Loading…
Loading…
8,330 results • Best match
CONSRUCTION OF STREET AND DRAIN IN HARIJAN BASTI FROM N.H. 07 TOWARDS H/O SH. SUMER CHAND AND NEAR THE H/O SH. RISHI PAL SH. SEWA RAM OPP. PANCHAYAT GHAR AND ECT IN W. NO. 01, PAONTA SAHIB HP
Annual maintenance plan for the year 2022-2023 on Chhurla to Khanipandh road Km. 0/0 to 7/500 SH Providing and laying Bitumnious concrete in Km. 0/0 to 2/0 and C/O PCC drain Road Number HP0602VR04423201.
Restoration of rain damages on link road Mihara to Unda road km 0/00 to 1/300 SH Construction of R/wall, Patch work and drain in between 0/200 to 0/500 at various Rd Under PDNA Year 2023
Strengthening Including Improvement Of Road Safety By Construction Of R Wall, B Wall Edge Wall Berms Parapets At Selected Reaches Double W Beam Crash Barrier Single Side U and V Shape Drain And Providing Fixing Of Tubular Type Retro-Reflective Signag
Recovery and Reconstruction on Shahpur Kairi Chatrer road KM 0/00 to 8/900.(Under PDNA).(S.H Construction of R/Wall at RD 6/400 to 6/415 U-shape Drain with Edge wall at RD 6/400 to 6/476.)
Restoration of rain damages for T/well No.2 Nr Truck Union in Tehsil Distt Una HP (SH Providing laying of RCC pipe NP-3 ( 900 mm dia in road crossing for drain out the rain water Nr Truck Union)
Construction of link road from Ambehra Harot to Mohalla Sunarian Brahmana km 000 to 0780 SH CO 900mm dia RCC Hume pipe culvert at RD 0558 PL GSB MT CC pavement and drain between km 000 to 0585 under MNP
Custom Bid for Services - for hiring of JCB Tipper Manpower for loading shifting unloadingback filling leveling earth and debris etc for road repair and maintenance from Hill Top to Nadi and Quarry and drain cleaning along these road water supply ma..
Repair and Restoration of Rain Damages Link Road Chintpurni Amlehar Road via Dhalwari 8500 to 12000 SH Co Retaining wall RD 8800 to 8900 and 10100 to 10300 and V Shape Drain work RD 8500 to 9800 Under PDNA 2023
C.O PUCCA BHARO TO LOWER SWANA ROAD KM 0.0 TO 2.100 IN DISTT KANGRA H.P SUB HEAD FORMATION CUTTING C.O R.WALLS CD WORKS P.L GSB WBMII.WMBIII TARRING PCC DRAIN PARAPTES ROAD SIDE FURNITUTRE INCLUDING FIVE YEAR MAINTENANCE UNDER NABARD RIDF XXIX
Job 14 Restoration of rain damages of Link road from Ghaluwal to Village Badehra Teh.. Haroli Distt. Una km. 0-0 to 5-135 Sub Head C.O U shape drain and Paver block at RD. 2-800 to 2-870
C/o Retaining wall for protection of Damaged road from cowshed to Jai Mata Industry, village Sattiwala. (SH C/o Retaining wall, Road crust etc.), C/o Damaged Retaining wall near Rest House Manjhotu, C/o Damaged drain village Jharmajri.
Restoration of rain damages on Link road Govt High School Suhin to Mandholi SH CO Retaining walls on Karluhi to Mandholi road at RD 2010 to 2025 2050 to 2063,2100 to 2105and Vshape drain in Km 2000 to 2130 under PDNA2023
Annual surfacing on Pungh Ghagnoo road PMGSY SH Providing and laying 30mm thick bituminous concrete including profile correction layer V shape drain and road marking in Km 10.0 to 12.0 and Annual surfacing on Bangalu Luhnu road PMGSY SH Providing and
Providing and fixing of S.S. railing in the entrance ramp, covering of drain with MS grating in front of C-30 building and repair of stair steps in between Oak mess and B-17 hostel at North Campus of IIT Mandi
Restoration of rain damages on Hari Kursai Taroun Barota Ladrour road km 0/00 to 7/00 SH Construction of R/wall, B/wall and drain at various Rds in between 0/00 to 2/00 Under PDNA Year 2023
Restoration of rain damages on link road to Village Kharoh km 000 to 3500 SH CO VShape drain in km 1195 to 1240 CO Retaining wall at RD 2880 to 2895 3105 to 3150 and Interlocking Paver block Under PDNA2023
M C Road from Boileauganj to Chakkar Chowk via BJP office R D 0 0 to 1 120 in ward No.8 (SH Construction of U Shape drain at RD 0 865 to 1 120 with steel grating work etc)
C/O link road Bhaned ki Johari to Devraja mandir km 0/0 to 1/00 (SH C/O R/wall and V-shape Drain at various Rds between km 0/200 to 0/500) Under MNP 2020-307-1272
Certain repairs to internal external plastering, painting, roof sheet, plinth protection, joinery, facia, footpath drain work etc. and other misc repairs alongwith E/M related repair works in OTM Accn of 25, 27 Camp, 600 Men wing area, CAD Yol Cantt
Repair and restoration work on link road to mohalla Tipperain Km 0/0 to 6/650 SH C/o U-shape drain at RD 0/585 to 1/235, Patch work at RD 3/480 to 4/485 under PDNA 2023
Maintenance of road from Kuppa to Batseri km 13.0 to 24.0 Distt. Kinnaur (Portion of Karchham Sangla Chhitkul road) (SH. P. L Kharanja stone soling, renewal coat V and U shape drain at various reaches in km 13.0 to 24.0)
Annual repair and maintenance to various residential Building under Shimla Division No.III (SH-Repair of Drain Plinth Chamber PL Chequered Tiles Covering of Balconies in Block L II 83 to 86 and repair work in LII 82 at Nabha Estate Shimla )
Providing sewerage facility to New Bilaspur Town in Tehsil Sadar District Bilaspur (SH Providing laying jointing and testing of DI pipe 150mmdia,C/o bricks masonry manhole chamber, providing laying RCC pipe 300mmdia for drain and MS angle grating ove
Restoration of Rain Damages on Bhujond Gatlog Road km. 0/00 to 10/500 (SH C/O B/wall from RD. 7/570 to 7/610 and C/O unlined Drain from Km. 6/00 to 7/00) Under PDNA
C/O Link Road From Ratwa to Gehal Km. 0/0 to 3/400 (Sh P/L WBM Grading -l, Grading- II, M/T, C/o Essential parapets and road side drain in km. 2/00 to 3/00) MNP
Special repair on link road to sada Shiv Mandir Km 000 to 2000 SH Co Retaining Wall V shape drain extension of hume pipe culvert and Providing and laying GSB WMM and tarring for extra widening on curves at various Rds
Repair Restoration of rain damages on Mata Chintpurni to Amlehar road km 000 to 9350 SH Const of Retaining wall in km 2105 to 2115 2510 to 2525.50 2 870 to 2884.50 and U Shape drain in various RDs DC Deposit
Job 1 Improvement and Widening of Santokhgarh Mehatpur Road km. 0-0 to 7-0 Sub Head Dismantling of existing shops, Providing and Laying GSB, WMM, BM, BC, C.C. Pavement, V-shape drain in RD 6-980 to 7-0.
R R Damage to Rohru Arhal bashal road SH C o R wall at Rd 11 395 to 11 41011 580 to 11 602 B wall at RD 11 570 to 11 600 and drain 11 285 to 11 550
Construction of Khanotiyo Bassali road km 0/0 to 13/0 (SH Metalling Tarring Formation cutting Retaining wall, Breast wall CD works, RCC slab culvert, CC V-shape drain parapets in km 0/0 to 13/0) under NABARD RIDF- XXV
Repair and Maintenance of PWD Rest House at Fatehpur SH Painting and Polishing of Rest House building construction of RCC Gutter Renovation of toilet Water proofing U shape drain with grating etc. and providing and fixing wall paneling in Meeting
Up-gradation of Marredi Sillagharat Road km 0/000 to 13/800 Formation Cutting, C/o Passing Places, Missing CD, Side Drain, Parapets, CC Pavement and Tarring work under PMGSY-II, (Batch - I, 2019-20) under Package No. HP-02-03.
Upgradation of link road from NH05 to Shalkhar Km 0.000 to 2.390 SH RODF C.O R.wall B.wall Parapets W beam metal crash barrier V shape PCC side drain, solid cause way Metalling and Tarring including five year maintenance HP0560 Pooh
A/R and M/O Nahan Dadahu Haripurdhar Road Km. 55/00 to 79/00 (SH P/L interlocking Paver block and PCC V-Shape road side drain from RD.58/105 to 58/315 and 60/900 to 61/130)
Annual maintenance plan for the year 2022-2023 on Badah Pahnallah road to Shilihar Km. 0/0 to 9/700 SH Providing and laying Bituminous concrete in Km. 6/0 to 8/0 and C/O PCC drain Road Number HP0602VR044122207.
Construction of RCC wall, drain with MS grating, G.I. chain link fencing for hockey ground, cricket practice pitch, basketball court, tennis court and Kiosk in LP-1 at North campus of IIT Mandi. (S.H.Providing EI, Geysers and Fans in Kiosk
Annual surfacing on Sundernagar Kapahi Leda road (VR) (SH Providing and laying 30mm thick bituminous concrete including profile correction layer V shape drain and road marking in Km 0/0 to 2/600) Annual Surfacing on Sundernagar Circular road (VR) (S
Upgradation of Link road from Barring to Tibok, Othang and Yangthang Km. 0/00 to 9/215 under NABARD-RIDF-XXX SH ROFD, MT, Retaining wall, Breast wall, CD work, V-shape drain, Parapets, Wire Crate and Sign Board etc.
C/O Road from Dhauladhar Height hotel to residential colony Ward No. 13 of Dharamshala Phase -I S/H - P/L Interlocking Cement Concrete paver block and V- shape drain on both sides from R.D. 0/0 to 0/200
Periodical renewal coat 30mm thick bituminous concrete with paver on Bhaloun Sohari Chouli road km 3000 to 4000 5720 to 5970 and 11000 to 13000 including hot applied thermoplastic paint cat eyes and Vshape drain at various RDs HP1202VR0063 under PM
Restoration of rain damages on Nandpur Mairi road km 000 to 24195 SH Const of Ushape drain cum Edge wall and Berms from RD 19250 to 19500 Retaining wall at RD 19280 to 19350 and RD 19410 to 19473 under PDNA2023
Annual maintenance plan for the year 2022-2023 on Neoli Tharman Jagot road Km. 0/0 to 8/0 SH Providing and laying Bituminous concrete in Km. 1/0 to 3/0 and C/O PCC drain Road Number HP0602VR000723202.
Job 6 Construction of link road from Saloh Bhadauri Road to Saloh Nalka km. 0-0 to 0-400 Sub Head C.O U Shape drain with edge wall, WMM, BC in km. 0-0 to 0-400 therein Under DMFT
Providing and laying metalling and tarring works on Gugra to Tarala road Portion Gugra to Shigar km 0/000 to 11/750 Sub Head- Providing metalling and tarring works and PCC side drain in km 8/225 to 11/750
Restoration of rain damages on various roads under Karsog SubDivision (SH Hiring of JCB for removal of slips/debris, dressing of berms, clearance of drain etc and Hiring of Tipper for carriage of debris/muck in various roads under Kelodhar Section
Ordinary repair to Nahan Do Sarka Sarahan Kumarhatti Road on NH 907A Km 0/00 to 78/00 (SH C/o RCC U Shape side drain near Banahan ki sair to tikha mor at RD 35/740 to 35/875)
Repairand Restoration of Rain Damages link road Dakha wala Khoo to Badoh in Gram Panchayat Badoh Km 000 to 1500 SH PL Interlocking Concrete Paver Block in Km 0200 to 0340 and Drain in Km 0230 to 0430 Under PDNA 2023
Restoration of rain damages on Har Pukhar to Chanouta road in Km 0/0 to 3.000 Providing and laying Bituminous concrete with paver finisher in Km 1.00 to 2.00 C.o U-shape drain at RD. 1.500 to 1.700) Under NDRF
REPAIR TO EXTERNAL WALL PLASTERING, REPLACEMENT OF OH TANKS, GATE VALVES, OVERFLOW PIPES FROM PVC OH TANK TO DRAIN INCLUDING FACE LIFTING SMART PERIODICALS TO CERTAIN BUILDINGS IN 28/3 CAMP AREA UNDER AGER B-R-I AT YOL MIL STN