Loading…
Loading…
8,324 results • Best match
RESTORATION OF RAIN DAMGES ON UPPER PRAGPUR TO KAROL VIA DAADRI ROAD KM 2.00TO 3.300 SH C.O U SHAPE DRAIN AT RD 2.590 TO 2.680 2.950 TO 2.995 V SHAPE DRAIN AT RD 2.360 TO 2.470 2.480 TO 2.580 AND 2.760 TO 2.810 AND C.O COUSAE EWAY AT RDX 2.570
R.O.F.D., Construction of retaining walls, metalling and tarring, road side drain, essential parapets, cross drainage works, providing road sign board, Km. stones and 200 mtr. stone, bio- engineering works and routine maintenance in km 11/0to26/0.
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM,Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-705
Formation cutting intermidiate standard, C/o Retaining wall, Cross drainage, P/L GSB, Metalling and tarring, Cement concrete pavement, C/o Road side PCC drain, Parapet, road side furniture etcetra) under Central Road and Infrastructure Fund ( CRIF)
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-701
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM, CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-702
Formation cutting 5/7 mtr. wide, construction of retaining walls, cross drainage works, Parapets, wire crates in dumping sites, essential soling and un-lined surface drain in portion Tihri to Patons Km 2/0 to 16/750
ROFD, R/wall, B/wall, Cross drainage, P/L GSB, WMM, Metaling Tarring, Cement Concrete Pavement, Interlocking tiles, side drain , parapets sign boards in Km. 0/00 to 8/00) Under NABRD XXXI including 5 year maintenace
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/0 to 1/520 includinng five years routine maintenance under PMGSY-IV Batch I
Improvement, passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and road signs etc. including five year routine maintenance of Package No. HP08561, HP08562, HP08563 and HP08564
ROFD, Metalling and Tarring, Retaining wall, Breast wall, cross drainage works, W-metal beam crash barrier, PCC Drain , Road side parapets, Road Marking , logo board and kilometre stone etc. and five year routine maintenance under PMGSY-II
SH Rwall repair of cross drainage structures Cons road side drain parapets Cross barriers panelled concrete pavement Metalling and Tarring and road safety measures etc including Five year routine maintenance under PMGSY-III Batch-I 2022-23
ROFD, R/walls, B/wlls, dumping site, Metalling and Tarring, CD. Works, Drain and Parapets etc.). Under NABARD RIDF XXV.
Restoration of Damaged Washout portion of Drain, Sewage Line and Internal Road along the river at Sapangni Colony Parbati-III Power Station
REPAIR/ MAINTENANCE AND IMPROVEMENT OF E/M INSTALLATION, REPAIR TO DG SETS, PUMP MOTOR AND MES INSTALLATION FENCING AND DRAIN AT PALAMPUR
C/O Drain and Providing CC colour pavers from Gabala Kuan to Kali Mata and different streets in ward no. 5 Nalagarh.
Repair and Maintenance of drain from NH to Block No 21 ward No 30 Kanghandhar (RD 0 0 to 0 300 mtr)
M/T of road and culvert from NH 105 to Gohadev Gaushala, G.P. Joghon. (SH - M/T, drain, culvert, R/wall etc.)
REPAIR TO DRAIN WALLS CULVERTS REPLACEMENT OF FENCING POSTS BARBED WIRE CHAIN LINK FENCING AND OTHER MISC WORKS AT ALHILAL MIL STN
AR MO Housing Colony at Devta Ground BajauraII Distt Kullu HP for the year 202122 SH MetallingTarring of road Co Ushape drain
REPAIR TO DRAIN, RETAINING WALL, SECURITY WALL FENCING AND GRILLS AND OTHER WORK UNDER AGE B/R-I AREA AT YOL CANTT
Construction of V shape drain (SH Providing and Fixing Grating Construction of Retaining wall) in Govind Mohalla in ward No 6 Totu
Restoration of Path / Drain in New Housing Board Colony from house of Dr. Pritam toward Babita Sharma house in ( W. No.-8)
Repair and maintenance of MC drain abutting the Mall road from CTO to Rotary Town Hall in ward No 15 (Phase I)
Providing and fixing water supply pipeline connection, floor drain and Zebra blinds for Environmental Lab at A14.04.13 North Campus of IIT Mandi
Repair and maintenance of drain abutting the Mall road from Rotary Town Hall to Shimla Club in ward No 15 Phase II
Repair and renovation of Drain Line and Courtyard area of Aeroponic Unit I II and III of CIST Division at CPRI Shimla
Restoration of rain damages (SH Removal of slips Construction of road side drain and Construction of edging etc ) in ward No 20
C/o path along with side drain from Modern Nursery Public School towards Suresh Choudhary house in ward No 03 Nagrota Bagwan.
RRD on GadagusainTapnali Ghat road km 0/000 to 21/000 SH Removal of slips and Maintenance of Drain in various RDs
C/o road, road side drain from Main road NH-07 to M/S SBS Industries at Kala Amb Distt. Sirmour (HP).
Widening of Sach Lindi Behi road Km. 0/0 to 2/750 Const. of Retaining walls, Breast walls and V-shape drain
R.R Damages on TJGNK Road KM 0.000 to 52.000 SH C.O B.wall and PCC U-Shape Drain at Km 23.065 to 23.105.
Repair and maintenance of road (interlocking pavers) , Drain near Ram lal ,Baldev and Darshan from under Ward No. 9, Municipal Corporation, Baddi
Construction of road and road side drain from Main road to M.S. Vision Industries at Ind. Area Kala Amb, Distt. Sirmour (HP).
Construction of Training Centre for IPH Employees at Dhangsidhar Distt Mandi HP SH CO Parking Side Drain and Foot Path at Dhangsidhar
Construction Of underground drain with chamber near from the cowshed of Sh. Gurdyal Phase I in W.No. 15 Dohandi MC Mandi H.P.
BSP/2024/468 repair of Community Health Centre at Neether SH P/L paver blocks U-shape drain, painting and distempering etc
Special repair of General Pool residential accommodation at Chamba(SH Providing repair of plinth protection, const of drain and retaining /B/wall)
PROVISION OF CULVERT AND DRAIN NEAR BLDG NO T 47 AT 217 TRANSIT CAMP PALCHAN UNDER AGE I R AND D MANALI
Restoration of rain damages (SH Removal of slips Construction of road side drain and Construction of edging etc ) in ward No 19
Repair and maintenance of path tiles,steps,drain Railing near lohar mohalla,Tang Raj house at railway line, in ward no 2
C/O bridge for Village Kothewala GP Baircha (SH C/O road side drain km 0/0 to 0/300) Under MNP
Construction of U-shape Drain at Divya nagar (SH Construction of C C Path Steel Work etc) in ward No 7 Majiath
Construction of CC road and repair of Paver and Drain near Dr. Praveen gupta house to Raghwanshi house in ward no 9
REPAIR TO DRAIN, RETAINING WALL, PARAPET WALLS, KERB STONES , CULVERTS AND FENCING ETC UNDER AGE B/R-II AREA AT YOL CANTT.
Restoration of Rain Damages on various road under Section Ramshehar Sub Division Ramshehar(Sh Clearance of road side drain in various Km )
AR and MO NMT road km 54675 to 72555 SH CO Ushape drain from km 64900 to 650 and 72405 to 72555
AR and MO on NH 303 Km 0000 to 39000 SH Construction of U Shape Drain in km 7124 to 7164 LHS
FC, R/walls, CD work, GSB, WBM- II, III , Tarring work, C.C Pavement side drain , parapets and road furniture i/c 2 No. 15.25 mtr Span each RCC T- beam bridge Ghurlu Nallah at R.D. 0/200,0/240 i/c five year Routine Mtc) under Nabard RIDF- XXVIII