Arresting fly ash leakage from the damaged portions of concrete in between RCC shell top and roof deck sheet an around supporting angles of fly ash silo 1 and 2 and Bottom Ash Silo 1 and 2 and construction of Protection wall after dismantling the
Operation assistance and Routine maintenance round the clock of fly ash evacuation system of ESP A B C and D passes APH Duct Hoppers and fly ash bottom ash conveying system of D Pumps through out the day and preventive maintenance works for the IACs
MTPS II MI Circle O AHS Operation assistance Routine maintenance round the clock of fly ash evacuation system of ESP A B C D passes APH Duct Hoppers and fly ash bottom ash conveying system of D Pumps through out the day and preventive maintena
Capital Overhauling AOH 2025- Arresting fly ash leakage from the damaged portions of concrete in between RCC shell top and roof deck sheet and around supporting angles of fly ash silo 1 and 2 and Bottom Ash Silo 1 and 2 at MTPS-II.
Operation assistance and Routine maintenance round the clock of fly ash evacuation system of ESP A B C and D passes APH Duct Hoppers and fly ash bottom ash conveying system of D Pump throughout day preventive maintenance works for the IACs 366 days
Improvement works to ash water storage tank of Unit I II near Ash Handling Plant at NCTPS I premises.
Cleaning the roof tops of various buildings in mill, ash handling, ESP, DM plant 1 and 2, hydrogen plant
AHP Dn Cleaning and removing of spreaded and settled ash and scrap at surrounding of ash handling pump house
Cleaning the roof tops of various buildings such as power house, ash handling, boiler, Bunker ESP 4 and 5
Supply of 350 NB seamless pipes ASTM A106 Gr B in Ash Handling system of Unit IV and V
300 NB, 250 NB knife edge gate valve hand wheel operated assembly for ash handling system 2 Items
Clearing of all kinds of wastage, debris, silt, fly ash etc., from the dustbins in Stage 1 and 2 area for the period from 01.04.2024 to 31.03.2025
Replacement of buckled corroded Flat type top cover with new dished end type top cover of buffer hopper in Fly Ash Conveying System and Extension of Platform
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road up to Unit 3 compound wall
Clearing of all kinds of wastage, debris, silt, fly ash etc., from the dustbins in Stage 1 and 2 area for the period from 01.04.2026 to 31.03.2027
Providing new portal frame at the Ash Handling Pump House to support the Ash slurry pipe line at NCTPS-I
Supply of M.S. Grill Size 1.5 mtr x 1.5 mtr for ash handling pump house of Unit IV and V
NCTPS I MII Circle AHP Dn PDFACS Renewal of corroded and Damaged Fly ash conveying pipes from ESP UnitII to Main Silo entry gate at NCTPS StageII premises
Removal and disposal of fly ash silt slush deposits etc from the drains around Administrative building complex along 275 N road upto Unit3 compound wall along 302.5W road
Rectification works by attending patch up to the existing damaged 263 S BT road from New Fly Ash Gate entrance to North side of PCH 1 at TTPS
MTPS II MI Circle O and AHS BAHS Daily Maintenance AND Preventive Breakdown maintenance works in Bottom Ash Handling System for a period of 366 days
Renewal of Worn out damaged Bottom plate from drycon slope area to Head end area of Bottom Ash Handling System during the Annual Overhaul 2024 25
TTPS Mech II AHP Unit II Painting of Unit II Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals
E Tender cum E Auction with Forward bidding for Lifting and Disposal of Semi Wet Bottom Ash on AS IS WHERE IS CONDITION BASIS available at site
TTPS Mech II AHP Unit I Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL
MTPS I O AHS BAH Stage I Overhauling of Scrapper Feeders 2A2 and 2B1 in Bottom Ash Hopper Unit II and also fabrication of 300NB Economizer Hopper
Transport Contract for Transportation of Dry fly ash from TNPL Unit-2 at Mondipatti to TNPL Cement Plant at Kagithapuram through Bulker only for the period of Six Months
Cleaning the roof tops of various buildings such as Power House, Ash Handling, Boiler, Bunker ESP 4 and 5 Control room
Cleaning the roof tops of various buildings such as power house, ash handling, boiler, bunker, ESP 4 and 5 control room
Cleaning the roof tops of various buildings such as power house, ash handling, boiler, bunker, ESP 4 and 5 control room
Custom Bid for Services - AMC of Operation and Maintenance of Ash Handling System at NNTPS for the year 2023 and 2024
TTPS MechII AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027
AHP UNIT III COH work B Pass Renewal of existing corroded and damaged Bottom Ash Hopper Seal Trough supporting structure and seal Trough approach platform during capital overhaul
NCTPS I SE M II Circle AHP Dn Unit I AOH 2025 26 BAH overhauling of bottom ash hopper scrapper feeders and clinker grinders during overhaul of unit
TTPS MechII AHP Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0mtr to 6 mtr EL during annual overhaul 2024 2025
TTPS Mech II AHP Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during forthcoming overhaul
Lifting and disposal of Dry Fly ash of 48,000 MT per annum from UDANGUDI SUPERCRITICAL THERMAL POWER PLANT - STAGE I (2 x 660 MW) for a period of Two years.
Reconditioning of wornout Head end and Tail end Pocket wheels of Drycon system by using L and T EWAC special Alloy welding Rods in Bottom Ash Handling System
Reconditioning of worn out Head end and Tail end Pocket wheels of Drycon system by using L T EWAC special Alloy welding Rods in Bottom Ash Handling System
AHP Dn Renewal of new structure and providing grills over the ash slurry sump of unit 3 in ash handling pump house
AHP Dn Renewal of new structure and providing grills over the ash slurry sump of unit I in ash handling pump house
Custom Bid for Services - MEGA CONTRACT FOR ASH HANDLING SYSTEM OF NTECL VALLUR Similar Category Operation and Maintenance Power House/Power Plant
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027
Supply of Various sizes of Wafer Type Hand Operated Butterfly Valves with Heavy Duty Worm Gear Assembly for Unit 1 2 and 3 Ash Disposal System
TTPS Mech II AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 .04 2025 to 31 03 2026
TTPS Mech II AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2024 to 31 03 2025
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2024 to 31 03 2025
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2024 to 31 03 2025
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027