Loading…
Loading…
8,339 results • Best match
SH - Construction of 1.00 mtr. Span RCC slab Culvert 0/850 and 600mm dia Hume pipe culvert at RD 1/000 alongwith catchpit and drain
formation cutting, R/wall, C.D. soling ,wearing ,Tarring ,Parapets, V-Shape drain and 2 Nos 10.00 mtr span RCC slab culverts ) Under Nabard RIDF-XXV).
SH C/O Retaining wall from RD 5/918 to 5/936 and C/o U-Shape Drain at RD 1/060 to 1/185
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V shape drain and rod marking in Km 144/0 to 146/0)
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V shape drain and rod marking in Km 135/0 to 140/0
(SH Removal of formation Deficiency, C.D. works, Parapets, R/Wall, B/Wall and Gabions wall M/T works and P.C.C. drain) under Nabard RIDF-XXVII
Providing and Laying WBM Grading-I, Grading-II, Grading-III, M/T, C/o Road side Katcha Drain in Km 0/0 to 2/0
Providing and laying Bitumen concrete Thermoplastic edge lining, Zebro crossing in Km. 0/0 to 0/726 and C/O PCC drain 100 mtrs. Length).
C/o Cement Concrete Pavement from KM 0/715 to 0/870 and V-Shape Drain at RD 0/610 to 0/655 under MMSRY
SH M/T road in Km0/0 to 3/0 SW M/T road in Km2/0 to Km3/0 including side drain and parapets
SH Construction of V-Shape drain at RD 1/130 to 1/630 and R/wall at RD 1/275 to 1/305 Under OTMNP
C/O of HPC at RD 0/570 and 1/705 and U-Shape drain at RD 3/680 to 4/000. (OFC DEPOSIT WORK)
Formation cutting , R/wall,B/wall, CD works, Mettaling and tarring, V-shape Drain, Parapets and Sign board in Km 0/0 to 3/960
C/o PCC R/wall at RD 0/390 to 0/405 and PCC U-shape drain at RD 0/400 with grating ) Deposit work
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain and road marking in Km 16/0 to 19/0.
(SH - C/O 40.00mtr span bridge, formation cutting, passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, side drain and parapets).
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain and road marking in KM 0/0 to 1/0.
Hiring of Excavator Cum Loader along with tipper for clearance of side drain, maintenance of berms and removal of debris/slips in Rest House Section)
Hiring of Excavator Cum Loader along with tipper for clearance of side drain , maintenance of berms and removal of Debris/slips in Kandaghat Section-I)
construction of edge wall, U shape drain and parapets, P/L GSB, Gr-II, Gr-III and Tarring in km 4/420 to 4/510)
Hiring of Excavator Cum Loader along with tipper for clearance of side drain , maintenance of berms and removal of Debris/slips in Kandaghat Section-II)
Hiring of Excavator Cum Loader for clearance of side drain, maintenance of berms and removal of Debris/slips in Kandaghat Section-I) (Job No.1)
SH C/O Unlined Drain, Maintence of Shoulder and Clearing and grubbing road land and Providing and laying Kharanja Stone Soling at Various Slushy reaches
SH C/O Unlined Drain, Maintence of Shoulder and Clearing and grubbing road land and Providing and laying Kharanja Stone Soling at Various Slushy reaches
P/L GSB, WMM, M/T and V-shape drain in extended portion in Kangoo Bazar from km 9/470 to 9/850 ) MDR -063
C/O PCC R/wall at RD-0/805 to 0/830 and U-shape drain at RD-0/800 to 0/950) (under PDNA).
SH Construction of Breast Edge wall retaining wall cement concrete pavement U and V shape drain etc. at various R.Ds between km. 4.500 to 9.00.
SH C/O of R/Wall at RD 1/300 to1/315, C/O Unlined Drain, Maintence of Shoulder and Clearing and grubbing road land
Formation Cutting, C/o passing places, CD works, Side Drain, Parapats,Tarring work and five year maintenance under PMGSY-IV Package No HP-09-786
P/L CC Pavement in km 0/670 to 1/00 V-shape Drain in km 0/300 to 1/00 in Leg No. 4)
Formation Cutting, C/o passing places, CD works, Side Drain, Parapats,Tarring work and five year maintenance under PMGSY-IV Package No HP-09-785.
SH C/O Unlined Drain, Maintence of Shoulder and Clearing and grubbing road land and Providing and laying Kharanja Stone Soling at Various Slushy reaches
Formation Cutting, C/o passing places, CD works, Side Drain, Parapats,Tarring work and five year maintenance under PMGSY-IV Package No HP-09-784.
C/O road side drain at km 19/930 to 20/350 and R/Wall at Various RDs in Km 19/000 to 20/150
SH Construction of unlined drain, cutting of and providing anti laying Kharanja Stone Soling at Various Slushy Beaches between kn 0/00 to 8/570
C/O Toe Wall of HP culvert at RD 2/150 and C/O U-shape drain at RD 2/130 to 2/230) (PDNA)
Providing and laying 25 mm thick bituminous concrete and thermoplastic lining in paint curve portion only)
SH Repair of Pot holes in km 000 to 1585 000 to 1000 and 000 to 1000 at various RDs Under MMSRRY 2025 26
Construction of link road from Panog to Ajroli Km 0/0 to 3/00 ( SH Formation Cutting 5/7 Mtrs wide road from Jeepable standard Cross-Drainage and P/L Soling Grade-I in Km 0/0 to 3/00).(SW- Construction of 900mm dia RCC HPC at RD 0/350, 0/670
Balance Work estimate for the Construction of Link Road From Sanawar Gate to Mandudhar Via Shillar Pathia From Km. 0/000 To Km. 3/500.(SH Formation Cutting, C/o R/walls and B/walls, C/o Cross Drainage, P and L, GSB,WBM G-II and G-III, OGPC and Seal C
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Formation Cutting 5/7 Mtrs wide road , Cross- Drainage and P/L Soling in Km 0/0 to 6/0)( SW- Widening of curves/road cutting at RD 0
Construction of link road from Panog to Ajroli Km 0/0 to 3/00 ( SH- Formation Cutting 5/7 Mtrs wide road from Jeepable standard , Cross-Drainage and P/L Soling Grade-I in Km 0/0 to 3/00).(SW- Construction of Retaining wall at RD 1/060 to 1/078
Construction of link road to Nanidhar Bohar Khari Thumbari road Km 0/0 to 4/150 ( SH- Jeepable standard 2.40 Mtrs wide to 5/7 Mtrs wide road , Cross-Drainage and P/L Soling in Km 0/0 to 4/100)( SW- Jeepable standard 2.40 Mtrs wide to 5/7 Mtrs wid
C/O B/wall at RD 0/930 to 0/952 and P/L CC Pavement and U-shape Drain at 0/930 to 0/990
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat Road Side V Shape Drain and Providing and applying thermoplastic layer
SH Const of VShape drain at RD 300 to 3/200 3205 to 3310 3340 to 3610 4510 to 4690 RHS and 3240 to 3510 LHS
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets and road furniture including five year maintenance) under NABARD RIDF XXVII
Formation cutting,passing places,R/walls, B/walls, Crash Barrier, C.D. work,GSB,WMM,Tarring work, side drain,parapets and sign boards)under NABARD RIDF-XXXI.
SH P/L MT U Shape drain and parapets in Km0/0 to 3/0 SW P/L M/T in Km2/0 to Km3/0
Providing and laying WBM-III, Bituminous Macadam, Bituminous concrete, interlocking paver blocks, PCC V-shape drain, parapets, road marking and road sing boards ) under NABARD-XXVIII