Loading…
Loading…
2,805 results • Best match
Construction of Rural Roads from (i) Baskandi MV School to Scotpur, (ii) NH-53 to Palorbond Alipur Road and (iii) Harinagar NEC Road (Near Pailapool) to Lallong Grant including cross drainage works and Routine maintenance of the works for five years
Construction of embankment cum road on Amjur river training scheme including drainage at Kaptanpur and Mangalpur Haor PH-II (L/B of river Amjur) L-7.09Km under RIDF-XXVIII of NABARD (Mukhya Mantri Mothauri Pokikaran Achani) for the year 2022-23
Construction of embankment cum road on Amjur river training scheme including drainage at Kaptanpur and Mangalpur Haor PH-I (L/B of river Amjur) L-1.61km under RIDF-XXVIII of NABARD (Mukhya Mantri Mothauri Pokikaran Achani) for the year 2022-23
1) Con of Rash Bihari Bosh Lane 2) Recon of Kamala Rd 3) Imp of Kanakpur Rd 4) Con of Smriti Lane at NH Rd 5) Con of BC on US Dutta Rd Bilpar (6) Con of RCC drain at Silchar Fulertal Rd 7) Imp of NN Dutta Rd under MMNPPNA for the yr 23-24 Sil MB
Impt of 1) Durga mandir Rd,Drain, Ananda nagar, 2) Boripara Rd (Reconst of RCC Cross Culvert, Cattle Bridge),3) GRPF Colony Rd, 4) Const of Byelanes With Drain at Boripara under Mukhya Mantrir Nagoriya Paki Path Nirman Achani for 2023-24.
Re-const of 1) AT Rd Drain,Footpath below Athgaon Flyover 2) MS Rd LHS BL 1 and main Rd 3) SRCB Rd with WBM, ICBP including RCC Drain under Mukhya Mantrir Nagoriya Paki Path Nirman Aachoni (MMNPPNA) for the year 2023.24.
Re-construction of I) PWD (Roads) Chief Engineer Office Complex Road with L/B Drain, II) Kannachal Byelane No-1 Rd construct of L/B Drain, III) Red Cross Hospital Road under Mukhya Mantrir Paki Path Nirman Achani for the year 2023-24
SHIFTER LEVER, SPIDER NEARING, SYNCHRONIZER RING, 3RD GEAR, 4TH GEAR, DRAIN VALVE, GEAR SELECTOR END, FUEL PRESSURE PIPE
One time Cleaning of Storm Drain inside Plant with help of backhoe Excavator tractor Trolley for 2 months
voltas window ac 1.5 ton 03 Star, Stablizer 04 KVA, Pen stand, 16 AMP TOP PLUG, DRAIN PIPE
Godown Floor Upgradation work along with reconstruction of damaged boundary wall along with RCC drain at CW, Sorbhog
Improvement of Gopal Krishna Path at Hengerabari including drain works under SOPD (G) for the year 2020-21
Improvement of Institute Colony road near market including construction of RCC guard wall, brick drain with cover slab.
Drip - Leg Drain (Q4) MSE Exemption for Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5914700 Dated : 05-02-2025 Bid Document 1/4 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Construction of Storm water cover drain from Maligaon to river Brahmaputra under SOPD-G for the year 2024-25
Improvement of Sarathi Path by providing WBM and ICBP drain under SOPD(G)for the year 2024-25. (RETENDER)
Construction of Road side RCC Drain under 15th Finance Commission (ULB) Silapathar Municipalty Board for the year 2020-21
Construction of Road and Drain at Rupknowar Housing Complex under SOPD-G for the year 2025-26 Ward 02
Balance work for construction of Road from 1. Bahir Jonai to Berachapori via Bolaipam, 2. Bahir Jonai to Abhoyapur Kachari including Cross drainage works and Routine Maintenance of the work for 5(five) years under PMGSY for 2005-06 (ADB). Package No.
Construction of road from Mayerchar Pt. I to Nayeralga Pt. II (Ch. 6500 m to Ch. 7250 m) (Bal. Length) and Re-construction of flood damaged road portion including cross-drainage works under SOPD 2021-22 beyond Govt. of India sanction under PMGSY.
Flood Protection and Drainage in Bakrihawar area in Hailakandi Civil Sub-Division on L/B of River Barak from Ch. 100.00 m to 2800.00m for the year 2022-23 (Length- 2.70KM) under RIDF-XXVIII of NABARD (MukhyaMantri MothauriPokikaran Achani)for 22-23
Construction and maintenance of Rural Roads from 1,NH-53 to Chisel Punjee, 2,Scotpur to Bandu via Rail Basti T.E.via Narayan Basti to South Laduman 3, NH-53 at Tarapur to Bandu T.E.via Narayanpur including Cross Drainage Works Under PMGSY Regular
AS-22-679 Construction of Road from MRL06 Amloga Molangaon to Dolongbasti via Cotton Mill including Cross Drainage works and Routine Maintenance for 5 years in Sonitpur District under PMGSY-III, 2020-21, Batch-1. Package No. AS-22-679. (Balance Work)
As per BOQ
Tube feeding smooth plastic infant 38 cm long 8 F with red flexible connector for nasogastric feeding, UdashDrain Male incontinence Device made of soft Light weight Latex sheath size large 35 mmdot, UdashDrain Male incontinence Device made of soft ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Size drainage with ... Size drainage with ... Size drainage with ... Size drainage with ...
Imp of i) Jyoti Rekha path at Satgaon, Ward No. 58 with RCC L/B Drain, Road works (ii) Umananda path and byelane, Ward No. 58 at Satgaon with RCC Load Bearing Drain, Road work under Mukhya Mantrir Nagoriya Paki Path Nirman Achoni for 2023-24.
Re-const of Drain Cum Footh path, Cross Culvert etc on Hatigaon Main Rd, Basisthapur Byelane 1 via LNB,Bishnujyoti path,Sijubari charali towards Basistha river under SOPD(G) for Fld Mit of Hatigaon Area for 2024-25. Rd-1000 m, Drain -1050 m, Gr-II
Impt of 1) Hill view Path(Ganesh Nagar) and Const of RCC L/B Drain at Basistha 2) Milan Path(Ganesh Nagar) with const of RCC L/B Drain at Basistha 3) Har Govinda Path at Dakhin Ganesh Nagar under MMNPPNA for the year 2023-24.
Constn. of RCC drain at Sunsali picnic spot App Rd, Imp of Swaraj Nagar b.l No. 3 at Sarumotoria with RCC drain works etc. and Imp of Juripar Path with RCC culvert over Lakhimijan connecting Lakhimi Nagar Path under SOPD(G) for the year 2022-23
Windows AC 2 Ton, Drain Pipe, 3 Pin Top 15 AMP, Starter Switch for AC, Remote Bracket for Wall Mounting
Improvement of MG Road providing brick outlet drain with boulder pitching etc. under SOPD (G) for the year 2019-20
GEAR BOX BEARING, GEAR BOX OIL SEAL, PTO SHAFT ASSY, GEAR BOX MTG BOLT, DRAIN PLUG, GEAR TOP COVER BOLT
Improvement of Bhaskar Jyoti Path at Dwaraka Nagar including Drain Works for Mitigation of Flood for the year 2023-24.
Reconstruction of damaged portion of drain of GNB road, under State Priority under SOPD -G for the year 2022-23
Improvement and widening of Road and Drain Bangra to Rani (Length 1.40Km) under SOPD(G) for the year 2019-20.
Supply of Backhoe Loader 4WD (Folding Bucket) along with Narrow Drain Bucket inclusive of all Taxes Insurance Transportation and AMC
Improvement of Rupkonwar Path at Natun Sachal, including load bearing drain works under SOPD (G) for the year 2020-21
AR and MO Residential and Non residential building of CPWD campus at Bamunimaidan and Japorigog colony Guwahati during the year 2023-24 SH Supply of labour and materials for day to day maintenance work cleaning of overhead tank under ground sump ... surface drain cleaning ...
REPAIR/MAINT OF DAMAGES PORTION OF WALL FLOOR BATHROOM TOILETS DRAINAGE AND SEPTIC TANKS OF RESIDENTIAL BUILDING AND CREATION OF BANDH IN R/O NO 2 WKSP AR EAST AT SILCHAR DAMAGED DUE TO MASSIVE FLOODING DURING INTERVENING NIGHT OF 17/18 MAY 2022
Construction of road from Kharubhaj to E and D Bundh via Pub Kathuri cross drainage works , Kabaitari Tinali to PWD FT Road from Ch 0.00km to 0.80 Km (Length 0.80 Km) , Gumaijhar L P School Haldibari Road from Ch 0.00km to 0.70 Km (Length 0.70
Construction of road from Dholai Molai Pt-IX (Block Boundary) to 05T2 including cross drainage works and Routine maintenance of the works for five years under PMGSY (Regular Ph-VI), for the year 2006-2007, Ch.0.00M to Ch.7150.00M and Ch.22500.00M to
Improvement of Various works under 2nd Instalment of 15th FC for the FY 2020-21 during the FY 2021-22
Improvement of Various works under Guwahati Municipal Corporation
DPRD/BTC/(SOPD)Bak-15/2025-26/18
Improvement of Various works under Guwahati Municipal Corporation RETENDER
Abdominal drain kit size 32, Abdominal drain kit, size 24 ., size 28 ., Absorbable gelatin sponge IP, Anti Microbial Incise Drapes 35 cm x 35 cm, Anti Microbial Incise Drapes 60 cm x 45 cm, Auto disable syringe 1 ml, Blood Administration Set, Central ... wound drainage device ... wound drainage device ... wound drainage device ...
Re-construction of Kali Mandir Path via Gayatri Chetana Kendra at Beharbari along with Approach Road to Kalimandir (Construction of RCC L Type drain from Ch.354.00 m to Ch.742.00 m on LHS and RCC Load bearing drain from Ch.354.00 m to Ch.642.00 m on
Oil Filter, Fuel Filter, Union, Heater Switch, Setcrew, Spring Washer, Push Pul Cable, connection Fuel Inlet, connection fuel drain, Filter Elament
Improvement of Mother Teresa Road by repairing of pot holes, depression and drain under SOPD(G) for the year 2021-22.
Reconstruction of damaged portion of drain of M.D. Shah Road under State Priority under SOPD -G for the year 2022-23