Loading…
Loading…
8,308 results • Best match
Restoration of rain damages on Chharour Nallah to Tipri road Km 0/00 to 4/300 (GP Danogi) (SH-Removal of slips/ muck etc. at various road under Bhunter Sub Division
Cleaning of main Nallah from main gate (KV Gate) of Chamera-II Power Station to Pump House along with repair of damaged retaining walls on both banks (Pkg No. C-999)
RRD on Rada Nallah to Dhandal road km. 0/00 to 2/900 (SH- P/L cement on both side berms between Rd 02/040 to 02/320) under PDNA 2023
Protection of spillway channel towards Basati Nallah RD 123 to 130 M by providing wire crate wall and cement concrete work which was damaged due to heavy rainfall during monsoon 2025
R R Damages on Sariya Nallah Kupri Melthi Road km 0 00 to 6 00 SH C O R Wall at RD5 885 to 5 905 1 705 to 1 720
R R damages on Badshal nallah Ramteri kharla road 0 00 to 6 500 SH C O R wall at Rd 2 015 to 2 023 2 003 to 2 213
Augmentation of GWSS Khorni Nallah to Barthata in GP Barthata in Tehsil Jubbal Distt Shimla HP SH Construction of RCC Storage tank of 15000 Ltrs Capacity at Village Mural Ram Nagar
S/H-P/L cement concrete work, steel grill work to various paths, drains and R/walls in lieu of repair works of R/wall and drain near S.N Kapoor house, R/wall near Asha madam house, Nallah near Binny house etc. and other emergent repair works Part-I
Repair of path an drain
SH- taking out and laying of interlocking paver on RHS berm and cleaning of drains).
SH- Taking out and laying of interlocking paver on RHS berm and cleaning of drains).
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling and Tarring, Construction of Road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure.
Formation Cutting, wire Crates, Retaining Walls, Breast Walls, Cross Drainage, Side Drains and parapets under PMGSY, (Batch - I, 2018-19) Package No. HP-02-308
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling Tarring, Construction of road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure etc
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling and Tarring, Construction of Road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure.
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling and Tarring, Construction of Road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure.
Repair of Wooden Foot Bridge, at Channi, (Over Channi Nalla) under LADF. 180 MW. Holi-Bajoli Project Budget Scheme, in Nayagran Gram Panchayat, Surehi/Yada Beat, Barabanchho Block, Trehta Forest Range, Forest Division Bharmour, (H.P) during the year
Tender for Prov. SOP to LWSS Banoha Bhagwani Ransal and its adjoining villages in GP Ladda, Tehsil Ghumarwin by prov. 63 KVA 11/0.4 KV S/Stn. Parnal Nalla in (E) section Kuthera under ESD HPSEBL, No.II Ghumarwin.
P/L 30 MMBituminous Concrete, Thermoplastic paint strip and construction of drain in km 5.00 to 7.00) (Village Road )
Concept Aluminium Electronic Auto drain valve, Warranty 1, Concept Aluminium Electronic Auto drain valve, Warranty 1 year
Concept Aluminium Electronic Auto drain valve, Warranty 1, Concept Aluminium Electronic Auto drain valve, Warranty 1 year
Repairing of drain and fixing of iron frame over the drain of Admin building at BSPS, Surangani
DRAIN END PIECE & BELLOWS / DRAIN END FOR LHB BRAKE CYLINDER.MAKE: FAIVELEY TRANSPORT RAIL TECHNOLOGIES INDIA PRIVATE LIMITED.
C/O B/wall at Rd 0/00 to 0/030, U-Shape drain at Rd 0/00 to 0/050 P/L cement concrete pavement at Rd 0/00 to 0/050) (under PDNA Head)
CO Link Road from Shashwari to HB Ghartu Nala km 000 to 2000 SH FC 57 wide road at RD 0750 to 1180 DC Deposit
C/o Vegetative Check Barriers and Dry Stone Check Barriers at Ali Dhar Nala in GP-Deothi, under Sainj unit for the F.Y. 2025-26
C/o Vegetative Check Barriers and Dry Stone Check Barriers at Katyana-II Nala in GP-Balghar, under Sainj unit for the F.Y. 2025-26
Removal of Slips over Gravity main at Sayaral Nallah, Mathyani Nallah and near RD industry Skor
Tender for providing SOP to WSS Bindh Nalla Barandi GP Barsar by providing 11 kV HT Line to proposed 63 kVA Sub Station WSS Bindh Nala Barandi in Electrical Section Gopalpur under ESD No.II, HPSEBL Palampur.
C/O 18.75 mtrs single lane span RCC T Beam Bridge across Katal Ki Nali on Chandi Ghyan road at rd 5/085 Under SCDP
(SH- C/o road, road side drains, Culverts, R/wall, Toe wall and wire crate work).
C O Nallah Intake Chamber
C/o 10no. nallah intak
C O Nallah Intake Chamber
Hiring of 30 No. Safai karamchari through Contractors/ Firm/ Society/ NGO for cleaning sweeping of street Roads, Drains, Cutting Bushes and any other sanitation work
Up-gradation of road by P/L 80mm thick interlock paver blocks and side drains from Silver Oak Sector -6 Ward No 5, MC Parwanoo
REPAIR AND CLEANING OF SEWAGE LINE, MANHOLES, SEPTIC TANKS, DRAINS ETC AT CERTAIN PLACES AT DGRE RDC MANALI UNDER AGE (I) R AND D MANALI.
Door to Door Garbage collection andCleaning/Sweeping of Municipal roads, streets, drains, Nallahs and cutting of Grass and bushes in sector 1, Municipal Corporation Palampur.
Removal of slips, stone soling and V-shape drains in HPSEBL SVP Bhaba Power House road at different RDs under Civil Mtc Division HPSEBL Bhabanagar.
Repair to road paths with pavers and chequered tiles, culverts, drains, retaining walls, gratings at Yol Cantt under AGE BR-I of GE (KH) YOL
Construction of Engineering college Jeori Kotla Distt. Shimla HP (SH Repair work of rain damage plinth protection, cleaning of drains and bush cutting work etc)
Custom Bid for Services - Biennial Contract 20252026 for cleaning of roads drains of plant offsite area Similar Category Operation and Maintenance Power House/Power Plant
Up-gradation of Cheri Via Neri Kiar Koti road km. 12/330 to 17/935 (Up to Neri) (SH R/wall and B/wall, cross drainage works, P/L WBM-II and III, M/T works road side V-shape Drain, Essential parapet etc in km. 12/330 to 17/935
Construction of link road from Laa Devi Temple to Giri Basti Rajban km.0/0 to 1/450 (SH-C/O 5/7 mtrs.wide road,C/O cross drainage works,P/L G-I and C/O V-shape side drain in km.0/795 to 1/450).under MNP
SH Construction of Footpath, drain and metalling tarring on open space Right Side
SH -Formation cutting 5/7 mtr Wide R/wall, B/wall, C.D. works, road side unlined drain Kharrnja stone soling, and Parapets, dumping structure n km 0/0 to 4/675
SH Widening of road, Extension of curve, Cross Drainage work, Providing and laying GSB, WMM, 50mm thick Dense Graded Bitumen Macadam and 30 mm thick Bitumen concrete, PF Thire metall crash barrier and road furniture
Restoration of rain damages on Chharour Nallah to Barogi road Km 0/000 to 7/850 (SH- Construction of Retaining wall with PCC toe wall at RD 1/740 to 1/760).
Sustainability of water sources CO Rain water Harvesting structure at Sawara Baggi in GP Dharchandna in Tehsil kupvi Distt Shimla HP SH Co Check Dam to catch the rain at Tatugad Nallah
Restoration of Road and Channelization of Nallah in ward No 5 near Community Toilet, Baddi Barotiwala Road upto Gugga Madi Backside of Deepak Factory upto the House of Ram Karan Lambardar, Baddi