Loading…
Loading…
960 results • Best match
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to ESP 5 North side from CH 0m to CH 80m in Unit 5
AHP Dn UNIT III (COH) work A Pass Renewal of existing corroded and damaged Bottom Ash Hopper Seal Trough supporting structure and seal Trough approach platform during capital overhaul
NCTPS II 2 X 600 MW M II circle AHP Division Unit I II BAHS Disposal of generated semi wet bottom from the bottom ash silo I and II
TTPS MechII AHP Painting of Unit II Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during the forthcoming annual overhaul
TTPS Mech II AHP Painting of Unit III Bottom ash hopper body plate and its connected structural supports from 0mtr to 6 mtr EL during annual overhaul 2025 26
Custom Bid for Services - Transportation of Bottom Ash and slag clinkers and area cleaning in zero meter level from Boiler areas of Units 1 and 2 in TSI Expn
AHP Dn Unit-II Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2023 24 from the date of taking over of site or Completion of quantity whichever comes earlier
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance to the Ash silo s for arresting the ash leakage in Fly ash silo using PU grouting at NCTPS II
MTPS I O AHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system Unit II MTPS I till the period to dispose quantity of 105000 MT Phase II
MTPS I O AHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system Unit I MTPS I till the period to dispose quantity of 105000 MT Phase II
MTPS I M II OAHS PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit III MTPS I ash quantity of 105000 MT
MTPS-I M II OAHS FAM PDFACS Cleaning removal of spilled and dumped ash in fly ash dumping yard near silos and along both sides of the road from silo area
TTPS Mech II AHP Unit II Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
TTPS Mech II AHP Unit I Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
TTPS Mech II AHP Unit III Breakdown maintenance of ECO and APH hoppers ash disposal system for the period from 01 04 2023 to 31 03 2024
Replacing the damaged polymeric asphalt membrane sheet tar felt sheet in Ash Handling Pump House Northern side to centre beam at NCTPS I
Removal of foreign materials and damaged structural materials and grills inside the Ash slurry Sump of Unit III in Ash Handling pump house
Improvement works to the damaged Eastern side wall in Ash handling pump house and other repair works in AHP at NCTPS Stage I
Replacing the damaged polymeric asphalt membrane sheet tar felt sheet in Ash handling pump house Northern side of centre beam at NCTPS I
Procurement of 50NB 200NB 250 NB for ESP Fludizing line TAC Air line and ESP vacuum line for Ash Handling System 3 items
Custom Bid for Services - Operation & Maintenance of Ash Handling System at NNTPS (2X500MW) Similar Category Operation And Maintenance Of Other Machines And Plants
MTPS I OAHS BAHStage I Overhauling of Scrapper Feeders 1A1 1B1 in Bottom Ash Hopper Unit I and also fabrication of 300NB Economizer Hopper Drain line bend for Unit I
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of Worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to Mill Plant Operator Room South from CH 0m to CH 90m in Unit 4
TTPS Mech II AHP Stage I II Ash Water Pump House Removing of worn out internals of Bottom Ash Water Pump Machining and fixing of new internals as per requirement
MTPS I M II OAHS FAM PDFACS Operation and Maintenance of PDFACS for disposal of dry fly ash on tonnage basis including supply of spares in respect of Unit I MTPS I
Lifting and Disposal of Dry fly ash of approximately 8,00,000 MT per annum from Tuticorin Thermal Power Station (5 x 210 MW) for a period of three years (extendable upto 5 years)
TTPS Mech II AHP Unit I Breakdown maintenance of ECO and APH hoppers ash disposal system for the period of work on or after 08.04.2022 and upto 30.09.2022
TTPS Mech II AHP Unit III Breakdown maintenance of ECO and APH hoppers ash disposal system from the date of commencement of work and upto 31 03 2022
TTPS Mech II AHP Unit III Breakdown maintenance of ECO and APH hoppers ash disposal system for the period of work on or after 08.04.2022 and upto 30.09.2022
TTPS Mech II AHP Unit II Breakdown maintenance of ECO and APH hoppers ash disposal system for the period of work on or after 08.04.2022 and upto 30.09.2022
TTPS Mech II AHP Unit II Breakdown maintenance of ECO and APH hoppers ash disposal system from the date of commencement of work and upto 31 03 2022
TTPS Mech II AHP Unit I Breakdown maintenance of ECO and APH hoppers ash disposal system from the date of commencement of work and upto 31 03 2022
Strengthening the damaged structural steel columns Bracing and replacing in the damaged galvalium roof sheets around the Ash Handling Pump House transformers near AHP
Repair work to the damaged RCC columns, wall, flooring in Ash handling pump house-I and II western side of panel room at NCTPS_I
Custom Bid for Services - Biennial contract for operation AND Maintenance of Dense phase pneumatic ash handling system and sewage treatment plant of TPS1 Expansion
Dismantling the damaged pedestals and providing encasing concrete to the structural steel columns in boiler area to the East of bottom ash hopper up to mill bay in Unit 5 area
Dismantling the damaged pedestals and providing encasing concrete to the structural steel columns in Mill area to the East of bottom ash hopper up to Mill Bay in Unit 5 area
Rectification works to the damaged pedestals and Providing encasing concrete to the Structural Steel Columns along Pipe Rack PR 3 from Bottom Ash Hopper of Unit 4 upto PA Fan 4B
Lifting and Disposal of Dry fly ash of approximately 7,00,000 MT per annum from Mettur Thermal Power Station-I (4 x 210 MW) for a period of three years (extendable upto 5 years)
Lifting and Disposal of Dry fly ash of approximately 4,00,000 MT per annum from Mettur Thermal Power Station-II (1 x 600 MW) for a period of three years (extendable upto 5 years).
Removal and disposal of fly ash, silt, slush deposits etc. from the drains around Administrative building complex, along 275 N road upto Unit 3 compound wall, along 302.5W road and inside stores area
AHP Dn Unit II 2023 24 BAH Overhauling of Bottom ash hopper ash discharge gate chute Scrapper feeders Clinker Grinders Painting BAH seal through structure and overhauling of 250 NB 200 NB header pipeline during overhaul of unit
NCTPS I SE M II Circle AHP Dn Unit I II III Providing floor grill above ash slurry trench in unit I II III from Bottom Ash Hopper to Duct hopper area
Rectification to the existing damaged 263 S RCC Road from Ash Silo I II III to Ash Handling Sub Division Office towards East at TTPS
NCTPS I SE MII Circle AHP Dn Supply and Erection of 1 No Drain Pumps with Accessories for Ash Handling Pump House at NCTPS-I