Loading…
Loading…
1,219 results • Best match
Repair maintenance and calibration of HT 11KV VCB held with AGE (AF) Dalhousie under GE (AF) Pathankot
The NRO Construction works include following jobs: Civil (Sales building, RCC Culvert, Driveway development etc.) Mechanical Works (Tank, MPD & STP Installation, Pipeline etc.) Electrical Works (Electrical panels, Cabling for MPD, STP, Light poles etc., Light poles, Earthing etc.)
Supply, Installation, Commissioning and Maintenance of Pumps and Motors at Irrigation Projects from Sewage Treatment Plants along with electrical panel and components complete in all respects at various locations in Punjab State.
Providing Chlorination Plant Water Connections on Existing Pipe line and New Pipe line 63mm o/d Pipe line Brick on Edge Sluice Valve Haudi Repair of Pump Chamber Repair of OHSR, Water Works Providing Control Panel etc
Prov. House Connection for existing and new Pipe Line Prov. Laying jointing Testing PVC pipe specials Sluice valve Chamber Chlorinator Replacement of Control Panel Repair of Pump Chamber OHSR and All other works Complete in all respect
Providing and Fixing of Control Panel Repair of Pump Chamber Repair of OHSR Repair of Water Works Chlorination Plant Water Connections on Existing Pipe Line and New Pipe line Distribution System Sluice Valve and Sluice Valve etc.
Providing House Connection for Existing Pipe Line New Pipe Line Prov. Laying Jointing Testing PVC pipe Specials for Distribution System Sluice valve Chamber Replacement of Machinery Repair of Control Panel Repair of Pump Chamber Repair of OHSR
Prov. House Connection for existing and new Pipe Line Prov. Laying jointing Testing PVC pipe specials Sluice valve Chamber Chlorinator Replacement of Control Panel Repair of Pump Chamber OHSR and All other works Complete in all respect
CERTAIN REPAIR MAINT OF CRANES AND FIRE FIGHTING MAINT CLEANING OF OHT WATER LEVEL INDICATORS MOTOR CONTROL PANEL TUBEWELL PUMPSTETS STARTER PANEL MOTOR CI GI PUMPING GRAVITY AND DISTRIBUTION PIPELINES INCLUDING ATTENDING BREAKDOWNS DAY TO DAY COMP
REPAIR/MAINT OF UNSERVICEABLE LT PANEL, LT SWITCH GEARS, MCCBS EARTHING, DAMAGED LT UNDERGROUND CABLES AND OTHER MISC ITEMS AT BANA ENCLAVE (LTK AREA) AND IN D-II ZONE, CBS GHAROTA UNDER AGE E/M OF GE (S) MAMUN
REPAIR/MAINT OF UNSERVICEABLE LT PANEL, LT SWITCH GEARS, MCCBS EARTHING, DAMAGED LT UNDERGROUND CABLES AND OTHER MISC ITEMS AT BANA ENCLAVE (LTK AREA) AND IN D-II ZONE, CBS GHAROTA UNDER AGE E/M OF GE (S) MAMUN
REPAIR/MAINT OF UNSERVICEABLE LT PANEL, LT SWITCH GEARS, MCCBS EARTHING, DAMAGED LT UNDERGROUND CABLES AND OTHER MISC ITEMS AT BANA ENCLAVE (LTK AREA) AND IN D-II ZONE, CBS GHAROTA UNDER AGE E/M OF GE (S) MAMUN
Procurement of Single core 6.6 kV 630mm2 XLPE HT cable for Tie from Station Switchgear Stage-I to CHP MCC-1 at GHTP Lehra Mohabbat.
KIT PAD ASSY TATA, KIT LINED SHOE ASSY TATA, 6PK EPDM BELT, THERMOSTAT ASSY TATA, SUCTION PIPE ASSY TATA, WHEEL CYL ASSY TATA, ASSY CONTROL PANEL TATA, SELF STARTOT TATA, ALTERNATOR ASSY TATA, KIT FOR JOINT BOOT TATA
INSTALLATION OF NEW TUBWELL SIZE 200MM ID 200MTR DEPTH IN THE PLACE OF FAILED TUBEWELL PUMPING MACHINERY RISING MAIN DISINFECTION UNIT SOFTWARE BASED DOL DIRECT ONLINE SMART MOTOR CONTROL PANEL AT EXISTING WS SCHEME SINGH BHAGWANTPURA 2 NO
Providing House Connection for Existing Pipe Line and New Pipe Line Prov. Laying Jointing Testing PVC pipe Specials for Distribution System Sluice valve Painting of sign board Providing and Fixing Submersible Cable New Control Panel Repair of Pump
MCCB with Thermal Magnetic/Microprocessor Based Trip Unit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6588691 Dated : 25-08-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Repair/maint of perimeter lights ,street lights, security lights, post top lanterns etc including control panel and illumination system including OH line/UG cable alongwith allied works at OTG, Bhadouriya Complex and 167 MH area under GE (S) PKT
MCB - Miniature Circuit-Breakers for a.c. operation - IS/IEC 60898 Part 1 (Q2), Molded Case Circuit Breakers (Mccb)- IS/IEC:60947 (Q3)
Siren, Control Panel with Mic, LED Blinker Light SLB Red Blue Leg Guard, LED Blinker Light SLB Red Blue Front, LED Blinker Light SLB Red Blue Rear, Indicator Chrome, Wind Shield with wizer, Fiber Light Cover, Leg Guard, Side Mirror
Prov. House for existing pipe line and new Pipe Line PVC pipe specials for Distribution System Sluice valve Chamber Chlorinator Replacement of Control Panel Repair of pump Chamber and OHSR and Development of water works etc Complete in all respect
PVC PIPE 75 MM 6KG CM2, PVC PIPE 110 MM 6KG CM2, PVC PIPE 160 MM 6KG CM2, HYDRANT RAIN GUN, BUTTERFLY VALVE 2 INCH, FEMALE COUPLING 2 INCH, WATER MOTOR 12.5HP, ELECTRIC WIRE 3 PHASE 62 MTR, ELECTRIC CONTROL PANEL
Prov. House Connection for existing and new Pipe Line Prov. Laying jointing testing PVC pipe for Distribution System S V Chamber Repair of Pumping Machinery Pump Chamber OHSR Prov. Installing Control Panel and All other works Complete in all respect
REPAIR/ REPLACEMENT/ MAINT OF VCB/ SF6/ SERVO STABILIZER, ISOLATION, DISTRIBUTION, POWER TRANSFORMERS ALONG WITH CONNECTED ITEMS AT AF STATION BHISIANA
Manufacture, Testing, Supply and Delivery of 11kV VCB Panels (SCADA Compatible) of assorted types, ratios Under PSPCL Vendor Development Policy
MULTIROTOR FRAME, AXIS GIMBAL CAM OF MAKE IN INDIA, AIR GEAR, POWER DISTRIBUTION BOARD, FLIGHT CONTROLLER WITH SE 100, CROSSFLIGHT FLIGHT CONTROLLER, MINI GPS, 16000 MAH 3.7V LITHIUM SOLID STATE BATTERY, MALE FEMALE CONNECTOR PAIR, BATTERY BELT 40CM
Prov. and placing new filter media layer, Washing of old layers of filter media, Control Panel for pumping machinery 25 BHP and 7.5 BHP, Repair of existing S and S tank, Carriage of Material and all other works there to at WSS Dodianwali
A Mechanism, Self powered Ashida numerical protection relay, Position indicator of Breakers, Position indicator of isolators, PB lever for motorized RMU, Motorized Kit V module, Shunt trip Coil Control Volt, Motor and Gear Assembly kit
WABCO CLUTCH BOOSTER, U BOLT, SLAVE CYLINDER, DOUBLE LEVER COMBINATION, 24V DC 12V DC CONVERTER ACTIA MAKE, SPEED SENSOR AGB, ISOLATOR SWITCH, GEAR FLY WHEEL RING, DAMPER VIBRATION, ASSY SLEEVE CYL, FRONT WIND SHIELD RH, REAR WIND SHIELD LH, ENG GASKET SUBKIT, HUB WHEEL REAR COMPLETE, CHAIN AND SPROCKET KIT
Multicolor Frame, T10 with 2 axis Gimbal Camera, Air Gear, Foxer power distribution board, Pixhwak 2 Flight Controller with SE100, Crossflight, TS100 mini GPS, 1600 mah 3.7 v lithium solid state bty, XT60 male female connector pair, Battery Belt 40 cm
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), MCB SP 16 AMP, MCB SP 10 AMP, MCB SPN 32 ... 2POLE, MCCB TPN ... KA, MCCB TPN ... 25KA, MCCB TPN
Repair to Solar Street lights, Battery 12 volt, 75 AH, 100 AH, Container of housing battery, LED solar light fitting 15 watt, Solar panel suitable for 60 watt, Preperation of solar light poles with two coats, MCCB 250 Amps, breaking capacity 35 KA, ... KA, MCCB 200 ... Amps, MCCB 160 ... KA, MCCB 125 ... KA, MCCB 100AMPS, ... 100AMPS, MCCB 63 ...
Construction of 50 MLD Sewage Treatment Plant (STP) and Providing and Fixing of 3 Nos Horizontal Split Casing Centrifugal Pumping Sets Electrical Panel etc in Existing Main Pumping Station (MPS) Near Village Khapper Kheri in South Zone including its
MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2), Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3)
Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418, Molded Case Circuit Breakers (Mccb)-IS/IEC:60947, Light Emitting Diode LED Fixture- LED tube light
Element for gyser 2000 Watt, Cable PVC copper conductor S C size 10.0 Sq mm unseathed, MCCB 200 Amps 35 25 KATP., MCCB 250 Amps 35 25 KATP., Condensor 3.15 MFD, Lamp holder batten type, Post Top Lanterns 25W, Tape insulation 20 mmx 25 mtr long, PVC Sheethed 1100 Volts multistranded twin core cable of 10 Sq mm Copper conductor
Repair and Overhauling Service - Uninterruptible power supply (UPS); Supply, installation, testing and commissioning Panel Mounting for Lighting Control; No; Buyer Premises, testing and commissioning For Lights ON/OFF Based on Sunrise and Sunset ... mounted LT panel , ... of MCCB 63A ... of MCCB 125A
Supply, erection including dismantling of existing bay, civil works, testing and commissioning of Hybrid Switchgear at 220 kV Line bay i.e Doraha ckt-II at 220kV substation, PSTCL Sahnewal. Detail scope as per specification
CABIN SHOCKER BUSH, FRT BRAKE CABLE, SPEEDOMETER CABLE, REAR HUB OIL SEAL, REVERSE LIGHT SWITCH, GEAR LEVER UNIVERSAL JOINT, STEERING BEARING, CABIN LIFTING PUMP, KM CABLE, AIR COMPRESSOR KIT, FRT FOG LIGHT, FAN BELT, WATER PUMP BELT, RAM ASSY HYDRAULIC, LOCK SIDE COVER, CHAIN SPORCKET SET, OIL SEAL KIT, FOOT STEP BAR, WIPER ARM PENTOGRAPH TYPE
As per tender documents
OIL COOLER ASSY, OIL COOLER MTG BOLT, FUEL PIPE LINE 19X19, FAN BELT, ENGINE PACKING KIT, OVER FLOW PIPE, RUBBER COUPLING PAD, PUSH ROID TUBE SEAL, STOP SOLENOID ASSY, FEED PUMP ASSY, OIL FILTER, OIL PRESSURE PIPE WITH GAUGE, FIP CHEST COVER GASKET, ... GASKET, CONTROL PANEL MTG, ...
Isolator switch (Q3), Fixed Capacitors (Fixed Capacitor for Single Phase AC Electric Fan) as per IS 1709:1984 (Q3), Elecric Bells and Accessories as per IS 2268 (Q3), Plug and Socket Distribution Board (Q3), PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3)
ARMO of EI at FSD Guruharshai for the year 2022-23. SH Rewiring of shed A to C along with replacement of switchgear and earthing as well as conversion of conventional fitting to energy efficient LED fittings.
supply, installation and commissioning and testing of operation theatre touch screen control panel 24'' for monitoring of OT parameter like temprature,humidity and other graphical user interface capable of displaying and controlling of all kind of complex OT parameter i.e.overall system that is both modular and flexible enabling it to be adopted or expandedor to accomodate new technology.The panel shall have following features (1) digital clock (2) time lapse clock (3) hand free telephone (4) medical gas alarms (5) temperature and humidity indicator (7) light control with dimmer (8) USB hot plug and play ,mp3 player and blue tooth connectivity (9) start up and run time logo (10) audio alarm (11) HEPA filter status indicator (12) OT pressure (13) OS crash protection
supply, installation and commissioning and testing of operation theatre touch screen control panel 24'' for monitoring of OT parameter like temprature,humidity and other graphical user interface capable of displaying and controlling of all kind of complex OT parameter i.e.overall system that is both modular and flexible enabling it to be adopted or expandedor to accomodate new technology.The panel shall have following features (1) digital clock (2) time lapse clock (3) hand free telephone (4) medical gas alarms (5) temperature and humidity indicator (7) light control with dimmer (8) USB hot plug and play ,mp3 player and blue tooth connectivity (9) start up and run time logo (10) audio alarm (11) HEPA filter status indicator (12) OT pressure (13) OS crash protection
supply, installation and commissioning and testing of operation theatre touch screen control panel 24'' for monitoring of OT parameter like temprature,humidity and other graphical user interface capable of displaying and controlling of all kind of complex OT parameter i.e.overall system that is both modular and flexible enabling it to be adopted or expandedor to accomodate new technology.The panel shall have following features (1) digital clock (2) time lapse clock (3) hand free telephone (4) medical gas alarms (5) temperature and humidity indicator (7) light control with dimmer (8) USB hot plug and play ,mp3 player and blue tooth connectivity (9) start up and run time logo (10) audio alarm (11) HEPA filter status indicator (12) OT pressure (13) OS crash protection
supply, installation and commissioning and testing of operation theatre touch screen control panel 24'' for monitoring of OT parameter like temprature,humidity and other graphical user interface capable of displaying and controlling of all kind of complex OT parameter i.e.overall system that is both modular and flexible enabling it to be adopted or expandedor to accomodate new technology.The panel shall have following features (1) digital clock (2) time lapse clock (3) hand free telephone (4) medical gas alarms (5) temperature and humidity indicator (7) light control with dimmer (8) USB hot plug and play ,mp3 player and blue tooth connectivity (9) start up and run time logo (10) audio alarm (11) HEPA filter status indicator (12) OT pressure (13) OS crash protection
supply, installation and commissioning and testing of operation theatre touch screen control panel 24'' for monitoring of OT parameter like temprature,humidity and other graphical user interface capable of displaying and controlling of all kind of complex OT parameter i.e.overall system that is both modular and flexible enabling it to be adopted or expandedor to accomodate new technology.The panel shall have following features (1) digital clock (2) time lapse clock (3) hand free telephone (4) medical gas alarms (5) temperature and humidity indicator (7) light control with dimmer (8) USB hot plug and play ,mp3 player and blue tooth connectivity (9) start up and run time logo (10) audio alarm (11) HEPA filter status indicator (12) OT pressure (13) OS crash protection
and other panels including meters, VFDs, 6.6KV bus transfer system, fire detection and alarm system, Telephone Exchanges and public Address system installed in plant and power colony for Stage-I and Stage-II GHTP, Lehra Mohabbat, Dist Bathinda
Preventive, Breakdown AN Shutdown Maintenance of 220KV AN 66KV CANR Panels, DRs, SER, GPS, GRP, GCDP, Digital AVR , RTCC Panels, Protection System installed on 6.6kV AN 415V switchgear and other panels including meters installed in 4x210MW and Microh