Loading…
Loading…
960 results • Best match
AHP Dn Breakdown Maintenance of Recovery Water Line No 1 to 3 having OD 356 / 362 mm from Recovery water pump house to Ash Handling pump house
NCTPS I SE M II Circle AHP Dn Unit I AOH work A pass Renewal of existing corroded and damaged Bottom Ash Hopper damaged portion of Seal Trough supporting structure and seal trough approach platform
NCTPS I SE M II Circle AHP Dn Unit I AOH work B pass Renewal of existing corroded and damaged Bottom Ash Hopper damaged portion of Seal Trough supporting structure and seal trough approach platform
NCTPS II Civil Maintenance Circle Civil Maintenance Division Improvement work Strengthening of RCC approach road including Raising the existing RCC road at Northern road of fly ash silo in silo area near weigh bridge of NCTPS-II
TTPS ES Circle EM I Cleaning of fly ash and coal dust in the cable cable trays in and around Unit III TG area from MC Pump area to TG Floor area during O H 2025 2026
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for the period from 01042025 to 31 03 2026
Providing separate 150NB airline for PDFACS air receiver tank from Bottom ash air line header to silo 2 for conveying fly ash from A11 C11 ESP Hoppers and A11 C11 vessel lines modification vessels vent lines modification and allied works
Collecting the accumulated spilled fly ash and bottom ash in between silo and nearby silo area transporting the same to Upper ash dyke by using contractors vehicle unloading at Upper Ash Dyke location and return and Cleaning and Clearing the spilled
EM Division Clearing the settled solid ash in ESP Transformers 08 Nos Fly ash Transformer 02 Nos Ash Handling Transformer 02 Nos area inside the above transformers fencing by removing refixing of galvalume sheet around transformers
TTPS ES Circle EM II Annual maintenance of HT LT Breakers Modules Busbars and Isolators during the Overhauling period of 2025 26 at Ash Handling Plant Stage I
Dismantling of existing heavily wornout Bottom ash B Stream conveying M S ERW pipe and erection of New MS ERW pipes from Bottom ash D pump to Bottom ash silo top side
L172240750902002 LOAD CELL FIELD JB FOR 7 XTRS PACK1, L172240750902003 LOAD CELL FIELD JB FOR 6 XTRS PACK1, L172240750902004 LOAD CELL FIELD JB FOR 5 XTRS PACK1, L429319759101001 BURNER TILT SHEAR PIN FAILURE INDI BOX PACK2, L429419759101001 BURNER TILT SHEAR PIN FAILURE INDI BOX PACK2, L429119759101001 BURNER TILT SHEAR PIN FAILURE INDI BOX PACK3
NCTPS I ES Circle EM I Division S Dn III Replacement of Corroded Junction Boxes for Hopper Heaters at ESP Bottom Ash Hopper and Shaft Support Insulator Heaters at 32 mtr in Unit I II III
MTPS I OAHS Outsourcing the Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit IV MTPS I for a period of thirty unit running days
TTPS ES EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors cable Trays in Unit IV V for a period of twelve months for the date of commencement of work
MTPS I OAHS Outsourcing the Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I for a period of thirty unit running days
NCTPS-II - Civil Maintenance Circle - Improvement work - Strengthening of RCC approach road including widening and Raising the existing RCC road at Link road at Western side of NCTPS-I fly ash silo in silo area at NCTPS-II
AHP Dn Breakdown works in 6 Ton capacity EOT crane in unit I II III and ash water pump side crane 3 Ton capacity in ash handling pump house
Rectification to the existing damaged 263 S RCC road by providing BT road from Ash Handling Sub Division Office to Ash Silo 4 and 5 towards East at TTPS
AHP Dn Breakdown Routine Maintenance in Ash Slurry Disposal Lines 1 to 5 Ash Handling pump House to NCTPS stage II Compound wall for a period of 1 year
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash system during forthcoming overhaul 2021 2022
Procurement of Plummer Block with shaft assembly and its internal components for Primary, Secondary and Territory Steel belt conveyor and cleanout conveyor in Bottom Ash Conveying System (As per drawings and as per sample available at site)
MTPS I Operation Circle Chemical Division Engaging of external agency on works contract basis for the works of Collection of Received coal Bunkered coal and fly ash bottom ash samples on round the clock basis for analysis for a period of 365 da
TTPS Operation Circle MPM I Unit III Overhauling and reconditioning of hot and cold air dampers gates ducts replacement of expansion joints seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from 01 04 2023 to 31 03 2024
TTPS Operation Circle MPM I Unit III Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
MTPS I OAHS Outsourcing the Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I for a period of thirty three unit running days
MTPS I OAHS Outsourcing the Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit IV MTPS I for a period of thirty three unit running days
TTPS Operation Circle MPM I UnitII Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air.
TTPS ES EM II Annual maintenance of HT LT switchgears HT LT Breakers Modules Busbars and Isolators during the Overhauling Period of 2024 25 at Ash Handling Plant Stage I
Improvement works to the existing damaged RCC portal frame 11 to 23 support to the Ash slurry pipe lines leading towards Ash Dyke from Ash Handling Pump House at NCTPS_I
Custom Bid for Services - Erection of Lift approach platform for the Compressor House of Unit 1 Ash Handling System along with supply of required structural items Similar Category Support Services
AHP Unit II Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2022 23 from the date of taking over of site or completion of quantity which ever comes earlier
AHP Unit III Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2022 23 from the date of taking over of site or completion of quantity which ever comes earlier
TTPS Mech II AHP Renewal of worn out Bottom ash hopper body plate connected structural supports seal trough support channels vertical support columns stiffner plates and rectification work in seal trough at north side in unit I BAH
Periodical cleaning of all drains in Bottom ash hopper plant area boiler area and mill area in Unit_I_II and III and C row drain at Power House for a period of six months from the date of commencement
AHP Unit I Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2022 23 from the date of taking over of site or completion of quantity which ever comes earlier
TTPS ES EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors and cable trays in Unit IV and V for a period of twelve months from the date of commencement of work
TTPS Operation Circle MPM I Unit I Overhauling and reconditioning of hot and cold air dampers, gates, ducts, expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air duct etc.,
TTPS ES Circle EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors cable trays in Unit IV V for a period of twelve months from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM I Unit III Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air et
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road up to Unit 3 compound wall, along 302.5W road and inside stores area for the period from 01.04.2024 to 31.03.2025
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road up to Unit 3 compound wall, along 302.5W road and inside stores area for the period from 01.04.2026 to 31.03.2027
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road up to Unit 3 compound wall, along 302.5W road and inside stores area for the period from 01.04.2025 to 31.03.2026
TTPS Operation Circle MPM I Unit-I Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air etc.
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM I Unit I Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air etc.
MTPS I M II OAHS FAM PDFACS Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit- IV/ MTPS-I for a period of 33 unit running days
TTPS Operation Circle MPM I Unit II Overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air e
NCTPS I SE M II Circle AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System consists of PLC Switch gear panels modules breakers Fly ash conveying Instrument compressors Intermediate conveying and Instrument compressors and A