TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures, PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation, PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard for a period from the date
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc., from Unit IV Boiler Pressure parts area to debris yard for a period from the d
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from cable tray duct in boiler area and mill area and routine cleaning and maintenance work of boiler side fan motor mill motor lub oil motor feeder motor and pipe line in Unit II fo
TTPS ES EM II Unit I Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil m
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from cable tray duct in boiler area and mill area and routine cleaning and maintenance work of boiler side fan motor mill motor lub oil motor feeder motor and pipe line in Unit III f
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit IV Boiler Pressure parts area to debris yard for a period from the date on
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas of unit 1 and unit 2 where ever necessary and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas of unit 1 and unit 2 where ever necessary and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period of work on or after 08 10 2021 and upto 31 03 2022
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard for a period from the date
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines, floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
Annual work contract for cleaning of accumulated fly ash dust around the silo of PH-I, PH-II an PH-III, silo area roads/open space near silo by hiring the JCB machine with diesel and operator and loading into the trucks/dispose off into ash sump at 4
Work for cleaning of accumulated fly ash dust around the silo of PH-I, PH-II and PH-III, silo area roads/open space near silo by hiring the JCB machine with diesel and operator and loading into the trucks/dispose off into ash sump at SGTPS, MPPGCL,
Providing of labour charges for operation & Maintenance of 250MT capacity and other facilities for extraction of dry fly ash from 2nd field, 3rd, 4th,5th and 6th fields of ESPs of Stage-I (Unit-I& II) of RTPP from 01-10-2017 to 31-03-2018 (6 months)
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2020 and upto 30 09 2020
Annual work contract for cleaning of accumulated fly ash dust around the silo of PH-I, PH-II and PH-III, silo area roads/open space near silo by hiring the JCB machine with diesel and operator and loading into the trucks/dispose off into ash sump at
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard from the date of commenceme
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
Lifting & Transportation of Ash, soot etc., collected in the Unit-2 AB Pass ESP hoppers and conveying lines of ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Providing of labour charges for operation & Maintenance of 250MT capacity and other facilities for extraction of dry fly ash from 2nd field, 3rd, 4th,5th and 6th fields of ESPs of Stage-I (Unit-I& II) of RTPP from 01-10-2017 to 31-03-2018 (6 months)
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 C and D Pass ESP hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2025-26.
Lifting & Transportation of Ash, soot etc., collected in Unit-2 CD Pass ESP hoppers and conveying lines of ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Lifting & Transportation of Ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-1 ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 A&B Pass ESP hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2025-26.
Lifting & Transportation of Ash, soot etc., collected in the Unit-2 AB Pass ESP hoppers and conveying lines of ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Lifting & Transportation of Ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-1 ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Lifting & Transportation of Ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-1 ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2023-24
Lifting & Transportation of Ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-2 ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2023-24
Lifting & Transportation of Ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-2 ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2023-24.
Lifting & Transportation of Ash, soot etc., collected in the Unit-2 CD Pass ESP hoppers and conveying lines of ESP Fly ash system and other areas and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Lifting & Transportation of Ash, soot etc., collected in the ESP Fly ash system and other areas of unit 1 and unit 2 where ever necessary and disposal of the same at suitable place as per the instructions of the Engineer in charge during the financial year 2022-23
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT - 1 & 2 C&D pass ESP Hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2025-26
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 A&B Pass ESP hoppers by placing the tractor below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2025-26
Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from Unit-2 A&B Pass ESP hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the Engineer in charge during the financial year 2024-25
Round the clock running maintenance of field instruments installed in Ash handling and Main plant related to Auto control Loops, Interlock protection of auxiliaries in Yokogawa DDCMIS system, CW/ACW Pump House, Dosing system, Compressor house ETC
Annual Rate Contract (ARC) for Maintenance of C and I System(Field portion) of main plant Unit1 and 2 along with their Auxiliaries, Plant Water Package and Ash handling Plant of KTPS, DVC for 2(Two) Years