Loading…
Loading…
1,729 results • Best match
Desilting the drainage channel from old PWD GLR to Andhra Border in Jammubadava area in Kanakalapeta Village in Yanam during the monsoon period 2025
Raising the side walls of the existing U drain and providing cover slabs in the left out portions in Northern side and Southern side from Ch.148.000 to Ch.149.450 of ECR (Town Reach), Puducherry-2nd Call.
Package.2. Sub Work.1. Construction of PCC drain for the Pallavoikkal from downstream of NH45-A road crossing culvert at Sivakami nagar to upstream of NH45A Road crossing culvert near Hero Honda show room in Puducherry.
Comprehensive improvements for Muruganpakkam Tank SW4 Construction of Precast RCC Box culvert near Sudhana Nagar at ECR Cuddalore road. SW5 Construction of RCC U Drain at Thennansalai at Cuddalore Road (ECR) culvert to proposed Precast box culvert
Addition and alterations to the clinical pathology (Central lab) at Second floor, OPD block. SH: Providing Granite shelves, drain waste line and furniture for the Clinical pathology (Central Lab) at Second floor, OPD block, JIPMER, Puducherry- 06
Desilting to Boorugapolam drainage channel from Ganapathi Nagar near Lakshmi Ganapathi Temple to Chintakulapeta border in Kanakalapeta Yanam for the Monsoon in the Year 2025
Desilting to Boorugupalem drainage channel from Ganapathi Nagar near Lakshmi Ganapathi temple to Chintakulapeta border in Kanakalapeta, Yanam for the monsoon in the Year 2023.
Engaging machinery for removal of encroachment uprooted trees and hiring pumps to drain out stagnation of water along the roads, junctions of Roads sub division, BRC, PWD, Puducherry for the period November 2024 to March 2025.
Reconstruction of retaining wall and one number of culvert (Anna street, IInd cross) in Sattivoikkal drain from Ch.270m to Ch.337m from Shanmugapuram, Anna street, 1st cross culvert to Mettupalayam Fish market road in Kathirkamam Constituency, Puduch
Road work
Reconstruction of U drain and improvement of side berm from Swamipillaithottam to Sithanandha Swamy koil on the southern side of ECR and providing Jersey type precast RCC solid Block Lane Divider in the left out portion of ECR, Puducherry
Construction of 3 Nos. of slab culvert across the Murungapakkam tank 3rd sluice drain at 1st Main Road, 2nd Cross road of Kizhakkuvasal Nagar and at 5th Cross Road of Moogambigai Nagar in Nainarmandabam, Mudaliarpet Constituency, Puducherry-II Call
Comprehensive improvements for Muruganpakkam Tank SW1 Construction of RCC retaining wall on Eastern bund SW2 Construction of PCC U drain in Tank 1st 2nd sluice SW3 Construction of 2 Nos of slab culvert across the tank 3rd sluice channel
Reconstruction of damaged U drain at Pangurpet road on South side from Community Hall to road cross near Ellai Mariamman Temple and construction of road cross culvert near Varadharaja Perumal Nagar including providing and fixing RCC precast slab over
Desilting the U drain along RC-4 Valudhavour road, RC-13 Sellipet road and RC-21 frontier road including sectioning the road side berm in the Jurisdiction of Building and Roads (North) Sub Division-III, P.W.D., Puducherry (II Call).
Construction of left out drainage retaining wall from new colony Dariyalathippa from Ch.0mts to Ch.50mts. toward Nukalamma temple junction in Dariyalathippa new colony, Yanam
Providing door shutters flooring, drainage and sanitary arrangements to the garage and servant for Secretary quarters No.51to 53 and 63 at Indira Nagar Gorimedu, Puducherry
Construction of RCC Box Culvert across the drainage channel to provide approach road to Bezawada Gardens from the road adjacent to Dr.YSR Play ground in Yanam
Construction of left out drainage retaining wall from New colony Dariyalathippa from Ch.50mts. to Ch.100mts. toward Nukalamma temple junction in Dariyalathippa new colony, Yanam.
Construction of 400 Bedded boys Hostel at JIPMER Campus, Puducherry. Sub Head I (CIVIL): Building Portion including internal water supply lines, Sanitary Installation, drainage, demolition of existing quarters & other development works. Sub Head ... sanitaryinstallations, drainage ,demolition ...
Desilting the existing U drain along NH45A road from Thavalakuppam junction to Subamangala Mahal in Western side and (ch.45/700 to 45/950), and from Mahatma Gandhi Medical College to Kandhanpet (Ch.51/265 to Ch.51/700) in Puducherry.
Reconstruction of existing damaged leading U drain adjacent to rear side of Government supporting staff quarters at tail end of Kavikuil street in Ashok Nagar and Improvement of existing cement concrete road to 4th cross, Kumaran Nagar extension in L
Improvements and widening to the Braminal Street link road from Cuddalore road to Point care Street and improvements to Vannakulam Veethi link road from point care street to 100 feet road including construction of L and U drain in Mudaliarpet Puduche
Carrying out remaining work for completion of Road Over Bridge Over Uppar drain connecting Kamaraj salai and Maraimalai Adigal salai and Reconstruction of old Masonry bridge at Kamaraj salai near Balaji theatre in the North end merging point of Road
Construction of Crown road ( Phase -I) for two kilometer and enabling work like soil investigation, precast strom water drain, and trenches. SH: Providing Aluminium Partition to the office of EE & SM (C), Puducherry Project Division in Townhall Premises at Auroville, Villupuram.
Construction of RCC U drain from Ariyapalayam old Bridge to Culvert near Kannagi School junction in Villianur, Puducherry (from Ch 29/200 to Ch 29/790 in Northern Side and Ch 29/480 to Ch 29/790 in Southern side).
Supplying and placing of HDPE sand bags for breach/drainage outlet closing for the ensuing floods 2024 from Tidal lock to Aratikayalanka border at Kanakalapeta in Yanam.
Slab work
Replacement of old corroded GI water supplying lines with CPVC pipe from UG sump to terrace tank and from terrace tank to toilet in all floor and grading of existing drain at Siddha Regional Research Institute, Kuyavarpalayam, Puducherry - 605 013 Subwork/Packages: Civil
Providing and laying pumping main from Co operative Bank to Grand canal erection of submersible motor and pump set repairs to the U drain and improvements to the carriage way from Anna square to Beach road at Bussy street in Puducherry 5th call
Providing Bio Medical waste and Municipal waste shed, reconstruction of fallen U drain in between the Surgery Block and Agathiar Block and renovating the existing north east corner toilets from 1st floor to 4th floor at Agathiar Block in IGGGH and PG
Desilting the existing U drain along service road of NH45A road from Iyanarkoil Street to Cross Culvert near 100ft RTO-Eastern side and from Hasan Honda to CSB-Bank-Western side of Puducherry -Cuddalore road (NH32) in Puducherry for the year 2026
Sub work 2 Strengthening and improvements to RC-12 Sanniyasikuppam road, RC-13 Sellipet road, Four car street, Muthupillaipalayam roads
Providing MS Grill on Poleramma drain at Venkata Nagar in Yanam
Providing CC road and drain at 7th Cross road in Bezawada Gardens Yanam.
Construction of 400 beded boys hostel building at JIPMER Campus , Puducherry. SH 1(Civil) : Building portion including internal water supply lines , sanitary installation , drainage , demolition of existing quarters & other development works . SH 2( Electrical & Mechanical Installations): Package C1: Providing IEI , C2: Providing fire alarm system , C3: Providing fire fighting system , C4: Providing CCTV , C5: Providing 3 nos 13 Passengers lift , C6: Providing 5000 LPD Solar water heater , C7: Providing Networking . SH: Removing of OLD HT Cable , 200KVA Transformer , LT Poles and Over Head Lines.
Road Work
Removing the slit and solid wastages by using excavator from Francethippa drainge channel and its sub-drainage channel from NH-216 to coringa river mouth, near tidal lock in Yanam during the Momsoon period 2025
Urgent removal of silt from Sub-Channels from French Channel to Ramannacodu drain in Yanam
Construction of 400 Beded boys hostel building at JIPMER campus, Puducherry. Sub Head I(Civil): Building portion including internal water supply lines , sanitary installation, drainage, demolition of existing quarters and other development works. Sub Head II (Electrical and Mechanical installations): Package c1: Providing IEI , C2: Providing fire alarm system, C3: Providing fire fighting system ,C4: Providing CCTV , C5: Providing 3 nos 13 passengers lift , C6: Providing 5000 LPD solar water Heater , C7: Providing Networking .SH: Providing 22KV straight through heat shrinkable joint end termination and HT cable route marker etc.
Providing sheet roofing to the drain from Ayyanna Nagar culvert to Ayyanna Nagar sluice in Yanam.
Improvements to the existing drain in the main road and parallel road in Dariyalathippa village, Yanam
Providing Sluice gate arrangements for drain at coring river confluence point near Tidal locak in Yanam
Providing Sluice gate arrangements in the drain at coringa river confluence point near Tidal lock in Yanam
Sub work 3. Construction of RCC Box drain linking Mettuvoikkal and Pallavoikkal at Kalyanasundra Murthy Nagar, Puducherry.
Construction of CC drain from New GLR to Sri Ganapathi temple junction road in Kanakalapeta village, Yanam
Repair to Well in Kizhakkedath colony and Construction of a drain to bed waste water around the well.
Providing and laying of CC roads and reconstruction of drain in Brahmandam Nagar (Phase-II) in Yanam Constituency.
Construction of balance length of concrete drain on North side of New GLRs in Kanakalapeta village in Yanam
Construction of 400 bedded boys Hostel Building at JIPMER campus, Puducherry. (CivilWork): Building including internal water supply lines, Sanitary installation, Drainage, demolition of existing quarters & other development works. (electrical and Mechanical Installation): Package C1: providing Internal E1, C2: Providing fire alarm system, C3: Providing Firefighting system, C4: Providing CCTV, C5: Providing 3 Nos 13 Passenger lift, C6: Providing 5000 LPD Solar Water Heater, C7: Providng Networking, (Agreement No.32/EE(E)(Puducherry)/CPWD/2023-24) Sub Head: Risk & Cost Under Clause 14 For Providng Solar Water Heater , Street Light and LT Cable. Subwork/Packages: Risk & Cost under clausse 14 for Proving Solar Water heater, Street light & LT Cable..