Custom Bid for Services - Biennial Technical Support service for Siemens PLC system at Ash Handling System Coal Handling System and Hydrogen Generation Plant at NTPL
Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors and cable trays in Unit IV and V for a period of 01 04 2025 to 31 03 2026
Lifting and Disposal of Dry fly ash of approximately 5,00,000 MT per annum from North Chennai Thermal Power Station - I (3 x 210 MW) for a period of three years (extendable upto 5 years)
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road up to Unit 3 compound wall, along 302.5W road and inside stores area
TTPS Operation Circle MPM I Unit III Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, cleaning of fly ash and debris during 2021-2022 annual overhaul period
Lifting and Disposal of Dry fly ash of approximately 10,00,000 MT per annum from North Chennai Thermal Power Station - II (2 x 600 MW) for a period of three years (extendable upto 5 years)
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 04 2020 to 30 09 2020
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 04 2020 to 30 09 2020
MTPS I M II OAHS Overhauling of Scrapper Feeders 3A2 and 3B2 in Bottom Ash Hopper Unit III and also fabrication of 300NB Eco Hopper Drain line bend for Unit III and IV
AHP Dn Breakdown Routine Maintenance of Recovery Water Line No 2 3 having OD356 362 mm from Recovery water pump house to Ash Handling pump house
Repair works to Ash Handling duct support RCC pedestal AHP walls of Unit-I_II_ III and Security room in front of FOPH at NCTPS-I premises.
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit IV MTPS I for a period of 33 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I for a period of 58 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit I MTPS I for a period of 62 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit II MTPS I for a period of 62 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit I MTPS I for a period of 58 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I for a period of 62 unit running days
MTPS I M II OAHS FAM PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit II MTPS I for a period of 58 unit running days
NCTPS II Civil Maintenance Circle Improvement work Strengthening of RCC approach road including widening and Raising the existing RCC road at Entrance of fly ash silo in Eastern side of silo area at NCTPS-II
Custom Bid for Services - BMC Works on carry out the work of servicing of 100T Electronic Weighbridge at Fly Ash weighing station of TPS II Similar Category Operation And Maintenance Of Other Machines And Plants
Renewal of identified wornout Damaged End Collar Arm Guide Beam Side plate with Top and Bottom Wings Plate of Band Elements for Drycon conveyor of Bottom Ash Handling System during AOH 2024 25
Fabrication of 250NB 300NB 350NB 400NB MS ERW bends with SS liners inside or outside MS Box cover various degrees and fly ash AB and CD pass conveying Pipe lines in Ash Handling system
NCTPSI M.II Circle AHP Dn UNITI AOH work A Pass Renewal of existing corroded and damaged Bottom Ash Hopper damaged portion of Seal Trough supporting structure and seal through approach platform etc during overhaul
NCTPSI M.II Circle AHP Dn UNITI AOH work B Pass Renewal of existing corroded and damaged Bottom Ash Hopper damaged portion of Seal Trough supporting structure and seal through approach platform etc during overhaul
Rectification works to the damaged pedestals and Providing encasing concrete to the Structural Steel Columns along Pipe Rack PR 3 along West side of Unit 5 Bottom Ash Hopper up to Mill Operator Room
TTPS MII AHP Unit II Renewal of worn out portions of Bottom ash hopper body plate connected structural supports seal trough support and stiffner plates in unit II BAH during the forthcoming annual overhaul
TTPS Mech II AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II AHP Unit I Breakdown maintenance of APH ECO hoppers ash disposal system for a period of work on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II AHP Unit II Breakdown maintenance of APH ECO hoppers ash disposal system for a period of work on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II AHP Unit I Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit III Breakdown maintenance of APH ECO hoppers ash disposal system for a period of work on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II AHP Unit II Breakdown maintenance of ECO APH hoppers ash disposal system for the period of work on or after 08 10 2022 and upto 31 03 2023
AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System consists of PLC Switch gear panels modules breakers Fly ash conveying Instrument compressors Intermediate conveying and Instrument compressors and Auxiliaries PDFACS equip
AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System consists of PLC Switch gear panels modules breakers Fly ash conveying Instrument compressors Intermediate conveying and Instrument compressors and Auxiliaries PDFACS equip
AHP Dn PDFACS Providing 3 Nos 1400 CFM capacity screw compressors on rental basis for Operation of PDFAC system to transport the fly ash from one Intermediate Surge hopper of one unit to 1000 MT Silo
TTPS ES Circle EM I Cleaning of fly ash and coal dust in the cable cable trays in and around Unit III TG area from MC Pump area to TG Floor area during OH 24 25
Lifting and disposal of Dry Fly ash of 960000 MT per annum for a period of three years from North Chennai Thermal Power Plant stage III-(1 x 800 MW) for a period of 3 years.
EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors and cable trays in Unit IV for a period of three months from the date of commencement of work
TTPS ES Circle EM I Cleaning of fly ash and coal dust in the cable cable trays in and around Unit II TG area from MC Pump area to TG Floor area during OH 24 25
Custom Bid for Services - BMC for Outsourcing Operation and Maintenance of Ash Handling System of Unit I and II for period of two years during 2024 2026
Improvement works Repair works to the damaged walk way Aluminium windows Painting and colour washing to the Ash Handling Pump House I and II at NCTPS Stage_I
AHP Dn Breakdown Routine Maintenance of Recovery Water Lines No 2 3 having OD 356 362 mm from Recovery water pump house to Ash Handling pump house
AHP Dn Breakdown Maintenance of Recovery Water Line No 1 to 3 having OD 356 / 362 mm from Recovery water pump house to Ash Handling pump house
Preventive and Daily maintenance works in Ash slurry and CT Blowdown pump house equipments Operation of Slurry equipments Dry fly ash and Bottom ash Bag filter unit cleaning and RVF Bag filter cleaning for the period of 365 days