Loading…
Loading…
2,743 results • Best match
WORK OF POWER T/F AND 11 KV PANEL WATER LAVEL EARTHING UNDER EDD-II LONI.
Earthing of Power Transformers and VCBs at various Sub-Station in area of EDD-I Hapur
Providing of power points and extension of copper earthing and other associated works in WL 114
Installation, Testing & Commissioning of 62.5 kVA Three Phase Silent D. G. Set including Earthing, Di (Q3)
Installation, Testing and Commissioning of 10kVA Single Phase Silent D. G. Set and Earthing, Distribu (Q3)
Installation, Testing and Commissioning of 40kVA Three Phase Silent D. G. Set and Earthing, Distribut (Q3)
Provision for Control Panel, Cabling & Earthing etc at New Court Building (H. Q. ) District Kannauj. (Q3)
Work of the changed converter damaged 08 MVA. and converter earthing work various place EDD NAKUR.
Work of the changed converter damaged 05 MVA. and converter earthing work various place EDD NAKUR.
Replacement/Repairing of LT Cable and Damaged Earthing on Medium Power Transformers under EDD-III, Mainpuri.
Replacement/Repairing of LT Cable and Damaged Earthing of Medium Power Transformer under EDD-I, Mainpuri.
Water Level Earthing of 10, 8 and 5 MVA T/F and VCB Under EDSD Nagal
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Main structure Earthing; Switchyard; Service Provider
peg table, copper wire for earthing plate, copper wire 2.5 mm, 32 amp MCB, cable tie
1- Maintenance of Electrical Installation including Security Light in the Office of the Dy Commissioner and 1 No Type IV Qtr at Special Bureau, F-11/2, D-Block, Indira Nagar, Lucknow. (SH: SITC of Split AC with Stabilizer) 2- SITC of earthing work at Special Bureau, F-11/2, D-Block, Indira Nagar, Lucknow.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Earthing of 400 KV Manth Muradnagar line at tower no 488 by providing leg to leg earthing; Using approved eathing rod and MS flat complete in all respect; Service Provid..
MOULDED C T TERMINAL BLOCK WITH 14 TERMINALS (Q3), MOULDED EARTHING TERMINAL BLOCK WITH THREE TERMINAL (Q3)
Various Work of centrifuging and earthing of 10 MVA T/F at in area EDSD RAMPUR MANIHARAN
Aluminium Partition, False Ceiling, Glass Door, Door Fixuture, Wooden Rack, Earthing, Dismantaling of Partition, Assembeling of partition
Additional neutral earthing of various transformers at 220 KV and 132 KV Sub-Stations Under ETD Mathura
Work of the changed converter damaged 05 MVA. and converter earthing work at 33/11 KV Badgaon
Supply and Installation of Earthing Compound on 400 KV Agra Unnao Line Towers under ETD I KANPUR
Strengthening of delta earthing at 132 KV Substation Kaudihar and Soraon under Electy. Trans. Division- I, Prayagraj
Installation 125 kVA, 82.5 kVA & 25 kVA Three Phase Silent DG Sets and Earthing Distribution of Gene
PROCUREMENT OF EARTHING DISCHSRGE ROD AT 220/132/33 KV S/S BHADAURA UNDER ETD-II, VARANASI
Supply and burying of safe earthing electrodes for PLC based fully automatic composting machine at MRF center.
Work of the changed converter damaged 05 MVA. and converter earthing work various place EDD II SRE.
MOULDED C T TERMINAL BLOCK WITH 14 TERMINALS (Q3), MOULDED EARTHING TERMINAL BLOCK WITH THREE TERMINALS (Q3)
Work of the changed converter damaged 05 MVA. and converter earthing work various place EDD II SRE
Earthing of Various structures and equipments at 220 KV Substation Phulpur under Electy. Trans. Division-I, Prayagraj.
Supply of earthing discharge rod at 132 KV Substation Sultanpur Road (Awas Vikas) under ETD II Lucknow
Cable Tary 300 mm, Cable Tary 450 mm, Earthing Strip, BM Frame 5 way, BM Frame 10 way
Strenghtening earthing of LAs of 20MVA T/F-I, II and Solar Bay at 132KV S/S Koraon
Work of the changed converter damaged 05 MVA. and converter earthing work place for 33/11 kv Ramgarh
Work of Spray Brush Painting of equipment, cage fencing and earthing strips at 220 KV Sub Station Barabanki
earthing work Providing and fixing of Name Plate of 220 KV Unchahar Raebareli Transmission line under ETD Raebareli
Supply of Earthing and Discharge Rods for Normal M and R at Electricity 400 KV S S Banda.
Work of the changed converter damaged 05 MVA. and converter earthing etc work at 33/11 KV Jhadwan.
Provision of earthing interlock system for operation of decantation in TLD bays at Indane Bottling Plant Lakhimpur Kheri
Painting of various type equipments and earthing strip installed at 132 kV substation Bhangel under ETD-I Noida
WORK OF 02 NOS. OF BORE EARTHING FOR 315 MVA ICT 1 INSTALLED AT 400 KV S.S BANDA
Strengthening of Existing Earthing of different Equipment and Substation Structure at 220 KV Substation Shatabdinagar under ETD Meerut
Work of the changed converter damaged 10 MVA. and converter earthing etc work at 33/11 KV DUDHLA.
Work of the changed converter damaged 05 MVA. and converter earthing work place for 33/11 kv Jhabiran
The Work of 18 No. S/S RT-DAS Project Separate Earthing Under EDD-I/II/III Loni.
Strengthing of Earthing installed various equipments and structures at 132 KV S/S Saidabad Under ETD-I Prayagraj
EARTHING NEUTRAL POINTS OF TRANSFORMER INSTALLED AT VARIOUS 220KV and 132KV SUBSTATIONS UNDER ETSD-IV OF ETD, AYODHYA
Work of the changed converter damaged 05 MVA. and converter earthing etc work at 33/11 KV SAMBHALHEDI
Repairing of 16 Mtr high mast Change of Flood Light Cable, Earthing and others as per BOQ (Q3)
1. Retention money equivalent to 3% of the total value of the work or services done will be retained for a minimum period of six months from the date of bill of that call off. However, the tenderer can submit the bank guarantee of an equivalent amount in lieu of retention money as per BPCL format. Vendor to opt for Retention money Or PBG as per their choice. 2. All the Scope of work to be executed as mentioned with tender with time schedule. 3.No part payment shall be made to vendor for partial completion of job. Payment to vendor shall be made after completion of work as per tender terms.