Loading…
Loading…
2,805 results • Best match
Improvement of Prasanti Path and Sudarshan Path at Jonaki Nagar, Lokhra (From Ch 0.00m to 135.00m and Ch 0.00m to 130.00m) under SOPD(G) for the year 2024-25. (Providing load bearing drain, E/W in subgrade soil, GSB, WBM-III and ICBP)
Construction of Lachit Bagh Hazarika Path to Sivcharan Boro Path, Sawkuchi, Lokhra (From Ch0.00m to Ch 190.00m)under SOPD(G) for the year 2025-26 (Providing Load Bearing Drain, Cleaning, E/w in Core and subgrade Soil, GSB, WBM-III and ICBP etc)
Repairing of toilet and Bathroom of quarter NTC-1(Nazrul Islam), NT-08 (Utpal Das) to control seepage from upper bathroom an toilets, Repairing Drain apron and misc.of Qtr. NT-01 (Sabina Yasmin) ,NT B-8 (Robin Khaba) , NT-09 (Poulami Devnath), NT-10
Widening of Dharmeswar Bordoloi Path from the junction of East Jamuna Road up to 231.00 M by Construction of Right side RCC drain and construction of culvert at the junction of East jamuna Road at Ward No-XIII of Sivasagar Municipal Board under 15th
AS PER NIT
As per BOQ details
Construction of RCC covers drain cum footpath at Gaurangtari, NTPC-BONGAIGAON.
Split AC 1.5 TON, Stabilizer 4KVA, Clamp, Starter Switch, Drain Pipe
PAVER BLOCK ROADS ON GSB AND WBM RCC DRAIN AND CULVERT
Upgradation of roads MRL09-Longkok to Nobdi Daulagupu including Cross Drainage Works and Routine Maintenance of the works for 5 years under PMGSY-III, batch 1, 2022-23. (Balance Work)
MMNPPNA_23_24_07 (i) Construction of R.C.C strom water box type drain with culvert at west North side of P.W.D road leading from Swapan Kr Roy house towards Star Club at ward No-1. (Ch-0.00 m to Ch-380.00 m) (ii) Construction of road from
SOPD_G_24_25_14 Construction of RCC Drain from (Ch. 260.00m to Ch.460.00m, Ch.470.00m to Ch.770.00m RHS) and (Ch. 458.00m to Ch. 1658.00m LHS) and Construction of one no of Box culvert size (2x 5.00m X 5.00m) at Ch.250.00m and its Approach at Silchar
Improvement of Ramkrishna Nagar Path at Bengalibasti and Nilgiri Path at Pipeline Lokhra From Ch 0m to 105m and Ch 0m to 150m under SOPD G for the year 2024 25 Providing load bearing drain Earthwork in subgrade soil GSB WBM III and ICBP
SOPD_G_24_25_13 Construction of RCC Drain from (Ch. 0.00m to Ch. 130.00mm and Ch. 148.00m to 212.00m, LHS) and (Ch. 28.30m to Ch. 50.30m RHS) at Naga Punjee Road for ensuing Durga Puja, 2024 in Silchar Town under SOPD-G for the year 2024-25
Strengthening of Existing NH-129 (New)/NH-39 (Old) from Phulbari- 96/00 (Near Bokajan) to Gautam Basti-Km 103/00 (Near Lahorijan) along with RCC Drain near Khatkhati under Annual Plan 2022-23 in the state of Assam. Job.No.129/AS/2022-23/239.
MMPPNA_22_23_390 Construction of road from (i) Chowrongee point of FCI to Berakhal road to PHE in lake point road via Jagannath Harimandir lane at Ch.0.00M to Ch.470.00M), (ii) RCC Drain Cross Culvert near Rangthi Basti Sub-Centre to E D (Ch. 0.00m
MMNPPNA_23_24_164 (i) Construction of Road N Drain from NH 36 to Multi Utility Market Complex at Bakalia Ward No 3, Length 0.081 Km, (ii) Construction of Road from NH 36 to New Fish Market at Bakalia Ward No 3, Length0.162 Km,(iii) Construction o
MMNPPNA_23_24_53 (i) Construction of FCI Road from Pachali Masjid Road to FCI Campus Gate No.2 (From Ch. 0.00 m to Ch. 500.00 m) with Both Side RCC Covered Drain (ii) Widening of Sati Joymoti Road from Hojai Circle Office to Gopal Nagar Culvert with
MMNPPNA_23_24_48 (i) Construction of road from CH.R.N Road to Goreswar 30 Bedded Hospital via Goreswar College Road (Ch 0.00 M to 500.00 M) at Ward No-3 as Gaurab Path (ii) Construction of RCC Slab Culvert and CC Drain at starting point of Rangia
(1) Development of approach road from 2nd College gate to in front of New Building at Regional Dental College, Ghy-32 (2) Construction of retaining wall along the drain from the exit gate to back side of Grade-IV quarters at Regional Dental College
C/o RCC retaining wall along the approach road towards 360 Men Barrack at 33rd n. ITBP, Karchia, Sonapur, Guwahati (Assam) Camus. (SH: C/o Approach road and drain from Gate No.1 to 360 Men Barrack at 33rd Bn. ITBP, Karchia Sonapur Campus
Package no. DSLT-31
Package no. DSLT-20
Package no. DSLT-12
Package no. DSLT-22
Package no. DSLT-2
Package no. DSLT-13
Package no. DSLT-18
Package no. DSLT-27
Package no. DSLT-34
Package no. DSLT-30
Package no. DSLT-11
Package no. DSLT-35
Package no. DSLT-4
Package no. DSLT-23
Package no. DSLT-25
Package no. DSLT-29
Package no. DSLT-5
Package no. DSLT-21
Package no. DSLT-3
Package no. DSLT-28
Package no. DSLT-19
Package no. DSLT-16
Package no. DSLT-10
Package no. DSLT-8
Package no. DSLT-17
Package no. DSLT-6
Package no. DSLT-15
Package no. DSLT-32
Package no. DSLT-26