Loading…
Loading…
2,805 results • Best match
Improvement of Bylane No.1,2,4,5 of Rajgarh Road and Bylane No.1,2,3,4 of Pub-Sarania Road including construction of Load Bearing Drains for flood mitigation of Pub-Sarania area under SOPD-G for the year 2024-25..
Anti-erosion measures to the dyke Amjur river training scheme including drainage of Kaptanpur and Mangalpur Haor Ph.-I (R/B of rive Sonai) (Restoration of damages at Deflipar ) Ph.-II.
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Various works under Guwahati Municipal Corporation
Improvement of various works under 2nd Installment of Untied Basic Grant under the award of 15th Finance Commission for the year 2020-21 during the Financial year 2021-22
Construction of RCC drain near Salakati Petrol Pump at Fukangaon, NTPC-BONGAIGAON.
Improvement of NH 154 from Km 0/000 (existing) to Km 2/985 (existing) (Length 2.985 Km) with GSB, WMM, DBM and BC along with Surface Drain and ICBP in stretches under SOPD for the year 2019-20.(From Ch.0.00 km to Ch.2/985 km)
PWD-NH(BR)/RAN/SOPD/2024-25/01 Construction of New Bridge over river Mangoldoi (Br.no 35/1) including approaches, service road and drain in place of the abandoned Bailey bridge on NH-15 under SOPD for the year 2024-25 under PWD Rangia NH Division in
Provn of term contract for enhancement of life of JLC/PC living Bk Bldgs No. DT/SF/266 A B/91 in 01 block by repairing of roof treatment, door and window, floor, plaster, internal electrification,with drain, foot path in ARTC and S DIPHU, Assam
REPAIR REPLACEMENT OF SEWAGE LINE CLEANING OF SEWAGE LINE FENCING OF ZONE 2 AND ZONE 3 AND ZONE 4 AND REPAIR PERIODICAL SERVICE OF COMPOUND WALL BOUNDARY WALL STEEL GATE REPAIR TO SAUCER DRAIN TOILET SHAFT JAFRI WALL AT ZONE 1 AND ZONE 4 UNDER GE
STBR/SOPD-G/Rangapara-05/65 Construction of road from i)Harcchura 13 no line to Dabar Connecting road ii)Drain at Hatidubi Tiniali to Bridge no 1/1 Under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) under SOPD-G for the year 2025-26, Ran
Reconstruction of Ananda Nagar Bye lane 3 near Dr Bibhas Purkayashtas house From Ch 0m to 200m under SOPD G for the year 2024-25. Reconstruction of Cross Culvert and RCC Drain near Pandu Bazar and Kali Mandir road Total Length 30m under SOPD G for th
Strengthening and Widening of Old N. T. Old Road (upto four lane) from NH-31 to Baralia river including construction of road side drain cum footpath etc. under SOPD(G) for the year 2019-20. (Ch. 0.00 m t Ch. 1220.00 m) under North Kamrup Territorial
STBR/SOPD-G/Hailakandi-01/3 (i) Improvement and upgradation of Road with Cover Drain and Culvert of Gangpar Dhumkar PMGSY Road to Tool Road Via Byelane-1 under MMPNA of SOPD(G) for the year 2025-26. (ii) Improvement and upgradation of Road starts fr
MMNPPNA_23_24_218 (i) Construction of Covered Drain at Alupatty, Ward No. 1 , (ii) Construction of Kalyan Nagar Main Road, Ward No. 6 8 ( From Ch 0.00 m to 400.00 m) (iii) Construction of Seuj Nagar Bye Lane No 1, Ward No. 6 ( From Ch 0.00 m to
MMNPPNA_23_24_89 (i) Construction of RCC drain outlet from RRB road to Kollong, (ii) Reconstruction and widening of Rabin Bordoloi road (Ch-0.00 m to Ch-330.00 m), (iii) Construction of Namghar Road bye-lane I (Ch-0.00 m to Ch-65.00 m),Bye lane 2 (Ch
MOEI and fans, Compound light including RMO water supply pump DG set and fire pump including operation of STP installation in the office building and the residential building of GPRA colony, Katabari, Guwahati during 2022-23. (SH: Installation of new ... point, drain motor
Special repair and renovation work in CASFOS at Burnihut, Assam (SH: Dismantling old RCC tank and installing PVC tank (4 x 1000 liter) capacity in each block at Type-I quarters, water pipeline from overhead tank to academy and repairing of drain around type-I quarters).
Construction of Staff Quarters ( Type-II 128 units, Type-III 50 units Type -IV 18 unit),Pump house,OHT, Deep tubewell with IRP,Drain ,Road other ancilliary works with all necessary Electrification works in connection with Lumding-Furkating doubling project under Dy.CE/CON/LMG,DMV and MXN.
Construction of 31 units(Type-II) and 155 units(Type-III) quarters, labour and merchant rooms, precast yard drain (at DPRA,SNCA,BOKO,BMGN,CGON stations), boundary wall, road works and other miscellaneous works from NBQ to AZA via GLPT in connection with doubling project N.F. Railway.
Custom Bid for Services - At Maligaon Sweeping Cleaning of CPDREGuwahatis Office Transit No 309ABCD at NVP area MLG its surrounding area drain appr area 200 Sqm for 1 year in connection with the RE works in LMG Div GHY Excl LMG Sec of NF Rly Gr..()
SOPD_SIG_19_20_41 Improvement of (A) Sahid Mukunda Kakati Path including Cross Drainage Works (B) Sahid Kanaklata Path under Signature Project of SOPD-G (State Priority Scheme) for the year 2019-20, Gohpur LAC
Upgradation of MRL02- Road from Kumargaon to Halowagaon via Gereki and Bhakatgaon including Cross-Drainage works and Routine Maintenance of the works for 5 years under PMGSY III, 2024-25, Batch I
Construction of (i) RCC Drain on VIP Road starting from Old AT Road (L1.425km) (ii) RCC Drain on Subachani Road left side under MMNPPNA SOPD-G for the year 2025-26
Improvement of J.C. Das Road including construction of RCC Road side drain cum footpath, RCC load bearing drain (Ch.235.00m to Ch.482.00m) under SOPD(G) for the year 2019-20.
Improvement of Sarat Singha Path with Drain (Ward No. 43) with Load Bearing Drain and Road works under Mukhya Mantrir Nagoriya Paki Path Nirman Achoni (MMNPPNA) for the year 2023-24
Improvement of Various works under Guwahati Municipal Corporation
MMPNA/2022-23/213 Construction of RCC covered Drain at Old Lakhipur Road (Balance work of drain) under Mukhya Mantrir Path Nabikaran Achani for the year 2022-23, Cachar District, Silchar LAC.
Renovation of outlet from Service Road of Maligaon old ROB (LHS) to main drain near Kamakhya Station including desilting of main drain (Length 270.00m) under SOPD(G) for the year 2020-21.
Window AC 1.5 Ton, Stabilizer, Drain Pipe, Starter Switch, Bracket for Wall Mounting
Road Side cover drain from GMC Rotary to Sankar Nagar via Gahorikata Chowk
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Various works under Guwahati Municipal Corporation
Upgradation of T04- Road from Umednagar to Monacherra Grant via Rajyasarpur Pt V including Cross-Drainage works and Routine Maintenance of the works for 5 years under PMGSY-III, 2024-25, Batch-I
Balance work for construction of Road from MRL07-Saboti Kalyanpur to Hatilung via Asain Public School including Cross Drainage Works and Routine maintenance for 5 years under PMGSY for the year 2020-21
Flood Protection Drainage in Patharkandi Ph-II (R/B, Ch. 3800m to 5266m) under RIDF-XXVIII of NABARD (Mukhya Mantri Mathauri Pakikaran Achani) for the year 2022-23 of District Karimganj (Patherkandi LAC)
Construction of road from 01 T5 to Kalinagar Pt-III including cross drainage works and routine maintenance of the work for five years under PMGSY, Ph-VII, Regular for 2007-08 (Balance Work).
Special repair of Cook House Dining Hall Toilet Block Drainage Septic tank of JCOs OR of Transit Camp Silchar and Officers Mess Bldg No SP 01 of No 2 MGAR East at Silchar
1) Con of 3X5.00X5.00m RCC Box cul at Kanakppur 2) Imp of Pachgari Rd / Birbal Bazar to Nagapunjee, 3) Con of Old Bhakatpur PHE Lane 4) Con of Moura Singh Path 5) Con of covered drain on Ukilpatty Rd under MMNPPNA for the yr 23-24, Silchar MB
STBR/SOPD-G/Udharbond-05/05 (I) Improvement of Rajpath road at Rongpur (L 0.310 km) (RCC Cover Drain on left side of road from Ch. 80.00m to Ch. 210.00m) (II) Improvement of PWD Colony Road (L 0.700 km), (Total L 1.01 km) under MMNPPNA under SOPD-G
PROVN OF 04 X TOILET, 03 X BATHROOM AT ROWRAIH , 01 X TOILET, VEH WASHING PLATFORM, VEH SHED AT BHALUKMARA , UTENSIL CLEANING AREA NEAR COOK HOUSE OF BLDG NO T-27 AND DRAIN NEAR BLDG NO P-4 (OR LINE) AT SARAIBARI IN JORHAT MIL STN UNDER GE JORHAT
PROVN OF 01 X GUARD ROOM WITH TOILET AND WATER FACILITIES INCL ELECTRIC CONNECTION FOR 04 MEN BETWEEN POST NO 08 AND 09 FOOT PATH WITH INTER LOCKING TILES DRAIN AT CERTAIN LOCATIONS AND CONSTR OF SEWAGE LINES BETWEEN JCO MESS 7 B COY AND SPL REPAIR O
Set of spares for ELGI Make CRC 150 Compressor consisting of (1) |RING PKG 17.5X22X2 LG01080 to part no: 000521950 Qty- 100 nos, (2) PLUG DRAIN 3/8"BSP CRC150 to part no: 000481220 qty- 100 nos , (3) DS CUM BREA.NYL.LG01;BРО to part no: 000427030 Qty- 100 nos.
Construction of RCC road side drain of Dilip Huzuri Path at Sarumotoria at Hengerabari including RCC outlet drain to Bahini river through Kekura Nagar Road under SOPD(G) for the year 2023-24
At Banarhat station: Construction of ORH cum camp office with boundary wall, construction of RBG building, circulating area with station approach road, passenger waiting area along with passenger amenities, 1 No SSP, 2 No location huts, 1 No block ... Hathi Nala , ...