Loading…
Loading…
4,502 results • Best match
please refer BOQ
please refer BOQ
Renovation
please refer BOQ
please refer BOQ
please refer BOQ
CUSHION ASSY RH FRONT HARD TOP, CUSHION ASSY LH FRONT SOFT TOP, FLAP SET REAR, REPAIR KIT, INJECTOR ASSY FUEL, CABLE ASSY CLUTCH, HARNESS ASSY WIRING NO 1, PANEL FRONT, TAIL LIGHT VECHICULAR, TAPPER ROLLER BRG
REPAIR/MAINT AND SERVICING OF COOLER/DESERT COOLER ALONGWITH SUBMAIN WIRING/SWITCH SOCKET AND REPAIR/MAINT OF WINDOW/ SPLIT AC/ REFRIGERATOR / WATER COOLER/ DEEP FREZZER ALONGWITH OTHER ITEMS INCLUDING CERTAIN MISC WORKS AT AF STN UDHAMPUR
PERIODICAL SERVICES TO CERTAIN BUILDINGS IN VARIOUS UNITS AT GULPUR, SEKHLU AND NATU AND REPAIR/ REPLACEMENT TO E/M INTERNAL FITTING/ FIXTURE AND WIRING IN VARIOUS UNITS AT BG, HAMIRPUR AND JWG UNDER GE 881 EWS
COMPREHENSIVE MAINT TO PLASTERING FLOORING TILING BRICK WORK PLUMBING SANITARY WORK OTHER MISC BR WORK AND REPAIR REPLACEMENT OF POINT WIRING FITTINGS AND FIXTURES OF TEMP BLDGS AT UPPER GRN AT KHREUH UNDER GE 861 EWS
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
please refer BOQ
Repair of mother board of online UPS, Repair of power supply card of online UPS, Repair of wiring circuit of online UPS, Repair of power card of printer EPSON L1300, Repair of head of printer EPSON L1300
PROVN OF ELECTRIC DISTRIBUTION HOT WATER PLANT RE WIRING 50 x CEILING FANS AND SPECIAL REPAIR OF LT ELECTRIC DISTRIBUTION AND INTERNAL SECURITY LIGHTS WITH UG CABLE AT CERTAIN UNITS UNDER AGE EM OF GE 861 EWS
REPAIR /REPLACEMENT /MAINTENANCE OF CEILING FAN/EXHAUST FAN /GEYSER/ PEDESTAL FAN/ WALL MOUNTED CEILING FAN, SUB MAIN WIRING, MCBS, DBS, 3 PHASE SOCKET, INDUSTRIAL SOCKET, SERVICE CONNECTION ALONG WITH CERTAIN CONNECTED WORKS AT VARIOUS LOCATION OF 3
PISTON, V BELT, HOSE FOR AIR CLEANER, WIRING HARNESS, BATTERY CABLE ASSY, DIGITAL DC AMMETER, HIGH PRESSURE PIPE, SWITCH ON OFF SELECTOR, MCB 4 POLE 50A, MCB SINGLE POLE 6A, BALL BEARING, CANNECTING ROD BIG END BEARING
Supply of Prefabricated Guard Room Shelter with Bathroom Toilet Cubicle complete Structure including accessories meeting Design technical specifications and Store List attached, Supply of Internal and External Electrification complete including accessories meeting Design technical specifications and Store List attached, Supply of Water staging complete including accessories complete meeting Design technical specifications and Store List at attached, Supply of Sanitary fittings complete including accessories complete meeting Design technical specifications and Store List attached, Supply of Construction material complete including accessories complete meeting Design technical specifications and Store List attached
Armouring Level. All Cabin Area Including Doors, Pillars Back Doors, Windshield and Excluding the Re, Glass 42mm Front Windscreen, 42mm Front Cabin Both Sides Cabin Side View, Hydraulic Lifts, Fitments and Other Material (Suspension, Brakes, ... Brakes, Electrical Work ,
CO Sentry post, strom water Drains, Main pathway, Connecting path way, underground water storage sump with water supply Distribution lines and supplying and installation of RO Plant including base ETC at BOP Pindi of Now 148 BN SH Electrical Work
Construction of Boundary wall including Strengthening of existing Boundary wall under Operation Kawach at BSF Campus Paloura (J&K) under Jammu Frontier. Subwork/Packages: Complete Civil work and Electrical work related to Sentry Post, Guard Room and Entry Gate (Package - I)
REWIRING OF OFFRS JCOS ORS MD ACCN AT 9 PARA SANSAR CHAND VIHAR MAP QTRS NAUBAT RAM VIHAR MAP QTRS CHIBBER ENCALVE 1 FOD KALIMATA ENCLAVE AND OTM ACCN AT 1988 MED BTY 151 TA 12 DOGRA 9 PARA SF ASCON NODE MAND AND GE PROJECT CH OFFICE UNDER GE S UDH
Accelerator Pedal with Sensor, Hose Flexible, Air Cleaner Hose, Brake Shoe with Lining LRV, Brake Shoe with Lining Stallion, Rod Spring Assy Front, ECM, Cam Sensor, Crank Sensor, Wiring Harness, Injector, Hand Brake Cable BOQ Title BOQ BOQ
REPAIR REPLACEMENT, RE-WIRING OF VARIOUS RATING PUMP SETS INCLUDING SUBMERSIBLE PUMPS ALONGWITH CONNECTED ACCESSORIES LIKE FOOT VALVE, NRV, STARTER PANEL OF E/M INSTALLATIONS AND CLEANING OF RESERVOIRS UG SUMPS OF WATER SUPPLY SYSTEM UNDER THE AOR
please refer BOQ
e NIT No. 52 C7
Civil Work Base preparation excavation of ground, supply and laying of GSB, supply and stacking of graded, supply and mix macadam, supply and spreading of good quality of earth hard material, synthetic turf, chain link fencing, accessories, supply of ... and electrical works , ...
Renovation
Renovation
Supply of Prefabricated Bathroom Toilet Cubicle complete structure including accessories meeting design Technical specifications and store list attached at Udhampur, Supply of Sanitary Fitting including accessories meeting design Technical ... of Internal electrification including ... of Internal electrification including ...
CLEANING AND REPAIR OF SEWAGE LINES, SEPTIC TANKS, SOAKAGE WELLS AND ALLIED WORKS, REPAIR/ REPLACEMENT TO E/M INTERNAL FITTINGS/FIXTURES AN WIRING IN VARIOUS UNITS AT KG, LKG, JHALLAS, SURANKOTE AN K NALLAH AND REPAIR/ REPLACEMENT OF EXTERNAL
COMPREHENSIVE MAINTENANCE TO PERIODICALS FLOORING PLASTERING BRICK WORK PLUMBING SANITARY FITTINGS AND OTHER MISC BR WORKS AND REPAIR REPLACEMENT OF POINT WIRING FITTINGS AND FIXTURES IN TEMP BLDGS AT LOWER GRN AT KHREUH AND SHER E SHALI UNDER GE
REPAIR TO ROOFING, CEILING, ROOF TREATMENT AND OTHER CONNECTED WORK IN BLDG UNDER THE AOR OF AGE B/R-II AND REPAIR/REPLACEMENT TO E/M INTERNAL FITTINGS/ FIXTURES AND WIRING IN UNITS AT POONCH UNDER GE 881 EWS
CLEANING AND REPAIR OF SEWAGE LINES, SEPTIC TANKS, SOAKAGE WELL AND ALLIED WORK FOR VARIOUS UNITS AT POONCH AND REPAIR/ REPLACEMENT OF E/M INTERNAL FITTINGS/ FIXTURES AND WIRING AT MENDHAR AND REPAIR/ REPLACEMENT OF EXTERNAL SECURITY LIGHTS/ FIXTURES
please refer BOQ
Vegetable Sorting Multiple Belts with Partition at Top 22 Ft, Fruit Sorting multiple belts with Partition at Top 20 ft, Crate Loading Conveyor for Vegetables L shaped 16 ft and 15 ft, Crate Loading Conveyor for Fruits 15 ft, Electric Wiring
PROVN OF SERVO VOLTAGE STABILIZER AT SEWAGE DRAINAGE INSTALLATION, SECURITY LIGHTS AT THIMMAYA SS COLONY AND SPL REPAIR OF LIGHTENING CONDUCTOR FITTED ON BLDG NO P-977, EXTERNAL RE WIRING OF BLDG NO T-156, P-239, P-240 P-241
Oil seal rear, Bearing rear, Bolt, Toggle switch single pole, Poly V-belt, O-ring, Speedometer, Door lock front LH, Wheel nut, Gasket cyl head, Assy hose, seal oil, EDC wiring harness fuse and relay box from MSSL, Pump fuel assy
Air Filter Oil Bath 20 KVA, Stopper Old Model 20 KVA, Fuel Pipe Set 20 KVA, Fuel Filter Kit 0.5 ltr 20 KVA, Valve Kit 20 KVA, Push Rod Rubber, Head Gasket, Oil Filter, Wiring and Meters 20 KVA, Labour Charges
Hose water inlet, Butting ring 3.15MM thk, Slinger oil, Sealing ring, EDC Wiring harness, Major repair kit, Gasket tube to TC, Seal plain encased, SA of pipe oil block to FIP, SA of pipe, Gasket front cover, Gasket turbine inlet
REPAIR TO PLASTERING FLOORING TILING BRICK WORK PLUMBING SANITARY FITTINGS OTHER MISC B R WKS AND REPAIR REPLACEMENT OF DISTR BOXES POINT WIRING FITTINGS AND FIXTURES IN TEMP BLDGS AT KHREUH AND SHER E SHALI GRN UNDER GE 861 EWS