Loading…
Loading…
2,805 results • Best match
MMPPNA_23_24_291 (i) Construction of Road and Both Side Covered Drain at Saratpally Starting from Renu Singh petrol Pump to Pratap Das house via Saratpally Bazar with one box culvert near Tri-junction of Saratpally Bazar Ch. 0.00m to Ch. 1000.00m)
Improvement of B N Hazarika Road by widening both sides and renovation of existing damaged drain from the junction of Temple Road up to junction of Khijnoor Ali Road at Ward No V Sivasagar Municipal Board under 15th FC Untied Fund
Sterile Hypodermic Syringe (V3) (Q2), Endotracheal Tubes (V2) (Q2), Infant Feeding Tube (V2) (Q2), Insulin Syringe (Q2), nebulizer mask and accessories (Q2), Intravenous Cannulas as per IS 10555 - 5 (Q2), Urine Collection Bag (V2) (Q2), ... Chest Drainage Bag ... Cavity Drainage Units ...
Balance work of Majgaon Ferryghat to Tiling Gaon Road including repairing of Road side Brick Masonry Drain and Renovation of Aswaklanta PWD IB in view of G 20 Summit under SOPD-G for the year 2023-24.
Improvement of Khepinijal to NH -27 Link Road 1 ,Khepinijal From Ch 0.00m to 320.00m under SOPD(G) for the year 2024-25.(Providing load bearing drain, E/W in subgrade soil, GSB, WBM-III and ICBP)
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Various works under 2nd Instalment of 15th FC for the FY 2020-21 during the FY 2021-22
Improvement of Various works under 2nd Instalment of 15th FC for the FY 2020-21 during the FY 2021-22
Improvement of Road from Khepinijal to NH- 27 Link road -2 From Ch 0.00m to 200.00m under SOPD(G) for the year 2024-25.(Providing load bearing drain, E/W in subgrade soil, GSB, WBM-III and ICBP)
RFP for Earthwork in formation and in cutting, blanketing, construction of RCC box, RCC and PCC drains, retaining walls, toe walls, nine (9) numbers minor bridges, one (1) number Road Over Bridge (ROB), Railway Electrification works including design, supply, erection, testing and commissioning of OHE, Electrical (General) works, and Signalling and Telecom works from Kokrajhar station (excluding) to CH- 4.100 and from Salakati station (excluding) to CH-0.400, in connection with the construction of the New Railway Line between Kokrajhar and Gelephu on Hybrid- EPC mode.
CONSTRUCTION OF RCC DRAIN AT JOYKHAMDANG PATH RIGHT SIDE, NAZIRA
STBR/SOPD-G/Udharbond-01/01 (I) Construction of road from Urangtilla PWD Road to Urangtilla LP School, (L 0.823 km), (II) Construction of RCC Drain (from Ch. 750.00m to Ch 1010.00m) at Rongpur Angarjur Road, , (III) Improvement of road from PWD bri
Repair and maintenance to NH-53 (Silchar Jiribam section) under SOPD for the year 2019-20 (Repairing of damaged pavement by providing WMM, BM and BC including earth work in shoulder, road side drain,interlocking paver block at side berm in stretches
Surface renewal of the existing bituminous pavement with 30mm and 40mm thick Bituminous Concrete overlay at stretches from Km.345 to Km.357 (L 13.0Km.) (Kanchanjuri to Bagori) of NH-37 (New NH-715) including construction of RCC Drain cum footpath at
Strengthening of existing Road including slope and uphill protection and Road side covered drain at built up area along with junction improvement from Ch. 0.00 to 23.700 km (L 23.700) of NH-153 (Job No 153 AS/2020-21/214). Estimate under contingency
MMPPNA_23_24_81, Improvement of road from LRA road to Lakhipur Garden (Ch. 0.00m to Ch. 830.00m), 2.Improvement of road from Kaptanpur X to Pabda Naidol Manipuri Basti (Ch. 0.00m to Ch. 2100.00m), 3.Construction of RCC Cover Drain cum Foot Path at B
Improvement of road from NH-37 to Kanchanjuri for the year 2022-23 under Kaliabor SamaguriTerritorial Road Division including RCC drain along with Footpath and Parking Bay of District - Nagaon,Kaliabor LAC. Pkg No. SOPD-G/22-23/EE/KSTRD /Kaliabar/01
Construction of RCC Covered Drain cum footpath from Ch.0.00 m to Ch.500.00 m including re-construction of RCC Box Culvert No.1/1 and 1/2 on Bidya Baruah Road and construction of New RCC Box Culvert on MG road
Const. of Chain Link fabric fencing with GI wire and plantation over open public drain at Kokrajhar Town under the 1st Installment of Devolution fund to ULBs (BTR) for the year 2022-23 under the Award of 6th ASFC during 2023-24.
STBR/SOPD-G/Udharbond-02/02 (I) Improvement of Dayapur Arkatipur Road (Ch. 5370.00m to Ch. 5750.00m), (L 0.380 km) (RCC Drain and Road), (II) Improvement of road from Kalituk Shimultola to Shefali Bagum house, (L 0.530 km), (III) Construction of road
REPAIR CLEANING FOR RUNWAY MONSOON DRAIN, RUNWAY SIGN BOARD, GRASS CUTTING/SCRAPING BOTH SIDE OF RUNWAY EDGES (2.00 M) FROM RUNWAY EDGE AND REPAIR REPLACEMENT OF EXISTING UNDER GROUND CABLE FOR LIGHTING OF SIGN BOARD AT RUNWAY AT AF STN UNDER GE (A
MMNPPNA_23_24_41 (i) Construction of ICBP road at Ravapara Chhokramara Road at Fakiragram Ward No.4 (ii) Construction of ICBP road from F.S road to M.G road at Fakiragram Ward No.6 (iii) Construction of RCC Drain at Pakrital Ravapara road at Fakiragr
Const. of Assam Judicial Academy at Amingaon, Guwahati (Const. of Administrative Bldg. (G Plus 4), Judicial Officer s Hostel for Male (G Plus 5), Judicial Officer s Hostel for Female (G Plus 5),Gr-IV Residence(G Plus 5), Internal Road and Drain)
Provn of term contract for enhancement of life of 01 Nos Old Catering living Bk Bldg No. DT/SF/134/88 in 01 blocks by repairing of roof, truss, false ceiling, joineries, floor, plaster, with drain At ARTC and S , Diphu Assam
Construction of RCC covered slab stone Masonry/RCC drain at Baihata Chariali portion from Ch 0/590 to 1.297(L 1.0101 km) on both sides of NH-15 under SOPD 2022-23 under Rangia NH Division, Rangia in the state of Assam
Strengthening of Existing Road including slope and uphill protection and Road Side covered drain at built up area alongwith Junction improvement from Ch 0.00 to 23.700 km ( L-23.700 km ) of NH-153 on EPC. Job No.153/AS/2020-21/214
UP-GRADATION AND STRENGTHENING OF GOLAGHAT TOWN INTERNAL ROADS OF WATER LOGGING AREAS ALONG WITH CONSTRUCTION AND RENOVATION OF EXHISTING DRAIN IN WARD NO. 1,5,8,10,12 AND 13-WARD NO 1,5,6(PART-I) AT GOLAGHAT UNDER CIDF SOPD-ODS FOR THE YEAR 2021-22
Provn of term contract for enhancement of life of Old QG Bldg No. DT/SF/60, 61, 62, 63/85 by repairing of roof treatment, door and window, floor, plaster, internal electrification, plinth protection with drain, foot path,etc at ARTC, DIPHU, Assam
SOPD_G_20_21_224_Pipe line shifting and construction of new 3 Ph 4W LT, 11 KV and installation of 11/0.4 KV 4X250,11X100, 3C63 SUB Station for construction of road side RCC drain for the work Dhopatari Mallong road incl connecting road to the industr
REPAIR/MAINTENANCE OF INTERNAL ELECTRIFICATION AND OTHER ALLIED WORKS AT ZONE 5 (155BH, 4 CDU, 56 FMSD, 188 FHO) AT SAA AND REPAIR/ REPLACEMENT OF SEWAGE LINE, DRAIN, FENCING OF ZONE 1(B), ZONE-1 (C) ZONE-5 UNDER GE (S) TEZPUR
Construction of road side drain with covered slab on NH 53 Silchar Jiribam section under SOPD for the year 2019-20 ( Km 8.54 to Km 9.00 , km 26.00 to km 27.80 in stretches) under PWD N.H.Division ,Silchar in the state of Assam
RIDF-XXVII/Kamrup/01 Construction of (1) Road from P.L. Rajapara road to Narayanpur via Jarapata village ,(2)Road from Kalghar to Bakara para via Pokapam village and (3)RCC side drain with cover slab on Bijoy nagar Dakhala and connecting Uparhali Hig
Strengthening of existing road, construction of paved shoulder and masonry drain from km. 618.600 to km 633.600 of NH-37 under AP 2016-17 under NH Division, Dibrugarh in the State of Assam.(Job no. 37/AS/2016-17/159) (Balance work)
Construction of RCC load bearing drain with slab cover for used water at north side of DMB Bus stand at ward no 8 phase-I under 1st Inst of 15th FC tied grant for the year 2024-25 during year 2025-26
MMNPPNA_23_24_129 (i) Construction of NH-37 to FRU Road as Gaurab Path from Ch.0.00KM to 0.50KM, (ii) Reconstruction of Teok FRU campus internal road From ch 0.00KM to Ch. 0.14KM, (iii) Construction of Cover Slab of Teok Bongaligaon Drain, (iv) Const
Providing renewal course over the existing surfaceof NH 37 from Ch. 603.160 km to 618.600 km (L 15.44 Km) and From Ch.633.600 Km to 636.800 Km ( L 3.20Km) including providing road side covered PCC drain at Lahowal Town alongwith road safety works
MMPPNA_23_24_72, Construction of road from Thengal Gaon to NH-52B (Ch. 0.00m to Ch. 800.00m), 2.Construction of Dhamal Gaon Majpath from (Ch. 0.00m to Ch. 1100.00m) , 3.Construction of road from Tepor Gaon Khanikar Chariali to E D Drain (Ch. 0.00m
MMNPPNA_23_24_76 (i)Construction of Bhebarghat Smashan Approach Road, Ward No.10 ( ch. 0.00 m to Ch. 205.00m ), (ii) Construction of Denial Path at Ward No.2 including one side drain ( ch. 0.00 m to Ch. 306.00m ), (iii) Construction of Bye lane from
Kar/AD19-20/08 Improvement of Approach Road to Langvoku Tourist Place within Manja Area (Imp. With ICBP, covered RCC drain, solid foot-path, retaining wall, steel railing including car parking etc. L-2.00 km under Assam Darshan for the year 2019-20.
Improv of site around the building of the District Judicial Courts and Officers Building (G 1 Assam Type) including RCC staging, Drain, Septic tank and conversion of toilet block in to Office Room record room etc. atImprov of site around the building
MMNPPNA_23_24_129 (i) Construction of NH-37 to FRU Road as Gaurab Path from Ch.0.00KM to 0.50KM, (ii) Reconstruction of Teok FRU campus internal road From ch 0.00KM to Ch. 0.14KM, (iii) Construction of Cover Slab of Teok Bongaligaon Drain, (iv) Const
Re-construction of Rabindra Bhawan Approach Road including open boulder masonary side drain works (from Ch. 0.00 to 0.295 Km and Ch. 0.00 Km to 0.66 Km ) under SOPD-G for the year 2020-21, Bongaigaon Municipal Board. Package No.SOPD(G)_WAC_130
Custom Bid for Services - At Maligaon Sweeping Cleaning of CPDREGHY Office at NFR HQ Transit No 308ABCD at NVP area Maligaon and newly constructed outside toilet drain and garage beside Transit No308ABCD App 250 Sqm for 365 days under RE work Grou..
AS11648. Construction of Road from Dakhin Bhalukabari to Karaibill Morakolohi Road including Cross Drainage works and Routine Maintenance for 5 Years under PMGSY,Package No.AS11648 (Balance work) (2017.18,Batch2)
Repair and renovation of Approach path Concrete Road First and Second floor of office building and Canteen and providing drainage cover near office premises of CWC complex, Adabari, Guwahati
Ex Post Facto approval for Construction of RCC Drain cum Footpath and Guard Wall at chowkigate to kalipahar via stone crusher Road including shifting of 33 KV Kamalpur/ 11 KV Changsari/LT feeder under SOPDG for the year 2023.24, Jalukbari LAC
Improvement of various works under the award of State Finance Commission
Improvement of Various works under City Infrastructure
Improvement of Various works under City Infrastructure
Precast culvert for km 8 to 11.5, Precast culvert for km 11.5 to 15.00, Precast trapezoindal shape line drain for km 8 to 10.5, Precast trapezoindal shape line drain for km 10.5 to 12.5, Precast trapezoindal shape line drain for km 12.5 to 15.00