Loading…
Loading…
7,482 results • Best match
Providing, Fabrication and fitting of Snow Plough lateral mounting plate for New Ashok Leyland LRV Crane 2nd of Mechanical and Hospital Sub Division 2nd Pulwama.
Complete Servicing of VRF System including Outdoor Units, AHUs, Indoor Units installed for 3rd and 4th floor at Govt. Maternity Child Hospital Gandhi Nagar, Jammu
Annual Servicing Preventive maintenance repair and Replacement Works to be carried out for the Central Heating System at 500 Bedded Govt Childrens Hospital Bemina Srinagar
Supply Installation Testing and Commissioning of 20KVA online UPS for 30 minutes power backup in case of electric power failure for Boys Hostel at Govt. Ayurvedic College Hospital Akhnoor Jammu.
Replacement of 3 phase burner motor and HT Transformer and repairs to Circulation Coils of Hot Water Generators (HWG1 and HWG2) at Boiler House of Govt. Super Specialty Hospital, Srinagar.
SITC of CCTV Cameras and other allied accessories in vital areas of Boys Hostel and Warden Residence Accommodation for guests in Boys Hostel at Govt. Ayurvedic College HospitaL Akhnoor Jammu.
Providing and fitting of overload relay and single phase preventor in place of old damaged ones and other allied works of Central Heating Plant at Govt. Super Specialty Hospital, Srinagar.
Supply Installation Testing and Commissioning of Inverter Type Hot and Cold Reversible AC Units in Assistant Professors Room of Conservative Dentistry Endodontics and Orthodontics at Govt. Dental College Hospital Srinagar
e-NIT for Rate Contract for Supply of Reagents and Consumables along with Supply of Dry Chemistry Based Integrated Chemistry and Immunoassay Analyzer at AIIMS Jammu
Maintenance of Central Heating System by way of Providing and Fitting of 2000 Ltr Capacity HDPE Multi Layered Water Raw Water Storage Tanks with Allied Works in the Boiler House of SMHS Hospital Srinagar.
SITC OF AVR 250 KVA IN DISTRICT HOSPITAL KISHTWAR
Design and SITC of MGPS IN DISTRICT HOSPITAL UDHAMPUR
WASHING OF LINEN AND OTHER ITEMS OF JLNM HOSPITAL
Laying of Black topping of road from OSK road to Shamshan Ghat Badala near PHC Badala w.No. 2, Pyt. Badala, Block Kathua
Constt.of Toilet and tile work at PHC Surara Pyt Surara, Block Ghagwal under the scheme Capex APDP for the Year 2023-24
Construction of PHC by way of Balance Work and Raising of Additional floor to the left over Building at Chatterhama Srinagar Kashmir
CREATION OF 1X63 KVA SUBSTATION ALONG WITH HT/LT NETWORK AT NEAR PHC HATHAL A IN SUBDIVISION SUNDERBANI UNDER UNITED GRANTS SCHEME.
Macadamization of approach road to PHC Lamberi by way of providing and laying WMM , BM in patches/stretches and 25mm thick OGPC
Constt. of Boundary Wall of PHC at Chhan Kana Pyt. Sangwali. Block Ghagwal District Samba under Capex for the year 2021-22
Macadamization of approach road to PHC Langer by way of providing and laying WMM , BM in patches/stretches and 25mm thick OGPC
manning of Parking Places
OUTSOURCE CAR PARKING IN JLNM HOSPITAL
PRIVATE SECURITY SERVICE IN JLNM HOSPITAL
please refer BOQ
please refer BOQ
please refer BOQ
AMC for steam boilers in Main Hospital and AMC for Hot water Generators and fitting of oil flow meters in Boiler House of Main Hospital SKIMS
Procurement of 100 Critical Care Ambulances (75 Two Wheel Drive and 25 Four Wheel Drive for deployment at Lal Ded Hospital and Bone and Joint Hospital
Microscope - Slides (V2) conforming to IS 3099 (Part 2) (Q3) (3 (3 ))
Microscopes Slide Coverslips as per IS 3099 (Q4) ( ( 3 3 ))
Urine Test Strip (V2) (Q2) ( ( 3 3 ))
Sutures (V3) (Q2) (3 (3 ))
Gel Documentation System (Q2)
Microscope - Slides (V3) as per IS 3099 (Part 2) (Q3) (3 (3 ))
Biosafety Cabinet (Q2)
Laminar air flow cabinets or stations (Q3)
High End Operating Microscope, CMC 1st year after expiry of 05 year warranty, CMC 2nd year after expiry of 05 year warranty, CMC 3rd year after expiry of 05 year warranty, CMC 4th year after expiry of 05 year warranty, CMC 5th year after expiry of 05 year warranty
please refer BOQ
please refer BOQ
DSITC OF PSA Technology based Skid Mounted 2400 LPM Oxygen Concentrated Plant and allied works including operational charges for 03 years at Govt. Bone AND Joint Hospital, Jammu.