Loading…
Loading…
1,969 results • Best match
Providing Tiles flooring in balance CType Qtrs at Block-B Area
Flooring in Courtyard at SC. P.M. kanya Hostel (GDC Campus) Rewa
FLOORING WORK, SHADE AT KOTRA MANGAL BHAWAN WARD 27 ZONE 06
CC flooring work Infront of plot at New mandi yard Ashoknager
FLOORING WORK OF SAMUDAYIK BHAWAN IN TILAKGANJ WARD, SAGAR- VIDHAYAK NIDHI
Renovation of flooring work of Officers bungalow at Pachpedhi section, Jabalpur.
Wooden Flooring Work in Indoor Stadium at Ward No. 05 Waraseoni
ARRANGEMENT OF MOTOR FLOORING - Refer Techno Commercial sheet for item description.
Unbranded Flooring for GYM SBR Rubber Tile Glue-Down 15 mm
Change of flooring of various VIP bungalows at Civil Line, Jabalpur.
FINISHING WORK OF MANGAL BHAWAN IN RAHUL NAGAR BRICK WORK , PLASTER , DOOR AND WINDOW FITTING AND FLOORING WORK , W-29, Z-18
Construcation Teen Shed and paver block flooring for open gym near Anganwadi in ward number 07.Timarni
Steel Jali and Paver Block Flooring work near well Kawas Ji School, Ramnivas Singh Ward No. 31
mention in Tender Form
PROVN OF TILING IN BLDG NO. PE-39, PE-27, TILING, SANITARY AND PLUMBING FITTINGS IN TOILET OF BLDG NO PE-43, SENTRY BOXES IN WKSP AREA OF 238 FD WKSP COY EME AND LED SECURITY LIGHTS 06 NOS IN 115 INF BDE SIG COY AT DHANA MIL STN.
Construction of one room and Paver Block Flooring work in Muktidham, Ramnivas Singh Ward
Paver block near sub station both of road,Renovation of OPD wall tiles,Roof shade on 2 floor,at Rani Durgawati Hospital under HQ sub Dn no 3 jbp
Paver block near sub station both of road,Renovation of OPD wall tiles,Roof shade on 2 floor,at Rani Durgawati Hospital under HQ sub Dn no 3 jbp
Profile sheet shed, Granite lining work, vitrified floor tiles, paver block etc. work in Honble Justice bungalow No. A-3 of MPHC and other bungalows under HQ section of HQ III sub division at Jabalpur.
FLOORING KNEEDING MACHINE CAPACITY OF 10KG, CHAPATI WARMER MACHINE WITH CAPACITY OF 800 TO 900 CHAPATI BOQ Title BOQ BOQ
Providing and laying of epoxy flooring in Finishing Section (Hypersensitive Area) inside BNP factory premises, Bank Note Press, Dewas (MP) SH-Epoxy flooring in Packing Vault No. 23.
Paver Block Flooring Work near R.P. Pandey House to B.P. Awasthi House and in road near Manish Soni House, Adarsh Colony, Jai Prakash Ward No. 10
Construction of R.C.C. Shed and Paver Block Flooring Work in Ramleela Ground, Ram Nivas Singh Ward
Redstone flooring on starir case as per schedule of Rajghat HPS MPPGCL Chanderi
Paver Block Flooring and Drain Covering Work from maheshwari Building to Dunn Colony road side, Ward No. 28
Construction of Interlocking tiles work at indra Nagar gurjar wali gali ward NO. 28 Zone 11 file NO. 276/23X3/6
Construction of Inter Locking Tiles Work at Satya Narayan Santar Murar Ward NO. 27 Zone 09 File NO. 519/23X3/6
Renovation and additional alteration work for tiles work wood work falls ceiling work Tubular at SDM Chamber at collectorate building jbp
Tiles work sainatry work, and water supply work in Res building at Katanga section under Hq sub dn no 3 jbp
CONSTRUCTION OF WALL AND TILES WORK AND RAILING WORK AT SHADE IN 123 KI LINE WARD 45 ZONE 10( PARSHAD NIDHI )
Construction of Inter Locking Tiles work at Heeraman Baba Maidan Zone 23 Ward 64. File No.676/23X3/6. 2nd call.
(Molik Nidhi) Construction Work of V Shape Drain and CC Interlocking Tile Work at Sainik Colony Ward No.51. File No. 185/23X3/6.
CONSTRUCTION OF SEPTIC TANK, TILE WORK, EWC AND WASHBASIN, SHOW JUMPING SET, SAND BATH AND JUMPING OF HUNTER COURCE SUB DIVISION NO.1 REWA
Construction of Inter Locking tile Work at bhagat Singh Market in front of Ramleela Maidan Ward No. 26 Zone 09 file 816/23X3/6
Construction of Inter Locking tile Work at bhagat Singh Market in front of Ramleela Maidan Ward No.26.Zone 09 File.816/23X3/6.
Construction of RCC Wall and Paver Block Flooring work near Highmast, Dugadi Nalla Bridge, Katni
Construction of C.C. Drain and Paver Block Flooring work in Acharya Kriplani Ward No. 41
8583/GWL/E8 REPAIR/REPLACEMENT OF PLUMBING TILING, SANITARY FITTINGS AND MISC BR NATURE WORKS OF 2/3 GR UNDER GE GWALIOR
REPAIR TO DOORS, WINDOWS, FALSE CEILING AND REPLACEMENT OF ROOF SHEET, TILING ETC OF AGE B/R-IV UNDER GE (MCTE) MHOW
REPAIR/REPLACEMENT TO TILING, PCC FLOORS, PATHS, PLINTH PROTECTION, BRICK WORK AND CERTAIN B/R WORKS IN DOMESTIC AREA AT AFS AMLA
REPAIR TO TILING, PLUMBING, SANITARY FITTINGS AT HQ OFFICER MESS, CTW AND FCTS UNDER AGE B/R-IV OF GE (MCTE) MHOW
REPAIR/REPALCEMENT OF TILING, SANITARY FITTING, PLUMBING ETC IN MD ACCN AND NEARBY AREAS UNDER AGE B/R-I UNDER GE GWALIOR
Construction of Boundarywall and Paver Block Flooring Work in T.I.T. Colony, Yojna No. 06, Ward No. 44
Construction of Drain and Paver Block Flooring work from Vodafone tower to Sadhna Shukla House, Vanshswaroop Ward No. 29
ARRANGEMENT OF GENERATOR FLOORING (REFER TECHNO COMM. BID SHEET FOR DETAIL ITEM DESCRIPTION), LIFTING BEAM FOR GENERATOR FLOORING (REFER TECHNO COMM. BID SHEET FOR DETAIL ITEM DESCRIPTION)
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT KOTA STONE/TILES FLOORING DRAIN PCC RAOD ETC
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT KOTA STONE/TILES FLOORING DRAIN PCC RAOD ETC
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT KOTA STONE/TILES FLOORING DRAIN PCC RAOD ETC
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT KOTA STONE/TILES FLOORING DRAIN PCC RAOD ETC
MINOR ORIGINAL OF WORK AND CONSTRUCTION OF TOILET ADDITIONAL ROOM BOUNDARY WALL WATER SUPPLY SANITARY WORK ELECTRIFICATION FITTING DISTEMPARING EMULSION PAINTING ANNUAL REPAIRING DOOR WINDOW ROOF TREATMENT KOTA STONE/TILES FLOORING DRAIN PCC RAOD ETC