Loading…
Loading…
8,330 results • Best match
Repair of earthen shoulder, unlined drain and removal of slips
Repair of earthen shoulder, unlined drain and removal of slips
C/O Drain and Path in Hud Kuhl, Pump House).
interlocking paver block, soling, M/T, U shape drain etc.
Construction of link road from Yol to 53 Mile (Yol Rajiana) road Km 0/000 to 10/555 in Distt. Kangra (H.P.). (Sh-Construction of road side Drain, both side Footpath and Steel work etc in Km 10/250 to 10/555)
ESTORATION OF RAIN DAMGES ON JWALAMUKHI DEEHRA JAWALI RAJA KA TALAB ROAD 4.0 TO 39.180 SH C.O R.WALL AT RD 4.400 TO 4.410 AND C.O U SHAPEE DRAIN AT RD 4.270 TO 4.398 4.430 TO 4.500 C.O U BOTH SIDE 4.530 TO 4.700
Construction and Up-gradation of link road from Mandorghat to Jamog via Bhargan KMs 0/0 to 5/040)(SH Formation cutting , B/Wall, E/Wall, side drain Metalling and Tarring, Parapets , and crash barrier in KMs 0/0 to 5/040)
Upgradation of Amarpur Hadsar Dahad Jamman Ghumarwin Road Km 0/000 to 7/100 in Tehsil Ghumarwin District Bilaspur H.P. SH Improvement, Passing Places, R/walls, B/ walls C.D. work, GSB, WMM, Tarring work, Side Drain and Parapet Under NABARD-RIDF-XXXI
Restoration of rain damages on Bhager to Rishikesh road km 0/00 to 4/00 SH C/o V-shape drain at RD 3/630 to 3/900 and R/wall at Rd 3/570 to 3/590 under PDNA year 2023.
Annual maintenance plan for the year 2022-2023 on link road to village Jia from NH Km. 0/0 to 1/500 SH Providing and laying Bituminous concrete in Km. 0/0 to 1/500 and C/O PCC drain Road Number HP0602VR00122221.
Construction of link road from Naggar to Karishna Mandir via Thawa up to Chachogi Km. 0/00 to 3/600 under NABARD-RIDF-XXX SH FORD, MT, Retaining wall, Breast wall, CD work, V-shape drain, Parapets, W-metal Beam Crash barrier etc.
Improvement and Widening of road from Gondpur Behli to Bathu Gurplah including bridge over Gondpur Jaichand Khad Km. 0-0 to 8-655 Sub Head Imp. Retaining wall., Missing CD, GSB,WMM tarring work, side drain, paver block, C.C pavement and parapet incl
C/O link road village Kajwa km. 0/00 to 2/135 (SH P/L WBM G-I,G-II and M/T alongwith PCC road side drain in Km. 1/00 to 2/135 alongwith 1 No Culvert at RD. 1/090)
Construction of street and drain from H.o of Sh. Sanjeeve Kumar towards the H/o Sh. Kawaljit Singh and H/o Sh. Radhey Shyam Towards the H/o Sh. Manjit and from N.H to H.o Sh. Karam Singh in W.no-02 , Paonta Sahib
IMPROVEMENT WIDENING AND STRENGTHING OF SADWAN TO KALESHWER RAOD KM 0.0 TO 7.00 IN DISTT KANGRA HP SUB HEAD C.O R.WALLS CROSS DRIANGES WORK GSB WBM G-II WBM GIII CC PAVEMENT TARRING WORK INTERLOCKING PAVER BLOCK ROAD SIDE DRAIN AND PARAPETS
Restoration of various roads under Division No. III Shimla. SH Repair of drain and covering with grating chotta Shimla to Kasumpti road at Rd 0.410 to 0.10 and road from Vikas Nagar to Kasumpati road vid SDA complex at Rd 0.00 to RD0.250.
Improvement and Metalling Sai to Bawasani Sill Dhar road Sub Division Baddi Division Nalagarh (SH M/T WMM in B/W km 17/200 to 18/00 and C/O Missing culvert 900mm dia hume pipe and drain). Under MMGSY 2nd call
Improvement and strengthening of Chail Gohar Pandoh road km 0/00 to 24/00 (MDR 25) (SH ROFD, Retaining walls, Breast walls, V-shape drain, slab culverts, Extension of hume pipe culvert and metalling and Tarring in Km. 0/00 to 12/00).
Link road to Kheri Lanacheta road Village Pipli Km.0/0 to 4/510 (SH P/L Kharanja stone soling, V- Shape drain in km. 0/940 to 1/00 and C/O HPC at RD. 0/940) under black spot (HRTC POINT)
Restoration of rain damages Pong Dam Jassur Fatehpur road near Barot SH C o U shape drain at RD 31.800 to 31.900 and providing and laying cement concrete flooring Toe wall and construction of wire crate for protection of bridge at RD 31.750
R R Damage to Jhalwari to Khyaltu road km 0 00 to 1 00 SH C o 900mm HPC at RD 0 720 and Rwall at RD 0665 to 0685 0330 to 0345 and Unlined drain km 0 00 to 1000 Deposit Work
A/R and M/O on NH-305 Sainj Luhri Aut road Km 0/00 to 97/00 (SH- C/O PCC B/wall at RD 21/668 to 21/752 and V-shape drain at RD 21/610 to 21/752).
Construction of access road with side drain for to and fro movement in GOC-SFT and steel door at main gate to prevent unauthorized people and stray animals from entering Gate Operation Chamber- Silt Flushing Tunnel (GOC - SFT) (Pkg. No. C-613)
Periodical Maintenance on Draun to Shikawari Road Km 0/000 to 7/000 for the year 2019-20 (SH P/L Bitumen concrete 30mm thick single layer V shape drain in km 0/000 to 2/000 and 3/000 to 4/000
Job 1 Construction of Link Road Lawana Basti Ispur to Dera Baba Bharthri Damiyan G.P. Ispur Tehsil Haroli Distt. Una km. 0-0 to 4-200 Sub Head P.L WMM, BC, in RD.1-800 to 3-015 and drain Under OTMNP
Construction of Fagu Bathaudhar road km 0/00 to 10/00 (SH Providing and laying WBM G-II in km 8/730 to 9/430,Construction of unlined drain C/o culvert along with both side wing wall at Rd 6/350).
Repair Restoration of rain damages on Repoh Manjhar Suri Paloh road km 000 to 15500 SH U Shape drain at RD 3975 to 4035 LHS RD 7900 to 8005 LHS and Const of Retaining wall at RD 4050 to 4065 RHS DC Deposit
Repair of Bharwain Chintpurni Khatiar Damtal road Km. 46.500 to 64.705 Under SDRF Deposit work SH Construction of Retaining wall LHS at RD. 51.150 to 51.155 wing wall at RD. 58.080 to 58.085 and U shape drain at RD. 58.080 to 58.130
Upgradation and strengthening of Naina Tikker Deothal Oachghat road km 0/0 to 22/630 (22/170) Under NABARD (SH Removal of formation deficiency P/L WBMIII Metaling Tarring Side drain, Parapets and Road sign board in between Km 14/260 (13/800)
AR MO of RCD road km 000 to 92695SH Hiring of JCB Excavator cum loader for removal of Snow slips, laying of moorum on road surface maintenance of drain and repair of shoulders from km 5100 to 92695 and various link roads
Restoration of rain damages on Badukhar Hatli Moukhar road km. 2.00 to 18.200 SH Construction of U shape drain at R.D. 14.400 to 14.490 Retaining wall at R.D. 14.490 to 14.500 14.850 to 14.860 and 14.930 to 14.940 providing and laying Wire Cra
Restoration of rain damages on Sanoura to Jatehar road km 0/000 to 10/340 in Tehsil Dharamshala, Distt. Kangra HP SH-Construction of P.C.C. Retaining wall at RD 3/935 to 3/960 and U-shape drain 3/935 to 3/985
Restoration of rain damges of LWSS Tepra Sanyari More in Tehsil Arki District Solan HP SH_ Repair of existing pump house Filter bed replacement of old rusted GI fitting of various dia in distribution system C_o drain and outlet chamber near Main stor
RRD on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Portion Km. 0/0 to 9/0 (SH C/O B/wall at RD 6/714.50 to 6/731.10 RHS and V-shape drain from RD 6/660 to 6/780 RHS)
Performance Based financial incentive 2019-20 (Part-I) during the year 2020-21 for periodic maintenance etc. of PMGSY rural roads on Seola road Km. 0/0 to 2/0 (SH- Providing and laying, 30mm thick bituminous concrete and V-shape drain).
RESTORATIONOF RIANDMAGES ON BANKHANDI TO PAISA ROAD KM 0.0 TO6.800 SU P.L 80MMTHICK PAVER BLCOK AT RD 1.2001.320 AND V SHAPE DRAIN BETWEEN RD 0.500 TO 3.500 R.WALL FROM RD 3.700TO 3.715 P.L CRECTING WMETAL BEAM CRASH BARRIER BETWEEN RD 2.750 TO 2.
Site development C O B Wall and R Wall C O Drain i c boundary wall on R wall at 33 11KV 1x 3 15 mva Manned Sub Station at Smaila under Electrical Sub Division Baldwara under Electrical Division HPSEBL Sarkaghat Distt Mandi
Restoration of rain damages to road from Bharari to Kuftadhar Km 0.00 to Km 0.800 SH C.O retaining wall at Rd 0.150 to 0.165, 0.300 to 0.360, Breast wall at Rd 0.220 to 0.250, V.Shape drain and CD work at Rd 0.365.
R/R damages on Swarghat nand road km 0/0 to 11/00 (SH C/O U shape drain at RD 0/0 to 0/200 and P/L Interlocking tile at both side of road at km 0/0 to 0/173).
Improvement of kaloha pargaur Dhalaiar dada siba Sanasur Terrace Road Km km 0/0 to 60/920 Sh.C/O R/wall and parapets between Rd 54/160 to 54/597 and PCC drain between Rd 54/345 to 54/425 UNDER Industrail Corridor
Annual periodical maintenance for the year 2021-2022 on Bharai Bagan Peej road Km. 0/0 to 7/855 SH Providing and laying bitumen concrete in Km. 4/0 to 7/855 including BUSG and construction of PCC drain 400 metrs. length.
Restoration of rain damages on Dangar Barota Ladrour road km 0/00 to 9/165 SH Construction of Breast wall, Retaining wall , Cement concrete work and drain in between km 0/00 to 9/165 at various damaged RDs Under PDNA Year 2023
C/O Solan Meenus Road km. 61/00 to 92/000(SH C/O PCC road side drain from km. 61/00 to 70/00 and applying of thermoplastic line from km. 61/00 to 76/00 both at essential reaches.Under MNP
Annual surfacing on Ghangnoo Khanokhar road PMGSY SH Providing and laying 30mm thick bituminous concrete including profile correction layer V shape drain and road marking in Km 0.0 to 4.650 and Annual surfacing on Jarol to Jeor road Salwana to Jeor P
RR Damage to Various road under Kansakoti Section Rohru Sub Division SH Hiring of JCB Excavator cum loader clerance of drain and maintenance of road surface etc And Hiring of Tipper for carriage of muckstone etc removal of slips land slide mainte
C/O road from Firnu Morh to Damohar via Chairan Km 0/0 to 2/300 SH F/C R/Walls B/Walls CD work i/c wing walls Essential Kharanja Soling road side unlined drain dumping structure etc under NABARD RIDF XXVI
Up gradation of Shongthong to Barang road km 0.0 to 5.0S SH. C.O R.wall C.D. work P.L WBM Gr.I G.II and G. III P.L BC, V.Sape drain parapets and P.F logo sign board etc. Km 0.0 to 5.0 Under NABARD RIDF XXV
Restoration of Rain Damages on Kaloa Pragpur Dhaliara Dada Siba Sansarpur terrace road km 0/00 to 9/00 (SH Construction of 900 mm dia Hume Pipe Culvert at RD 8/900, Approach path to School and U shape drain at various RDs )
RRD on Deodhar Kheelgaloo road Km 0/00 to 24/500 (SH P/L 80 mm thick interlocking paver block at Rd 10/200 to 10/260,11/790 to 11/850 and C/O U-shape drain at various Rds) under PDNA 2023
Repair and Restoration of Rain Damages NMT road from Mubarikpur to Marwari Punjab Boundary KM 54675 to 72555 SH Repair of Damages Extension of Slab culvert at RD 67960 68120 and UShape Drain at RD 60630 to 60930 RD 64800 to 65600