostel of Govt. BDS Deaf Dumb School, Kahilipara, Guwahati-19 of SOPD-G
Construction Modernization of Academic Building with toilet and drainage system etc. of Govt. BDS Deaf Dumb School, Kahilipara, Guwahati-19 of SOPD-G
Construction Modernization of toilet and drainage system etc. of Boys Hostel of Govt. BDS Deaf Dumb School, Kahilipara, Guwahati-19 of SOPD-G
Construction of Road including Cross Drainage works and 5 years Routine Maintenance for Grp47 Package No (AS232066, AS232068, AS232073, AS232074, AS232076, AS232081, AS232094)
Construction of Car parking with approach, 1 nos. R.C.C Staging and Deep Tubewell, Entrance Gate with Cattle trap, Side drain, repairing and painting of Boundary wall and site development at Dumariguri State Dispensary in Kokrajhar District.
MMPPNA_23_24_39, Improvement of Bishnu Nagar Drain, Haripada Das Road Naliapool, Nandanpur Road, Chiring Chapori, Nij Mancotta Byelane no 2. Old Peasse Cottage Road, Seujpur Byelaen no-5 and Ushapur Rond, 2.Construction of Amolapatty Eidgah Road
Repairing of toilet and Bathroom to control seepage, Repairing Drain apron and misc.of Qtr.NT-01 (Phylis) ,NT-02 (Hmar) ,NT-03(Gogoi), NT-04 (David),NT 05(Barman),NT 06(Aliya Newma) AT ASSAM UNIVERSITY SILCHAR.
MMNPPNA_23_24_105 Improvement of road from Devdooth Point (Metro Bazar) to RRNMU Building point via Circuit House Police Parade Ground with both side RCC covered drain as Gaurab Path under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA)
Sib/AD/19-20/08 Construction of (i) Approach road and side drain to Borkathpar Satra at Konwarpur, Sivasagar, ii) Approach road to Kurekhona Gajala Satra and iii) Approach road to Saudkushi Satra at Konwarpur, Sivasagar
SOPD_G_20_21_217 Improvement of U.N. Brahma Path from Rupnagar Main Road to Ramkrishna Mission Road including construction of RCC retaining wall and RCC drain-cum footpath under SOPD-G for the year 2020-21, East Guwahati LAC
REPAIRS REPLACEMENT OF SEWAGE LINE SEWAGE LINE CLEANING AT ZONE 1 AND ZONE 1A AND REPAIRS TO FOOTPATH AND HARDSTANDING ROAD SIDE DRAIN CULVERT SUNKEN FLOOR AT ZONE 1 TO ZONE 4 UNDER GE S TEZPUR
REPAIRS REPLACEMENT OF SEWAGE LINE SEWAGE LINE CLEANING AT ZONE 1 AND ZONE 1A AND REPAIRS TO FOOTPATH AND HARDSTANDING ROAD SIDE DRAIN CULVERT SUNKEN FLOOR AT ZONE 1 TO ZONE 4 UNDER GE S TEZPUR
MMNPPNA_23_24_208 Construction of Lakhipur Bazar Road with Improvement of both side drain side berm from Thanamore Police point to Lakhipur Shiv Mandir Chariali as Gaurab Path under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the
SOPD_G_2020_21_09 Improvement of Rangmahal Changsari Road (From Ch. 0.00m to Ch 1200.00 M) including RCC Slab cover drain from Ch. 0.00 m to Ch. 500.00 m) under SOPD-G for the year 2020-21, Jalukbari LAC
Construction of Assam Type Security Barrack, Sentry post, reconstruction of Front side Boundary Wall, repairing of Car Garage, Construction of Brick drain around the campus, Improvement of Approach Road and pavement at Judicial Officers campus,Jorhat
SOPD_G_20_21_91 Re-construction of Vivekananda Road Drain Cum Footpath including Box Cell Culvert (from G.C. College to India Club Point) of Ch. 0.00 to 2200.00 m) under SOPD-G for the year 2020-21, Silchar LAC
Construction of APRO Colony improvements at Paltan Bazar area Construction of brick boundary wall along with 2 nos of Iron Gate RCC drain Internal road with paver blocks and earth filling on the low laying areas
Improvement of various works under Guwahati Municipal Corporation
Improvement of various works under Guwahati Municipal Corporation
Improvement of Ganesh Das Path,Sawkuchi From Ch 0.00m to 260.00m under SOPD(G) for the year 2024-25.(Providing load bearing drain, E/W in subgrade soil, GSB, WBM-III and ICBP)
Civil works for road, drain and wall
Cleaning, Renovation and Beautification of the drain
Construction of Road from Shilochi Pathar Tiniali to Niz Baghbar Road including Cross-Drainage works and Routine Maintenance of the works for 5 years
Construction of approach road from NH-31 to Rajib Gandhi indoor stadium from Ch.793.00 to 1000.00 m, Census Bldg. including road side drain under SOPD-G for the year 2020-21,Jalukbari LAC
Construction of (i) R.S.S office Road Connecting (Womens College) (ii) Sasanpara Road (iii) Mahakali Nala Kinar Gaon Road including RCC Box Culvert under SOPD-G for the year 2025-26
Construction of 3 storied R.C.C. gym building, covered gallery on Northern side, brick boundary wall and construction of surface drain around the foot ball ground of the Chamata Anchalik Kriya Sangha, Chamata in Nalbari District (Phase-II)
Expression of Interest for Repairing and carpeting of internal bituminous road and drain from University main gate to Microbiology Department via Central Library and from Students Community Centre to Boys Hostel-1 of Assam University Campus, Silch
MMPPNA_RIDF_XXXI_25_26_440 Improvement of road Baruncherra Katanala PWD Road to Nunai FV Bazar via Kundanala with drain and Slab Culverts under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
Repair/replacement to flooring, joinery, plastering, plumbing, sanitary fittings, sunken floor, certain B/R item, internal wiring fittings, fixation and Repair to footpath, drain, fencing, DG set and connected items at Misa Camp under GE (S) Tezpur
MMPPNA_RIDF_XXXI_25_26_482 Improvement of Road from (1) Akajan Likabali Road at Paulpatty to Sankari Sangha Namghar Chariali Road via Murong Ghar Path including RCC Covered Drain (2) Akajan Likabali Road to Amritpur Boys Club (ABC Club) Road includin
Construction of road from Samaguri to Salpara via Lailuri (SSL) Ch.3200.00m to Ch.3500.00 including RCC Covered Drain with CD work under SOPD-G for the year 2025-26 under Kaliabor and Samaguri Territorial Road Division
Construction of RCC drain with slab cover L 115 M for used water at TR Phukun Road from Sub Registry Office towards NS Road up to Junction of Rabindra Sarani Road Phase 1 at Ward No 2
Construction of RCC drain with cover slab, ICBP work and Junction improvement at Rowta under SOPD to NH-15 (Old NH-52) for the year 2019-20 under PWD, Rangia NH Division in the state of Assam.
MMUPPNA_RIDF_XXXI_25_26_01 (i) Improvement and Widening of Ram Rai Stadium Approach road and RCC Coverd Drain on Swahid Gargeswar Path, (ii) Budarutup approach road under Mukhya Mantrir Unnoto Paki Path Nirman Achani (MMUPPNA) under RIDF-XXXI of NABA
SOPD_SIG_20_21_06 Improvement/Construction of (i) Hembaruah path No. I (ii) Ambikagiri Nagar Path with drain Ward-16 Jail road (iii) Dhenuchocha Bye Lane- 1 2 (iv) Construction of Dimbeswar Bordoloi Road, Kailashpur Sonari Gaon, Krishnasura Road (v
MMPPNA_RIDF_XXXI_25_26_481 Improvement of (1) Pachgori Road Silchar (2) Road and Improvement of Drain at Silchar High School Ramnagar-Lamargram-Tarapur Pt-IV, Ramnagar G.P. (Phase-I) (3) Improvement of Village Road/Public Path at Ramnagar Tarapur G.P
Construction of Both sides RCC Drain with Slab Cover from Paglababa Mandir Road to South Dimalgaon Village via Corona Bazar under Titaguri VCDC, Kokrajhar Development Block under SOPD (BTC) for the year 2026-27. TN 28 09
as per BOQ
AS19515 Construction of Road from Dewdhar Dakhinpat Road to Mowkhati village Road including Cross Drainage Works and Routine maintenance of the works for five years
Hume pipe culverts, Breast wall, Drainage, Soling with GSB, OP TR Pt 1050 to SW Spur to Pt 1360. Explosive Materials, Blasting cable E1 Cable
Improvement of Tantara Boro path at Ganesh Para and its bye lane From Ch 0m to 185m under SOPD G for the year 2024 25 Providing load bearing drain Earthwork in subgrade soil GSB WBM III and ICBP
MMUPPNA_RIDF_XXX_24_25_02 Upgradation of (i) Road from Rangirkhari Netaji Statue point to SMCH Point, Silchar including box culvert and RCC covered Drain, (ii) NH-37 Road from Tarapur Over bridge (E D Colony) to ISBT, Ramnagar, Silchar under Mukhya
MMPPNA_22_23_386 Construction of (i) road from Silchar Fulartal Road (Bakarsah Mukam Point) to Jain Udyog (Balance portion) Remaining portion of Kanakpur road (Ch.0.00M to Ch.2514.00M), (ii) road drain at Kalibari Chor (Ch.0.00M to Ch.212.00