Loading…
Loading…
8,324 results • Best match
SH ROFD in Km 0/0 to 0/450 including retaining walls at various RDs CD work at RD 0/200 0/255 0/285 V-shape drain at RD 0/0 to 0/450 and chanalization of Nallah along the road Km 0/295 to 0/360
Hiring of J.C.B. for removal of slips,clearing of debris, drains and dressing of berms etecetra.
Hiring of J.C.B. for removal of slips,clearing of debris, drains and dressing of berms etecetra.
Hiring of J.C.B. for removal of slips,clearing of debris, drains and dressing of berms etecetra.)
SH- Hiring of JCB for removal of slips, clearance of drains and dressing of berms etc.).
Repair of Drainage, Sewerage System and Applying of Distempering and Painting Work
SH Improvement of drainage system widening of road at Nadaun Chowk LHS
C/O Head weir at Matyara Khad C/O Collection Chamber C/O Pump House C/O Main Delivery Tank Main Channel of 5010 Rmt C/O Nallah Crossing of 20 Mtrs 1 No C/O Nallah Crossing of 5mtrs 7Nos C/O Protection of Head weir Removal of Debries R/WALL
Restoration of path / Drain from house of Sh. Ramesh towards baggu house and near house of Sh. Vinod and vijay in (W.No3)
(SH- C/O Retaining wall plum concrete 1 5 10 to protection for existing pump house 2nd stage near pump house Prohodhar)
C/o Cement Concrete Check Dam PWHS at Padka Nallah Village Padka near Ward No. 5 in GP -Mehwa in APO unit Dehra
C/O R/wall 0/025 across Nallah , Wire crate R/wall at Rd 0/045 to 0/120 (below Julfi Ram house
Channelization of Nallah from Plot No 84 to Plot No 63 and 2 Nos culverts at Housing Colony at Basal Distt Solan HP
Repair/ Providing of G.I wire Crates in Nallah for protection of De-silting Tank of Gumma Power House damaged during this rainy Season
SH C o Dredging work in Miyar Karpet Nallah at various Rds 160 mtrs Job No 1 from RD 0 to 80 mtrs
C/O RCC Intake Chamber with filter unit at palsed Nallah and Laying jointing and testing of GI pipe 65mm dia 24 Rmt
Formation Cutting ,R/wall ,B/Wall , X Drainage, i/c Wing wall , V-shape Drain ,Sign boards and Parapets, Box , Slab Culvert , M/T Work at Rd 0/00 to 14/000).(Under CRIF -HP-2024-25/194
F/C 5/7 mtr. Wide,R/walls, breast walls, Meetalling Tarring, Cross drainage, V-shape drain, Parapets, Dumping site, Stone in Km. 0/00 to 4/515) (RIDF-XXIX) (UNDER NABARD) (Including 5 years of routine maintenance)
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
Formation cutting Passing places, Retaining walls Cross drainage works, GSB,WBM G-II WBM G-III Tarring work, Interlocking Paver Block Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH Removal of formation deficiencies, C.O Retaining wall, C.O Breast wall, C.O Cross drainage, providing and laying GSB, Providing and laying WBM G.II and G.III, Mix seal surfacing, V.shape drain, essential parapets and providing and fixing sign boar
ROFD wire crates/Gabion walls C/o R/wall P/L Granular Sub Base (GSB) CC pavement parapets crash barriers system V-shape and U-shape drain cross drainage structures including five year routine maintenance after completion work
Development of Industrial Plots at Sansiwala i.e. Road ic metalling and tarring, parking with interlocking tiles, CO U shape drain and x- drainage, green space, external water supply and external sewerage system ic 100 KLD sewerage treatment Plant)
Construction of retaining walls, breast walls, metalling and tarring, cross drainage works, road side drain, parapets, providing road sign board, Km. stones and 200 mtr. stones, Bio Engineering works and five years routine maintenance P.No. HP-08-488
Improvement, Passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and Road signs etc. including five year routine maint. of Package No. HP08566 HP08567 HP08568 HP-08569 HP089999.
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
Construction of 19.75 mtr. effective span RCC T-Beam motorable bridge including approaches at RD. 7/200
Prov laying and jointing of rising main 50mm dia Supply and errection of pumping machinery with allied accessories
(SH-F/C 5/7mtr wide road at RD 0/180 to 1/150)
(SH- Providing laying of rising main and thrust Block)( Balance) work
Providing and fixing Aluminium partition Door Window etc Lab at Motipur
Providing wood work, rooofing protection work, distempering ,painting and sanitary installation etc.
SH C/O B/Wall at RD 3/990 to 4/020 and 4/070 to 4/115
SH formation cutting at RD 0/150 to 1/860 and wire crate in retaining wall at RD 0/220 to 0/240 and 1/660 to 1/670
C/O of R/Wall.
Demolition of Old Complaint Cell at Motipur Development of Site of Lab Construction of Lab Physical Chemical Bacteriological Lab at Motipur Mandi Distt Mandi HP
SH Flushing of bore well
SH C/o B/wall at various Rds. 3/620 to 3/645, 3/700 to 3/725,3/965 to 3/985, 4/480 to 4/538 and R Edge wall at RD. 4/480 to 4/538)
Formation Cutting 5/7 mtrs wide road in Km 0/000 to 0/255
SH- Construction of R-wall at Rd 26-240 to 26/255
L-J GI pipe of 15 mm dia andmaking connection with Chamber in habitations of GP Gharyana, Juni, Mandhorghat and Reog
(SH- P/L Kharanja stone soling at RD 0/0 to 1/0)
SH- C/o B/wall in wire crate from 29/800 to 29/874.60
Balance work of 8.00 metre span RCC slab culvert at RD 1/765).
(SH Providing and Laying Wearing Coat Grading -II 63-45 mm size in Km. 2/960 to 3/850).
SH- Cutting in KM 0/525 to 1/00.
L-J GI pipe of 15 mm dia and making connection with Chamber in habitations of GP Basantpur and Shakrori
Similarly work
Construction of Retaining wall at Rd 21/650 to 21/631