Loading…
Loading…
33,106 results • Best match
Replace demolished drainage line by new drainage line at backlane of rupesh yadav nagar from house no. 1 to 18 and 51 to 62 under ward 45 of zone 9. FOURTH CALL
Regarding laying a new drainage line in place of the damaged drainage line behind Road No. 17 and around Mata Mandir in Samajwadi Indira Nagar, under Zone No. 15, Ward No. 71.
Laying a new drainage line in place of the damaged drainage line on the main road from Amta Tur to Imli in Jalla Colony, located in Zone No. 19, Ward No. 38.
Laying a new drainage line in place of the old and damaged drainage line from M. No. 380 to 366 near Gumashta Nagar Jhulelal Temple under Zone No. 15, Ward No. 83.
Providing and new laying drainage line in place of demolished drainage line in champabagh areas street and daulatganj area from daulatganj sulabh complex to urdu maidan under ward 60 of zone 11.
Replacing demolished drainage line by new drainage line in bhagwandeennagar from house no. 147 to 168 and and from house number 56 to 67 under ward 63 of zone 18. SECOND CALL
In Chhoti Kumhar Khadi under Zone No. 01, Ward No. 10, replace the damaged back alley drainage line of Manju Bai, Mangal Sen, Dr. Sahab, and Hariom with a new drainage line.
Laying a new drainage line in place of the damaged drainage line from Anurag Yadavs house to Naina Mata Temple in Dev Nagar, under Zone No. 09, Ward No. 45. (Second Call)
Replace demolished drainage line by new drainage line at nanadan nagar located house no 10 C to 30 C jeevan kirana and behind ganesh dharamshala karkhana under ward 03 of zone 16
Laying a new drainage line in place of the damaged drainage line from Riddhi Siddhi Apartment to Shivdham Apartment on Race Course Road under Zone No. 09 Ward No. 47. (Second Call)
Laying a new drainage line in place of the damaged drainage line from House No. 05 to House No. 16 in Laad Colony, under Zone No. 09, Ward No. 47. (SECOND CALL)
Provide and laying drainage line in usha nagar extention located sethiya udhyan in front of sethiya udhyan house no 680 to naredra tiwari marg at zone 15 ward 71. Second Call
WARD 12 ME BHAPAJI BALI GALI MAI NALI OR CC ROAD
Provide and laying 300 mm dia drainage line in backline of prakash petrol pump located piplyarao village at zone 13 ward 74.
Laying a drainage line from behind the zone, starting at Hanuman Temple to the drain in Firdos Nagar, and up to Salim Kirana in Kuen Wali Gali, Prem Nagar, under Zone No. 18, Ward No. 52. (Second call)
Construction work of RCC U-Shape Nala from Pramod Shrivastava s house, passing through Govindhari Garden, up to the front of Sanjeev Richhariya s house, and from Sanjeev s house to the main bada nala in Ward No. 06. Indergarh
Construction of 02 nos. Pump house shed each one at either side (EAST and WEST) of existing STP and construction of a small RR masonry bund on nala near STP along with rectification work in existing spillway across nala near STP
CONSTRUCTION OF RCC NALA AT WARD NO 14 MOHANKHEDA GATE TO DALPURA NALA, WARD NO 04 TEJAJI MANDIR TO TRENCHING GROUND CORNER AND CONSTRUCTION OF 04 NOS HUME PIPE CULVERT AT WARD NO 04,05 AND 12 UNDER SDRF SCHEME AT RAJGADH
Construction of CC Road and Nali Ward No 29 Shareef Chacha Ki Badi Dwarika Prasad Shrivastava to Udayraj Gwal house under NP Guna
Const of CC Road and Nali Ward No 06 Ganesh Gwal to Anis house Sudha Sager Global Colony under NP Guna Third Call
Ward 44 Lohari ka pura me cc road and u shep nali and u shep nala nirman work.
Ward 33 Me Nala number 01 se conncet galiyo me khudai karke cc road and nali nirman work.
Ward 07 Pandav mohalla wali gali me cc road, nala nali nirman work. kayakalp 2.0 ke antargat prastavit.
ward 14 nala no1 rathor colony se conn gali me wbm road evam u shape nali nirman work.
ward 25 uttampura underbridge se bhajju dandotiya ki bagiya tak u shape nala u shape nali nirman work
WARD NO 28 SAKUR SATTAR COLONY ME GABU LINEMAN KE MAKAN SE KATIYA SAMAJ SAMUDAIYK BHAWAN ROAD EVAM NALI NIRMAN KARY
CONSTRUCTION OF RCC DRAIN FROM DHANI RAM JHUGGI TO ASHOK JHUGGI, CC ROAD FROM RAMPRASAD TO RAVI BAMAN JHUGGI, AND NEAR DEVKINANDAN JHUGGI, RCC DRAIN NEAR MEENA BAI JHUGGI,CC ROAD FROM BRIJLAL TO KOMAL JHUGGI 60QUARTER JHUGGI BASTI,CC ROAD NEAR LAXMI
CONST. OF DRAIN AND ROADCROSS VISHRAM GHAT TO HAMUMAN MANDIR BARKHEDA PATHANI,CHHATAR UMRE TO BARKHEDA PATHANI MAIN ROAD AND CONST. OF C.C ROAD AND DRAIN NEAR MASJID WALI GALI BARKHEDA PATHANI AND CONST. OF C.C ROAD FROM BARKHEDA PATHANI CHAURAHA TO
Construction of C.C. Road at P.W.D. Rest House Main Road to Baniya Colony Approach Road, Beside of Rotary Park to S.P. Bungalow Sidhi and Construction of R.C.C. Covered Drain from southern side of the Main Road from Fatte Singh Road to Hiran Nala....
Construction of RCC Drain at Ward 09 (1) Chirganiya House to Dilip Mukaddam House (2) Friends Church House to Main Nala (3) Rakesh Maseh House to Church Gate (4) Ward 04 From Sardar Patel School to Chote Yadav and Ranjeet Singh.(SECOND CALL)
In Ward no. 09 RCC Nala (from Upadhyay house to Ramnagar Bamba) and C.C. Road and C.C. Drain construction work, work from Upadhyay house to Sonu Bhadoria Puttu Singh to Pawan Shrivas, Bhav Singh to Ramnarayan, Abhilash Tomar to Upadhyay house, Swatan
CONSTRUCTION OF RCC DRAIN AT WARD NO 29 ASHOKE SOLANKI TO BADA NALA AND MAHILA ASHARAM TO GHANSYAM CHODHRY AND KALKA MANDIR SAI MANDIR HARIPAL HOUSE AND PANKAJ TO BANTI HOUSE AND VISHAL MEDIKAL TO DINESH AHUJA HOUSE MUNICIPAL COUNCIL NARMADAPURAM MP
Construction Of Retaining Wall toe wall with dry stone pitching work at Drain Behind Maharana Pratap Garden Mahakal Vanijya Kendra C Sector Ward 51
CONST. OF CC DRAIN IN A SECTOR MAIN ROAD ASHOKA GARDEN W 69 Z 12
Construction of PCC Drain at ward no 02 From HO Shivam Dwivedi to Loknath Dwivedi
CONS. OF DRAIN FROM HOUSE OF TULAN GUPTA TO RANA PATEROL PUMA AT WARD 01
Construction of RCC Drain at ward no 5 Near HO Ramua prajapati to Public Toilet
Construction of PCC Drain at ward no 6 From HO Kashi Kahar to Sanskrit School
To raise main hole of drainage line according to necessity in ravi nagar and shanty nagar various places at zone 10 ward 43. SECOND CALL
Construction of C.C Road From Dhankot Keer to Mahudia Khal Nala Road Length 2.50 Km
CERTAIN MISC REPAIR TO SEWAGE LINE, MANHOLES, SEPTIC TANK, DRAINS, INCLUDING CLEAING OF SEWAGE LINE, DESILTING OF DRAINS, HARDSTANDING, PAVER BLOCK, FENCING, COMPOUND WALL, GATES AND OTHER MISC WORK AT OTM AND MD ACCN JCOS/ORS, HEMA LINE, THIMMAYA LI
CLEANING OF DRAIN IN BIRKHADI FROM BHIND BHANDER ROAD TO TALAB TO NODA ROAD VIA BAGHEL MOHALLA J.C.B PER HOUR TRACTOR AND TROLLY PER DAY
Construction of Drain reconstruction 250 Rmt and Drain Cover in 900 Rmt at Central Semen Station, Bhopal
CONSTRUCTION OF DRAIN UNDER SDMF HEAD (1) CONSTRUCTION OF RCC DRAIN FROM LAHAR TIRAHA TO BARAH ROAD
Construction of Pipli Naka Earthen Dam (Without Canal) across Local Nalla near village Charpotipada, Tehsil Thandla, Distt. Jhabua (M.P.) On Turnkey basis for least gross storage capacity of 1.01 MCUM water and 180 Irrigation in Hact. area.
CONSTRUCTION OF R.C.C DRAIN BEHIND OF SURAJ PRIMER SCHOOL TO RAMESH SONIYA HOUSE SHIV NAGAR PHASE 01 W-73 Z-16
Water Supply, Sanitary, Drainage, Painting, Electrification work and Other Renovation work at GNM Training Centre District Barwani
Construction of Drain and C C Chamber Work at Majeed Bhai H O to Mohd Sajeed H O Noor Mahal Paiga Gali No 01and Shahid Bhai Battry Wale to Rafikiya School Choki Imambada and Vishnu Prasad to Thanwar Bsati Choki Imambada and Trade India Choki Imambada
ZONE-01, WARD-05, RENEWAL OF CC ROAD AND CONSTRUCTION OF DRAIN COVER- FROM GUDDA KIRANA STORE TO PRADEEP AGNIHOTRI JI HOUSE, FROM RAJ DWIVEDI JI HOUSE TO ANIL DWIVEDI JI HOUSE, GANESH AATA CHAKKI VIA KUNWAR SINGH PATEL JI HOUSE TO RAJJE DWIVEDI JI HO
CONSTRUCTION OF DRAIN AT CIVIL WARD 05 FROM BAJPAI JI TO RAM MANDIR AND BAJPAI JI HOUSE TO VIKRAM THAKUR HOUSE AND CONSTRUCTION OF CC ROAD FROM BAJPAI JI TO RAM MANDIR AND LAYING OF PAVER BLOCK AT C5 ALISHAAN TO DILEEP JOSHI VIA DURGESH PATEL