Loading…
Loading…
2,805 results • Best match
Construction of RCC Culvert AT Rajgarh Road and Outlet Drain for flood mitigation under SOPD-G for the year 2024-25
PIVOT MASTER, SIZE: 4IN for TK- 464, 466, A452, PIVOT MASTER, SIZE: 3IN for TK- 568, 573, Installation of Roof Drain
Reconstruction of damaged portion of drain of B.K. Kakati road under State Priority under SOPD -G for the year 2022-23
Construction of open Garage with steel structure, septic tank, internal road and Cement Concrete drain at Hojai Municipal Board Office Campus
Prep of Br site at T Pt Balija Provn of Abutment on H oblique Bk and F oblique Bk, Op Tr 100.00 into 4.00 mtr with Interlocking tiles and kerb stones, Drainage, RCC Retaining wall, A Wire mesh boxes, B Wire mesh boxes, Hume pipe culverts
Please refer NIT
Improvement of Various works under Guwahati Municipal Corporation UNDER SoPD Retender.
Re-const of 1) PNGB Rd at Santipur Hillside nearest Rubul Chandra Deka (RCC L/B Drain Ch. 360 m- Ch. 720m, 2)PNGB Rd at Santipur nearest Ex Principal Bhupen Singh (L/B Drain (Ch. 720 m-Ch. 1080 m under Mukhya Mantrir Nagoriya Paki Path for 2023-24.
CAPD fluid 1.5 percent 2 litter, CAPD fluid 2.5 percent 2 litter, Mini Cap, Drain Bag, Ademethionine, Leuprolide Acetate Depot 22.5 mg
Gasket, Plug Drain, Oil Filter Assy, Support Frt Strut, Brg Frt Strut, Mount Frt Stablizer Bar, Sliding Pin Set, Cabin Air Filter
Improvement of 6(six) nos. bye lane of Boripara station road including side drain under SOPD(G) for the year 2019-20.
Construction of RCC covered drain at Milijuli Path at Satgaon for mitigation of Flood under SOPD(G )for the year 2023-24.
Improvement of Approach Road to Excel Public School Road with both side covered drain under SOPD(G) for the year 2023-24
Const. of drain cum footpath providing ICBP -Shoulder portion- at Dotma on Fakiragram Sherfanguri road under BTC, for the year 2017-18.
CONTROL UNIT FOR GLOW PLUG, THERMOSTATIC VALVE FOR FUEL, PRESSURE PIPE FUEL LINE, BUSH SLIDE BEARING, VALVE DRAIN BOQ Title ORD BOQ
(1) Construction of new boundary wall and main drain of NERIWALM campus, (2) Strengthening old roads, passages etc of NERIW ALM campus
Improvement of Pramod Basumatary Path at Dalbari including stone masonry drain with cover slab under SOPD(G) for the year 2023-24.
Reconstruction of damaged road and drain of Lachit Nagar main Road under State Priority under SOPD -G for the year 2022-23
Improvement of Hari Mandir Path providing WBM and ICBP and RCC Load Bearing Drain under SOPD-G for the year 2025-26.
Protection works of minor bridges Br.no.234,235,245A,245B,245C,246 etc involving rebuilding of damaged flooring, sump, up-stream and downstream channels etc in between NHLG-NHGJ and repairing works of Tunnel No-09 to 15 such as cement grouting, epoxy ... side drain and ...
MARYLAND FORCEP, LAP SCISSOR, LAP PLAIN GRASPER, LAP HOOK, 10 MM TROCHER with cannula tip, 5 MM Trocar with canula tip, VERESS NEEDLE, LAP TOOTHED FORCEP, NEEDLE HOLDER, LAP PLAIN BOWEL FORCEP, ABDOMINAL DRAIN 26, ABDOMINAL DRAIN 28, GB EXTRACTION FORCEP, LAP MONOPOLAR CABLE, S RETRACTOR SMALL, LAPAROSCOPE 10 MM 30 DEGREE WOLF
SWITCH TOGGLE, TECTYL ADHESIVE, DRAIN PLUG WASHER, OIL FILTER, RELAY THERMAL OVERLOAD, CAP PROTECTIVE, BUZZER, 1 SET OF THRUST WASHERS, GASKET RUBBER, HOSE
CONSTRUCTION OF REMAINING PORTION OF INTERNAL ROAD WITH BOTH SIDE DRAIN AND GATE, SOLAR LIGHT, PAVEMENT MAKER ETC FOR THE YEAR 2023-24
Improvement of Rodali Path, Jonaki Nagar including bye lane 5 and outlet drain, Kahilipara, Guwahati under SOPD (G) for the year 2019-20
REPAIRS AND MAINTENANCE OF FENCING,CULVERT,COMPOUND WALL,FOOT PATH AND DRAIN AT LICHUBARI AND MARIANI IN JORHAT MILITARY STATION UNDER GE JORHAT.
Improvement of Azara No. 2 Adhyapak Para Road (including construction of RCC cover side drain) under SOPD(G) for the year 2022-23
Brake chamber, Rear brake chamber, Gear lever kit, Drain valve, Relay 24V, Ignition switch, Wiper blade, Hose pipe, Gear selector kit, shift body
Fr x 12cm, Spinal Needle 15cm comma 22FG comma Type Chiba comma for Lumabar Sympathetic Block for CRPS of lower limbs dot, Cartridge No 802 comma Black color for HP Deskjet 1510 ink cartridge, Cartridge No 802 comma Tri color for HP Deskjet 1510 ink ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Thoracic drainage Catherer ... Size drainage with ... Size drainage with ... Size drainage with ... Size drainage with ... Size drainage with ...
Improvement of Various works under Guwahati Municipal Corporation
Renovation of PWD Inspection Bungalow Along with Construction of Boundary Wall, Toilet, Septic Tank, Water Tank Slab, Drain etc. for the year 2021-2022
Improvement of Uday Path at Odalbakra Lalganesh Road with RCC Load bearing drain and Road works under SOPD(G) for the year 2024-25.
Construction of Boundary wall, Earth filling, RCC Drain and Entrance gate at Gwjwnpuri (Chapaguri Pt-I), Jagyalaya Mandir, P.O.- Chapaguri, PS- Dhaligaon, Dist.- Chirang
Improvement of Ahomgaon to Kotokipara Road (Sai Vikash School Road) with both side load bearing drain under SOPD(G) for the year 2023-24
Improvement of Missionpara byelane-4 (footsteps road) including construction of brick masonry drain with RCC cover slab and guard wall (in different stretches). (RETENDER).
Improvement of Baloram Basumatary Road, Balijan Ghai path including out let drain road under State Priority under SOPD -G for the year 2022-23
Improvement of Various works under Guwahati Municipal Corporation
Improvement of Road from Amulapatty to Mohanaghat
Improvement of Sijubari Main Road and its Bye lane connecting Bishnujyoti Path including Drain works for Mitigation of Flood for the year 2023-24. (RETENDER).
Earth Wire, Rubber Mar, Gaiter, Rubber Bush, Pin Assy, Sun Wiser, Parking Barack Switch, Radiator Drain Hose, Relay Junction Box, Seal Valve Steam, Thermostate, Fan
Construction of Road from Tetelia Tiniali to Jengeragaon Shyam Nagar PWD Road with Side Drain under SOPD-G for the year 2019-20, Morigaon LAC
Improvement surrounding Bezpara area at Kamakhya Hill Top by providing RCC cover drain, RCC Wall, Stone Masonry Breast Wall, Brick Masonry Wall, CC Pavement etc.
air filter, mud flaps normal, oil filter, plug oil drain, brake pad, weather strip front door, alternator belt, suspantion bush kit, fan belt, glass sealant
Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Ways of disposal, Unloading, cleaning of drain and bush cutting, animal carcass and anti malerial; Dry Waste
Improvement of Various works under Guwahati Municipal Corporation
CANNULA IV SIZE 26 G, IV Fluid Isolyte P, EUS FNA Needle 22 G with cobalt chromium needle assembly and slimline, EUS FNA Needle 19 G with cobalt chromium needle assembly and slimline, BILIARY DOUBLE PIGTAI STENT 10FR X 3CM, Abscess Drainage sets ... pigtail drainage Catheter ... Abscess Drainage sets ... pigtail drainage Catheter ... Abscess Drainage sets ... pigtail drainage Catheter ...
Improvement of Silpota Japorigog Road to Amartal Chowk at Japorigog under SOPD (G) for the year 2022-23 (with Load Bearing drain on both sides) (RETENDER)
Improvement of C.K. Agarwalla Path near Kamrup Academy School by providing GSB, WBM, ICBP and Brick Masonry Drain under SOPD-G for the year 2023-24
Improvement of Sankar Nagar Byelane 1, 2, 4, 7, 9 and sub-byelane 1 of Sankar Nagar byelane-4 including RCC cover drain at Pandu. (RETENDER).
Construction of Road from Kokrajhar Main Bazar to Law College along with drain, Cycling Track, etc. under City Infrastructure Development Fund for the year 2019-20.
Improvement of Birina Path, Janakpur at Kahilipara with RCC load bearing drain, RCC cross culvert and Road works under SOPD(G) for the year 2023-24