Loading…
Loading…
8,324 results • Best match
RR Damages to RCD road km 000 to 92695 SH Hiring of JCB removal of slip dressing of shoulder surface and drain etc
RRD on Kelodhdar Chhatri Nagan road km 19/000 to 41/000 SH Removal of slips and Maintenance of drain in various RDs
Providing Paver work on Baloo to Pucca Tala Hospital road Km. 0/0 to 0/560 (SH P/L Paver work Drain Parapets)
C/O Drain and R/O Path near H/O Chandels and Chawalas upto H/O Smt. Anita Devi in Ward No. 9
Repair and Restoration of Path along with drain from Una Nangal road culvert and towards moh. Govind nagar ward no. 3 MC Una.
Construction of 100 beds Girls Hostel at Saroo (SH Construction of Retaining walls, U-shape drain, Boundary wall ,laying of interlocking paver etc
Widening of path/road by providing drain cover from Sh, Jaissi Ram House towards Main road Ward No 01 Jawalamukhi Distt. Kangra H.P.
Beautification of road from Chail Chowk to Ganesh Chowk (SH- C/O Drain and Pavar Blocks at RD 0/700 to 1/200).
C/o Old Bazzar Road Pavement with C.C. Paver and side Drain from Radha Kirashan Mandir towards Gaytri Mandir in ward No. 4
Restoration of rain damages on Bharolian Badehar Charatgarh road km.0.0 to 4.200 (SH C.O U-shape drain at RD.1.250 to 1.300)
C/o steps , drain and steel railing near h/o Sudesh , Ashok Chopra and others beside SBI Bank in W.no. 03 MC Palampur
RR Damages to RCD road km 00 to 92695 SH Hiring of JCB removal of slip dressing of shoulder surface and drain etc
M C path from Adda Villa Curve to Kashyap Niwas in ward No 4 (SH Construction of V shape drain E wall etc)
Restoration rain damages on Various roads under Habban Section (SH Removal of slips/Debris,Maintenance of earthen shoulder and clearance of side drain ).
Restoration rain damages on Various roads under Dhamander Section (SH Removal of slips/Debris,Maintenance of earthen shoulder and clearance of side drain ).
Restoration rain damages on Various roads under Deedag Section (SH Removal of slips/Debris,Maintenance of earthen shoulder and clearance of side drain ).
Restoration rain damages on Various roads under Chandol Section (SH Removal of slips/Debris,Maintenance of earthen shoulder and clearance of side drain ).
Restoration rain damages on Various roads under Fagu Section (SH Removal of slips/ Debris,Maintenance of earthen shoulder and clearance of side drain ).
R R Damage Range office Bashla to Khanori B Wall 0 640 0 760 and unlined surface drain 0 00 to 1 500
Restoration rain damages on Various roads under Kheri Section (SH Removal of slips/Debris,Maintenance of earthen shoulder and clearance of side drain ).
Restoration of rain damages on NMT to Saluri road Km 000 to 2500 SH Const of Ushape drain between RD 0250 to 0650
A/R & M/O to Phagli Club Shimla during 2023-24. SH:- Repair of entrance portion and drain at Phagli Club, Shimla (H.P.).
C/o of Check walls at Sarwari Nala in Bhutti Range of Kullu Forest Division, Kullu (HP)
Construction of W.H.S CC (Jal Bhadaran) in G.P. Patta Nali Under APO unit Dharmpur
A/R & M/O to Grand Hotel Shimla dg. 2026-27. SH:- Cleaning of overhead Steel, PVC & RCC water storage tank, cleaning of Gutters & cleaning of sewerlines, manholes and drainage and repair of water supply lines and other miscellaneous works at Grand ... and drainage and ...
RESTORATION OF RIAN DAMGHEES ON GULER TO DHANGAR ROAD KM 0.0 TO 5.360 IN DISTT KANGRA H.P SH C.O ROAD SIDE V SHAPE DRAIN AT RD 2.200 TO 2.500 AND 3.050 TO 3.250 AND U SHAPE DRAIN AT 4.425 TO 4.540 AND C.C PAVEMENT AT RD 2.110 TO 2.150 AND 4.155 TO
C/o road from SC basti uperli Bhud to Morepin factory. (RD 0/00 to 0/500) (SH- tiled road and drain), C/o road from the house of Nand lal to Gujjar basti in village khas khol. (RD 0/00 to 1/00) (SH- Retaining wall, drain, tiled road and slab culvert
Construction of woodrina Shishu Kendra road km. 0/00 to 1/300 (SH C/O V shape drain km. 0/00 to 1/00, Ushape drain km. 1/00 to 1/300 grating and CC parvemnt b/w RD 0/980 to 1/045 b/w km. 0/00 to 1/300
Cleaning of Hurla and Pancha Trench weir, intake structure , collection chamber, Silt Flushing tunnel, gate grooves, Approch Tunnel, Feeder Tunnel and other associated structure of Parbati-H.E. Project, (Stage-II), (Package No-C-747)
C/O formation cutting 5/7mtr. Wide, cross drainage works, WBM G-I, G-II, G-III, 2cm. Thick premix carpet, road side V-shape drain and parapets in km. 0/0 to 1/735.)Under NABARD RIDF-XXVI
Construction of formation cutting, retaining walls breast walls, metalling tarring, catch water drain, bituminous works, cross drainage structures, parapets, dumping site, stone sign boards in RD 0/00 to 4/436)(RIDF-XXIX) (Under NABARD) (i/c 5 years
C/o 5/7mtr Formation cutting,Passing places, R/walls, , Cross drainage works, P/L GSB, Wet Mix Macadam, Tarring work, Interlocking Paver, Road side drain and Parapets in Km 0/0 to 2/115). (Under NABARD RIDF-XXVIII).
Removal of formation deficiencies, C/o Retaining walls, Breast walls, wire crates, Providing and laying Metalling and Tarring, C/o road side drain, C/o road side parapets, C/o Cross-drainage works,providing and fixing road safetymeasures, maintenance
C/O R/wall and breast wall, cross drainage works, granular sub- base GSB, WBM Base course G-II, G-III, premix carpet with seal coat, c/o road side drain, parapets in Km 0/0 to 5/0
Construction of 30 mtrs. Box Girder Bridge, Formation cutting, Passing Places, C/o Protection work, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, Interlocking Paver Block, Tarring work, Side drain, Parapets and road Furniture). (Unde
Providing Metalling tarring removal of formation deficiencies, C O PCC R Wall and B/Wall, C/O Missing cross drainage works, PCC road side drain , parapets Kilometre stone and C O road side edging including 5 year annual maintenance
Removal of formation deficiencies , C/O Retaining /Breast Walls, Cross Drainage works, P/L sub base WBM-I, M/T, Road side drain and road side essential parapets in km 0/0 to 18/390) under NABARD RIDF -XXV
Formation cutting, PCC Retaining walls, Created Breast wall, Cross drainage works, Side drain, Parapets, road sign boards and Metalling and Tarring) under PMGSY, (World Bank-RRP-II) Batch-II for the year 2018-2019 Package No. HP-02-347
CERTAIN REPAIR TO DRAIN, FENCING, GATE, RETAINING WALL, COMPOUND WALL, TOE WALL AND OTHER ALLIED WORKS IN THE UNITS OF AVERIPATTI, MATIANA, NARKANDA AND JHAKRI UNDER GE 863 EWS
Hiring of JCB for removal of slips, clearance of drains and dressing of berms etc.) (Leda Section).
Hiring of J.C.B for removal of slips, clearing of debris, drains, dressing of berms etc)(Majhwar Section)
Hiring of Tipper for removal of slips, clearance of drains and dressing of berms etc.) (Leda Section).
REPAIR, REPLACEMENT, CLEANING OF SEWAGE LINES, SEPTIC TANKS, SOAKAGE WELLS, MANHOLES AND DRAINS UNDER AGE(I) DALHOUSIE
Hiring of J.C.B for removal of slips, clearing of debris, drains, dressing of berms etc.) Job-II
Hiring of J.C.B for removal of slips, clearing of debris, drains, dressing of berms etc.) Job-I
Hiring of J.C.B for removal of slips, clearing of debris, drains, dressing of berms etc.) Job-I
Hiring of J.C.B for removal of slips, clearing of debris, drains, dressing of berms etc.) Job-II
Hiring of JCB for removal of slips, clearance of drains and dressing of berms etc.). (Sardhwar Section)
Hiring of JCB for removal of slips, clearance of drains and dressing of berms etc.). (Rewalsar Section).
Hiring of JCB for removal of slips, clearance of drains and dressing of berms etc.). (Sardhwar Section).