Loading…
Loading…
1,729 results • Best match
Construction of U drain in RC.21 road from Nettapakkam Singakattai to Primary Health Centre and in RC.19 road from TVS Company to Ural Voikkal in Nettapakkam Commune, Puducherry
Formation of 5th cross road extension in Thoppu theru and Construction of culvert and earthern drain on the southern side of school compound wall in P.S.Palayam village in Mannadipet Constituency
Construction of RCC drain in the left out portion of Oulgaret Pallavoikal along the Northern side of Pitchaveerampet Road from Muthirapalayam road junction near NH-45A road in Moolakulam, Puducherry.
Desilting the U drain on both side of M.G.Road from Subbiah Salai to Ezhaimariamman Koil Junction and Anna Salai, Ambour Salai and S.V. Patel salai at Puducherry before 2022 monsoon
Package 7. Sub-work 1. Construction of PCC drain for Olandai surplus course staring from downstream of railway culvert P.97 to upstream of ECR culvert near Marapalam junction, Puducherry.
Providing cross drain with cover slab near Nonankuppam road main entrance, Opposite to Thamaraikulam and near new colony along the Nonankuppam main road in Manavely Constituency in Ariyankuppam Commune, Puducherry.
Package.15. Sub Work.3. Raising the Iyyanar Koil drain wall and cover slab including easing the approach roads between Arunthathy Puram and Raja Nagar at Nellithope, Puducherry- V Call.
Improvements to the internal roads in Vengateswara Nagar, Mahalakshmi Nagar and Ethiraj Nagar including Construction of L Drain at Madagadipet and Madagadipet Palayam Village in Mannadipet Commune, Puducherry II Call
Providing SS Grills for barricading to the Kabadi Court and drainage improvements in the SAI Sports Hostel in Yanam
Providing and laying of CC roads and drains in Sarada Gayathri Nagar and Ramana Maharshi Nagar opposite to Electrical Sub-Station at Mettacuru, Yanam
Reconstruction of L drain and Improvements to the link road branching from RC.33 road run towards south to connect the Pidari Amman koil road in Kuruvinatham village, Bahour Commune, Puducherry
Construction of U drain on Dr. Ambedkar Salai eastern side from the junction of Port link road to Grand Canal through port campus at main entrance location of New Port, Puducherry.
Reconstruction of Damaged drain at Nadu Mathagu Voikkal from Kanagan Eri to Rathna Nagar main road culvert upstream side Ch.250 to Ch.375m upto Ganapathy Nagar 1st Street in Puducherry.
Providing U drain in the Kirumampakkam Chinna eri supply channel along the ECR road from Mahatma Gandhi Hospital to MLA office from Ch.0m to Ch.470m in Bahour Commune, Puducherry.
Construction of PCC drain with cover slab along branch supply channel of 3rd sluice of the Murungapakkam tank at upstream of the Sivaji Street, Sudhana Nagar extension, Nainarmandapam, Mudaliarpet Constituency, Puducherry.
Reconstruction of damaged drain at Nadu Mathaguvoikkal from Ganapathy Nagar 1st Street to Rathna Nagar main road culvert upstream side from Ch.375m to Ch.500m near Patrick School in Puducherry.
Construction of septic tank for ladies toilet and U drain in Administrative block including face lifting and restoration work to the auto trade work shop at Govt. ITI Men T.R.Pattinam, Karaikal.
Desilting and Cleaning of Shanmugapuram drain from Zero point near Guru Nagar to Annakarai road shutter (Ch 0.00mts to Ch.2250.00mts) at Kathirkamam Constituency in Puducherry for the year 2026-27.
Construction of OTM Accommodation & GCOM for Coast Guard at 1.24 acres Coast Guard land at Puducherry. SH: Providing storm water Ductile iron Drain covers in road crossing and other miscellaneous work.
Construction of RCC protection wall with drain arrangement along the eastern side of newly constructed Masimagam GHAT on the right bank of river Sankaraparani at Thirukanji Revenue village, Villianur Commune, Puducherry.
Road work
Reconstruction of damaged drain at Nadu Mathaguvoikkal from Kanagan Eri to Rathna Nagar Main Road culvert upstream side (from Ch.125m to Ch.250m behind Pavazhakaranchavady burial Yard) in Puducherry - (II Call).
Improvements to the road works in Sivaji Street, Thirunavukarasar street at Sudhana Nagar and Thennansalai road southern side Nainarmandabam and construction of U Drain at Thennansalai road southern side Nainarmandabam, Mudaliarpet, Puducherry
Providing cement concrete pavement L drain and precast slab in the left out portion of Mathur road from Ch.0 000 to Ch.0 340 at Periya Kalapet in Kalapet Constituency, Puducherry
Improvements to the road and drain to the left out roads at Vanathu Nagar, Cross streets connecting NH45A and Morizanthottam road and Balaji Nagar near Srinivasa apartment at Moolakulam in Oulgaret Constituency
Construction of PCC drain at Olandai tank 1st sluice supply channel from branch channel at Jayamurthi Raja Nagar to in-fall at Olandai surplus course at Jothi Nagar in Mudaliarpet Constituency, Puducherry.
Improvements to the various road junction culverts at VOC street and Gandhi street in Kadirkamam and repairs to U drain at Tagore street Kadirkamam and Mettupalayam link road, Mettupalayam, Puducherry 2nd call.
Improvements to the cement concrete and bituminous road and regrading of L drain in Srinivasa nagar, Guru Sithananda nagar, Mothilal nagar, Navakulam area, Karuvadikuppam area and Mahaveer nagar of Kalapet Constituency, Puducherry.
Renovation and repair works of CDR building, MMR building and Residential quarter type - V -1 no., Type- II - 12 nos. including external services of road drainage, water supply lines, jungle clearance etc. of India Meteorological department campus at Karaikal. SH: Providing and operation of Inspection vehicles for Assistant Engineer (Karaikal), Under EE(Puducherry), CPWD for the period of Three (3) months.
Desilting the existing U drain along NH45A from Indira Gandhi Square to Natesan Nagar Junction (Ch.37/420 to Ch.37/650) on both sides of NH45A in Puducherry for the year 2026
Reconstruction of damaged U drain at Ch.3-260km South side and at Ch.3-140km and at Ch.3-380km North side of RC.28 Kanniakoil - Bahour road in Bahour Commune, Puducherry.
Balance work for providing cement concrete pavement, L drain and precast slab in the leftout portion of Mathur road from Ch.0 000 to Ch.0 340 at Periyakalapet in Kalapet Constituency, Puducherry
Desilting Dommetipeta Irrigation drainage channel from Dommetipeta Community hall to Gurempeta flood bank road in Yanam for the Year Monsoon 2023
Construction of U drain at RC.18 Karikalampakkam to Uruvaiyar road on East side from Ch.355m to Ch.822m upto the Irrigation channel near Saraswathi Kalyana Mandapam in Karikalampakkam Village, Nettapakkam Commune, Puducherry
Improvements to the existing carriage way of Maraimalai Adigal Salai from Anna Square at Ch 1 220 to Indira Gandhi Square at Ch 3 038 including construction of U drain on southern side Puducherry
Package.16. Sub Work.1.1. Construction of pump house and Silt chamber at. Location.1 to 5 Krishna Naagar Phase I to III and Karuvadikuppam drain - Vasantham nagar PH - Near OHT in ECR Puducherry
Widening and strengthening to the Dr.Ambedkar salai from Subbiah Salai junction to Colas Nagar bridge by demolishing the existing platform on both sides and reconstruction of U and L drain at Uppalam Constituency, Puducherry
Desilting of existing U drain at Sarkasimedu in RC.27 Pinnatchikuppam road, RC.18 Aranganour Bahour road, Kirumampakkam Arch road upto Eachangadu, Karaimedu road, Seliamedu road and Paper Mill road in Bahour Commune, Puducherry
Improvements to the Physics Lab, Meditation Hall, Entrance Arch and compound wall with drainage facility to the STPP Govt. Junior College, Yanam
Desilting drainage channel from Seetharama Nagar junction to creek at Island No.3 in Yanam for the monsoon in the year 2024
Desilting the U drain on both side of M.G. Road from Subbiah salai to Ezhaimariamman koil junction and Anna salai, Ambour salai, S.V. Patel salai MMA salai and Subbiah Salai at Puducherry for 2023 monsoon
Construction of U drain in RC17 Kombakkam road from Pillaiyar Koil Street to Arunachala Hotel in Kombakkam from Ch.2.330 to Ch.2.465 LHS and Ch.2.465 to Ch.3.000 LHS and RHS in Puducherry.
Desilting the existing U drain along NH45A road from Murungapakkam junction western side (40/300 to 40/550) and from Sorna Nagar to Ariyankuppam Chathiram junction (Ch.41/400 to Ch.41/750) in Puducherry
Fabrication, Supply and Erection of 40 Mtrs Floating Trash Barrier across the Confluence Point of Uppar Drainage Canal and Inner Channel of Port
Desilting Dommetipeta Irrigation drainage channel from Seetharama Nagar junction to creek at Island No.3 in Yanam for monsoon in the Year 2025.
Desilting drainage channel from Seetharama Nagar junction to Creek Island No.3 in Yanam for the Monsoon in the Year 2023 2nd Call
Providing cross bund across the drainage channel at Aratikayalanka pump house during the year 2024-25 and Maintenance of Pump House in Yanam.
Desilting of U drain on both side of Vallalar salai 45 feet road from Rainbow Nagar junction up to Kamaraj Salai and from PONLAIT milk booth to Kamaraj salai Saram Puducherry for the year of 2023
Construction of RCC drain with cover slab along the 3rd sluice channel of Murungapakkam tank starting from the public toilet at Cuddalore main road to the existing slab culvert at Ganapathi Nagar, Nainarmandapam, Mudaliarpet Constituency, Puducherr
Raising of entrance road level, raising of old scooter shed and pathway, Raising of drain walls height, Replacement of worn out AC Sheet roof with galvanized iron sheet in old store room, providing integral water proofing treatment and CC flooring to ... and drain walls