Loading…
Loading…
146 live74 closing this weekmost from Municipal Bodies and CE,Minor Irrigation,BBSR
146 results • Best match
Repair of Road and Drain from Pradhan Office to Patra Sahi in Ward No.10 of NAC Balliguda
Construction of road and drain from Ranjan Sahu house to football field Bagdiapada ward no-28 under SMC Sambalpur
Repair of Road,Drain and Cover Slab from Electric Sahi link Road in Ward No.9 of NAC Balliguda
Construction of Paver Road and drain from Kanhei mohalik house to Chita house (via Rabindra pradhan) in Ward No.-3
Construction of CC Drain from Azam Ali Khan House to Gatur Ahamad Khan House (Barik Sahi) in Ward No.-8
Construction of Approach RCC Road with RCC Drain for the newly constructed CHC Building ward No-10 at Balimela NAC
Construction of road drain from R and B road to Binod Bihari Panda house Bagdiapada ward no-28 under SMC Sambalpur.
Repair of Road and Drain with Cover Slab from Sunapanga Main Road to Peonpada in Ward No.13 of NAC Balliguda
Repair of drain with Cover Slab from Debadas Panda house to Panaspodi UP School in Ward No.11 of NAC Balliguda
Construction of Road and drain with Cover Slab from Mahamayee Mandir to Old AWC in Ward No.12 of NAC Balliguda
REPAIRS TO PLUMBING JOINERY FLOORING MANHOLE DRAIN CONCERTINA COIL AND MISC WORKS AT DHQ 7 CGRA AND NEW TRADE CENTRE AT PARADIP
Const. of Drain with Culvert from Pravakar Das House to R.D Road Via Prahallad Das at Mishrasahi (Tundapada) in Ward No. 16
Construction of road and Drain from NH 16 to Kali Mandira Road and at Nuasahi Raghunath Temple Road in ward no. 37
Construction of Paver Block Road with Drain from Parikhata Behera house to Bauribandhu Behera house at Biswal Sahi in Ward No.06
Construction of Paver Block Road with Drain from Biswambar Behera house to Arun Behera house at Biswal Sahi in Ward No.06
Construction of Road and Improvement of Drain with Cover Slab from Sonu Dandasena House towards Sesharam Majhi House W No 12 NAC Nuapada
Repairing of concete road Samachuan village, Narikata village, Bhadra Nuabasti and construction of road side drain of Badmal village under CSR 2026-27
Construction of Settling Pond and De-silting of existing Pond, Garland drain, Check dam at Kodingamali Bauxite Mines in the district of Koraput
Construction of Paver Block Road with Drain from Kainchapur Sahi Chowk to Phulatola Yubak Sangha house at Biswal Sahi in Ward No.06
Construction of road and drain from Jay nagar R and B main road to Jayjit Sahoo house Bagdiapada ward no- 28 under SMC Sambalpur.
S/R to SH-48 to Patharchakada road Such as overlaying of CC pavement and CC drain with cover slab for the year 2026-27
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor's own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification, Provision of 1X25 kV Conventional Type OHE, Tunnel OHE with ROCS, Tunnel lighting, TSS, SP, General Power Supply Arrangements Modifications/Conversion to Underground for Overhead electrical HT/LT Power line Crossings etc on EPC Basis in Waltair Division of East Coast Railway.
Construction of Paver road and drain from R and B road to Pramod Jagdala house and Rajkumar Nanda house, Bagdiapada ward no-28 under SMC Sambalpur.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Construction of paver road and drain from R and B road to Ugrasen Mahananda house via Hanuman Temple and Jagdish Bibhar house, Baghdiapada ward no-28 under SMC Sambalpur
Repair of Road and drain from Ujhha house towards NH PWD Gate, Medical Front , Kalimandira Road and other inside Road repair , Word No--10 of NAC, Balliguda, Dist Kandhamal
Street Sweeping, Drain De-silting, Bush Uprooting, De-weeding, Conservancy Cleaning, Door-to-Door Waste Collection (Both Household and Commercial) with Transportation, and Municipal Waste Collection and Transportation in SMC
Construction of road and drain back side of Gajalaxmi Vending zone, renovation of road at back side of ISKCON temple and Repairing of main road at Behera Basti in Ward No. 25
Improvement to Adhal-I Check Dam in Banspal Block of Kendujhar District under Improvement to Check Dam Scheme for the year 2026-2027
Improvement to Adhal-I Check Dam in Banspal Block of Kendujhar District under Improvement to Check Dam Scheme for the year 2026-2027
STREET SWEEPING DRAIN DE-SILTING, BUSH UPROOTING, DE-WEEDING, CONSERVANCY CLEANING, DOOR-TO-DOOR WASTE COLLECTION AND TRANSPORTATION OF MUNICIPAL SOLID WASTE (BOTH HOUSEHOLD AND COMMERCIAL), AND MUNICIPAL WASTE COLLECTION AND TRANSPORTATION (ZONE-3)
STREET SWEEPING DRAIN DE-SILTING, BUSH UPROOTING, DE-WEEDING, CONSERVANCY CLEANING, DOOR-TO-DOOR WASTE COLLECTION AND TRANSPORTATION OF MUNICIPAL SOLID WASTE (BOTH HOUSEHOLD AND COMMERCIAL) AND MUNICIPAL WASTE COLLECTION AND TRANSPORTATION FOR ZONE-2
Construction of Kitchen-cum-Dining Hall and Security Cabin and Waiting Lounge, parapet wall over Kitchen-cum-Dining Hall and Security Cabin and Waiting Lounge open stage and masonary drain in the premises of OAV, Jharmunda.
Road safety and maintenance works Bombay Chowk Km 214 800 to Km 215 250 and transformer at Km 209 800 Km 217 500 in NH 49 drain construction at km 296 200 of NH 49 and laying of Hume pipe at Km 35 400 in NH 18 in the state of Odisha 2nd call
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side ... Side Drains , ... Water Drains , ...
Resectioning D/Sslope of Rt.Dyke,Impvt.to Dam top D/S Dwarf wall,long.and Trs.drain on Dam slope,Restoration to toe drain,Impvt.to Rt Dyke Dam top road,Const.of DG shed including colour washing to Spillway,Parapet,dwarf wall of Derjang Dam underDPIW.
as per schedule of item
Earthwork in formation, Construction of Major Minor Bridges, retaining wall, Drains, Supply of ballast, P. Way Materials Track linking works, Construction of building and allied works from Ch 9/190 Km TakeOff to Ch 15/342 Km DE in connection
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to ... Side Drains , ... Water Drains , ...
Execution of Earthwork in formation, Minor bridges, Major Bridges, Station Buildings, Service Buildings, P-way linking work, Ballast supply, Platform work , PF shelter, drain work, camping facilities, protection works, Tunnel between Ch: 116.205 km to Ch: 116.415 km, and other allied works between Barkote(Ex) (Ch: 98.325 km) - Mahuldiha(Ex) (Ch: 117.525 km) including Ambagaon yard in connection with Talcher - Bimalagarh New BG Rail Link Project.
BRAKE VALVE PART NUMBER TB66043, PROPELLER SHAFT REAR PART NUMBER TD66135, VALVE PILOT PART NUMBER YA00054329, FILTER PART NUMBER 2655742461, PLUG DRAIN PART NUMBER 263G750061, INJECTOR, DOSER PART NUMBER TE68615, LUBE OIL FILTER PART NUMBER TE66283, CRANKCASE BREATHER FILTER ELEMENT PART NUMBER TE66716, FUEL FILTER SPIN ON TYPE FF91217 PART NUMBER TE18980, FUEL WATER SEPARATOR CARTRIDGE PART NUMBER TE16975, STRAINER PART NUMBER TD66503, AIR FILTER, PRIMARY PART NUMBER TD66470, ELEMENT FILTER PART NUMBER YA00033065, ELEMENT PART NUMBER 4251527, FILTER PART NUMBER YA00001490, AIR FILTER,SAFETY PART NUMBER TD66471, FILTER TRANs PART NUMBER 0501333764, BREATHER AIR PART NUMBER 2631543371, BOLT PART NUMBER 5643051061, WASHER PART NUMBER 5660051471, BREATHER AIR PART NUMBER 1632302242, BREATHER AIR PART NUMBER 263G782251, BREATHER PART NUMBER TD08056, ALTERNATOR PART NUMBER TB70500346, MOTOR STARTING PART NUMBER TB70500357, TENSIONER, BELT PART NUMBER TB70500173, PULLEY IDLER PART NUMBER TB70500176, MOTOR PART NUMBER XB00001059, EVAPORATOR PART NUMBER XB00001044, HOSE COOLER PART NUMBER YA00005532, HOSE COOLER PART NUMBER 4281507, THERMO SENSOR PART NUMBER XB00001052, THERMO SENSOR PART NUMBER XB00001061, SWITCH START PART NUMBER 4448303, BUZZER PART NUMBER 4637647, SWITCH PART NUMBER YA00004499, RELAY PART NUMBER 4436534XXXT3, RELAY PART NUMBER XB00001063, SWITCH PART NUMBER YA00004496, BEACON LAMP 24V PART NUMBER TD60502, VALVE PART NUMBER XB00001045, PUMP PART NUMBER TD66234, SEAL DUST PART NUMBER TE66234, SEAL DUST PART NUMBER TE66232, SEAL DUST PART NUMBER TE66233, O RING PART NUMBER 2668872061, REPAIR KIT PART NUMBER TE68296, PUMP ELEMENT PART NUMBER TE17269