Loading…
Loading…
8,324 results • Best match
Formation Cutting 5/7 mtr wide road and P/L Kharanja stone soling in Km 0/0 to 0/795
(SH-Campus development and protection of pump house site at Pump house near Chutti Bihali) Job no-2
CO 3 Nos Zinc Aluminium Water Storage Tank of Capacity 50K Ltr. and 1 No Zinc Aluminium Water Storage Tank of Cap. 20K Ltr. at various Nodes
Providing and fixing of Centrifugal pump starter and left out accessories etc
(SH-Campus development and protection of pump house site at Pump house near Chutti Bihali) Job no-1
C/O Retaining wall in wire crate at RD 14/760 to 14/780) PDNA 2023
SH C/O Retaining wall at RD 0/410 to 0/427
SH C/O R/Wall in wire crate at RD 0/108 to 0/118
P/L interlocking paver block at RD 1/260 to 1/370) PDNA 2023
CO 3.00 Mtr span slab type culvert at RD 1/450 including approaches R/walls
(SH- C/o retaining wall with Random Rubble Masonary back side of pump house at Chutti Bihali)
Providing and laying bituminous concrete including profile correction in km 8/0 to 10/0)
SH- Construction of collection chamber 1.50x1.50x3.30 mtrs Ram Water tank 80000 liters capacity at Head woks Pump House standard size at head works sedimentation tank 1 No. Filter bed of 49.98 sqmt. Clear water tank 40000 lit3ers capacity and Over H
SH- Formation Cutting 5/7 Mtr. Wide in km. 0/600 to 1/300
C/O R/wall at RDs 0/960 to 0/970, 7/930 to 9/937, 7/937 to 7/943, 7/943 to 7/951 and parapets at 7/930 to 7/951 and R/wall at RDs 11/525 to 11/540,12/195 to 12/205, 13/365 to 13/370, 13/750 to 13/762 etc.
Formation Cutting 5/7 mtrs wide road in Km 0/705 to 1/000 and Removal of Slips at various Rds in Km 0/015 to 0/705
Construction of Retaining wall at RD. 25/240 to 25/258)
SH C/O R/Wall at RD 0/845 to 0/865 and C/O PCC R/wall at RD 1/270 to 1/282
SH Construction of 6.00 metre span RCC Culvert at RD 0 195 Abutment and Slab
C/o, R/Wall at R.D. 0/352 to 0/369
C/O Retaining wall in wire crate at RD 13/330 to 13/360) PDNA 2023
C/O PCC B/Wall at Rd 0/515 to 0/538.30
Preparation of Detailed project report including working estimate and BOQ for DNIT)
C/O RCC Circular Storage Tank 50,000 Ltr Capacity at Village Lagdhar
C/O Retaining wall in wire crate at RD 14/600 to 14/630) PDNA 2023
SH CO Intake Chamber , STanks , Repair of Pump House and Providing Laying of GMS Tube of various dia
SH Tapp addtional at Kiun by Co RCC Intake Chamber PF barbed wire fencing around the intake chamber and Providing supplying and laying jointing of PPR pipe of 32 mm dia at RD 0 to 650 650 Rmt for village Nadi Naa
(SH- C/o wire cratedBreast wall at RD 0/450 to 0/475,0/475 to 0/500,0/500to 0/525 and interlocking Paver at RD 0/200 to 0/220,0/540 to 0/580 and 0/900 to 0/960).
C/O down stream cut off wall, abutment protection wall and Upstream
Construction of Link road from Nohradhar to Churdhar km. 0/0 to 8/0 (SH C/O 5/7 mtr. wide formation cutting and Passing Places, Retaining structure, C/O Cross drainage works, Road side essential parapets, essential Kharanja stone soling , C/O unlin
Construction of steel Cage wire mesh Staging for PVC Water Storage Tanks, cross Drainage I Road , Dismantling of Gutter and repair of roofs of Banglow No. 1 to 6, Type-IV set 1 to 5 and residential Building Jubbal House at Sanjauli Shimla etc.
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Formation Cutting 5/7 Mtrs wide road , Cross-Drainage and P/L Soling in Km 0/0 to 6/0)
C/O Pucca road along canal from village Doiyonwala to Kheri Km. 0/0 to 2/915 under Mukhya Mantri Sadak Yojna. (SH- C/O retaining walls, C/O causeway, providing cross drainage works and Metalling and Tarring in Km. 0/0 to 2/915)
M/R to DPRA under Lower Summer Hill during 2023-24. SH:- Provision of Heat reflecting carbonate sheet in ARTRAC School roof and raised platform with Granite top and proper drainage facility at front of A-3/11 near Temple at Lower Summer Hill Shimla.
Repair/ restoration of boundary wall form newly acquired area gate to existing boundary wall at DMR Chambaghat Solan (H.P.) (SH: repair of compost tunnel grating, mushroom rack and repair of drainage system at back side of electric sub station at DMR Chambaghat Solan (H.P.)
M/R to DPRA under Lower Summer Hill Shimla during 2025-26. SH:- Cleaning of PVC & RCC water storage tank, cleaning of gutter & cleaning of sewerlines, manholes and drainage & repair of water supply lines and other miscellaneous works at Lower Summer Hill DPRA Colony, Shimla.
C/o School Building & Residential Qtrs. (T-II/04 Nos. T-III/04 Nos. & T-V/01 No.) i/c W/S, SI, Drainage, Development works, boundary wall and Rain Water Harvesting System for Kendriya Vidyalaya Bangana UNA (HP) including internal electrical installation work.
CO RCC Sedimentation tank cum raw water tank 110000 ltr. capacity and replacement of filter media for WSS Nalag at Nalag Nallah
CO RCC Sedimentation tank cum raw water tank 130000 ltr. capacity and replacement of filter media for WSS Sohar at Sergaral Nallah
CO RCC Sedimentation tank cum raw water tank 130000 ltr. capacity and replacement of filter media for WSS Manjkhetar at Dadown Nallah
CO RCC Sedimentation tank cum raw water tank 130000 ltr. capacity and replacement of filter media for WSS Chanol at Dawar Nallah
Restoration of work and sanitation project in cities of C O sewarge network abjoining in area of Bhanu Pul to Shami Nallah
Re alling of HDPE pipe near Haduka Nallah and providing, laying, jointing testing of HDPE pipe of 25mm dia) (NDF/2026/34).
Hiring of Hydraulic Excavator (210 TATA Hitechi) 1.00/1.35 cum. capacity for Channelization of Nallah at Km 4/990) (Job No.2)
Hiring of Hydraulic Excavator (210 TATA Hitechi) 1.00/1.35 cum. capacity for Channelization of Nallah at Km 4/990) (Job No.1)
(SH- C/o road, road side RCC drain and RCC pipe and Culvert).
P/L CC pavement at RD 51/250 to 51/700 and drain
C/O Cement concrete pavement in settled portion 0/690 to 0/810, 0/900 to 0/990 along with 0/945 to 0/975, B/wall at RD 1/850 to 1/895 and R/wall 1/920 to 1/935, 5/00 to 5/015, 4/735 to 4/765 and 4/825 to 4/840 and P/F Crash Barrier at RD 0/780 to
Construction of Balance work of Foot Path from Bus Stand to GSSS Jubbal at Tehsil in Jubbal Distt. Shimla HP SH Construction of Drain in ground ,P/F Fencing and Railing in school ground,Chequerred tile in stair,Roofing in stair landing,painting etc.
Construction of Edge wall at Km. 3/291 to 3/300, Construction of drain at Km. 3/270 to 3/495 and Km. 2/850 to 3/015 and providing and erecting W metal beam crash barrier system in Km. 1/020 to 1/047).