Loading…
Loading…
3,500 results • Best match
Providing and fixing and commissioning of Additional 1000 KVA Packaged Substation, PSS, HT LT Cables, LT Main Panel,Power Factor panel etc, for Sinchai Bhawan in Building of Irrigation at Sec-5,Panchkula.
on this 4 nos. canal based scheme Lohari Ragho, Haibatpur, Dhani Kumharan and Moth Rangran PHESD Narnaund Ch. to A Mtc. of various water supply scheme under PHED Hansi Period 6 months 01.11.2020 to 31.03.2021
Rehabilitation of water course at outlet RD 48845-R Kaluana Distributary.(by laying under ground RCC pipe line)
Canal Front Development Western Jamuna Canal (WJC) under Smart Cities Mission, Phase 1
on this 4 nos. canal based scheme i.e. Lohari Ragho, Haibatpur, Dhani Kumharan, Moth Rangran PHESD Narnaund Ch. to A Mtc. of various water supply scheme under PHED Hansi for 5 months 01.11.2020 to 31.03.2021 Recall
4 lanning Panipat - Safidon - Jind - Bhiwani Road up to Canal (Carrier lined channel) (CM Announcement code No. 22895 dated 28.8.2018 in Panipat District (Providing Shifting of Electric Pole / line). Recall
Construction of pump house for drain out flood water in low lying area of village Mandkola by RCC pipe installing pump hose and outfalling at RD 129300 of Gurgaon Canal.
Special Repair of casing wear liner of 01 No. 150 Cs. Pump (P-6) at Pump House MC-4 of M/Garh Canal in M/Garh W.S Mech. Division, Narnaul
Construction of Rainwater Harvesting Recharge Well for Roof Top and Surface Water in Kunjpura S/Division Office Complex near Tubewell and in Augmentation Canal Colony near Temple, Meerut Road, Karnal
Providing and laying of vitrified tiles and white washing and replacing door and window flooring etc in Old Sr Type Quarter No 3 and 4 in Canal Colony Binjhol Panipat
Construction of CC Street and P/L NP3 Pipe in Chunna Bhatti Road from S/o Kabadi to Yamuna Canal Patri via Valmiki Mandir in ward No. 10 Yamunanagar (Recall)
Khuiyan Malkana - Const of Pavement of Dry Bricks Rasta From Near Bhakhra Canal Bridge on Diwankhera road to Nillanwali Four Line at Village Khuiyan Malkana Block Dabwali Distt. Sirsa (HGVY)
Replacement of 1 Nos. 150 Cs VT Axial Flow Pumps having lift 23.02 with 1 No 650 HP Motor HT 3.3 KV, at Pump House MC-5 Of M.Garh Canal
Construction of storm water disposal tank and installation of 10 H.P submersible motor pumps with complete accessories at community center road T-Point gurugram canal sector-8 ward no-34
White Washing Distempering Painting and Snowcem and other allied works in Senior type Quarters No. S-1 to S-4 and S-6 to S-8 in Canal Colony Rewari
Bhakra Providing FHTC JJM Distt Bhiwani Prov and Installing 1 No shallow Tube well near Jui Canal against failed Tube well in Village Bhakra and all other works contingent thereto
Construction of Flood P.H. for dewatering of Field Area Village Summakhera through 900 mm Dia RCC Pipeline through Gravity Flow and by Lifting at JLN Canal at K.M. 14.516/L.
Laying RCC Pipeline to fillup the Village Pond (Raja Ala) of Village Belbhera with canal water from RD 37200-R of Urlana Minor in a lenghth of App. 8500 Feet.
Augmentation of canal water for 5 no. existing water works covering 24 villages and construction of new water works at Budhpur, Chimnawas. Grassing with selection, no grass selected Town Saharanpur
Development of park in Sector-8 (Part-II) near H.no. 10, Mugal Canal and Beautification of various parks in Sector-7 and 8 (Part-II), Ward No.9, M.C. Karnal
Const. of Independent Canal Based water works in Village Bhola- Repair of existing boosting station and construction of road and path in Village Bohla and all other works contingent thereto.
Laying RCC Pipeline to fillup the Village Pond (Unkown-2) of Village Agondh with canal water from RD 76200-R of Urlana Minor in a lenghth of App. 5000 Feet.
White washing Distempering Painting and Snowcem and other allied works in Senior type quarters No. S 1 to S 4 and S 6 to S 8 in Canal Colony Rewari
Replacement of 2 Nos. 150 Cs VT Axial Flow Pumps with 2 No 650 HP Motor HT 3.3 KV, at Pump House MC-2 Of M.Garh Canal having lift 23.02
Estimate for the cleaning of R.C.C Box drain MUCK/Slush in Mugal Canal Phase-I to III from Mela Ram Bridge to By Pass, Karnal (Only for L/c societies )
Reconstruction back side wall of F.H-1, Replacement of door, window, tiles and white washing of F.H-11 and road between FH-8 and FH-10 in canal Colony Rohtak
White Washing, Distempering, Painting and Snowcem and other allied works in Senior Type Quarters No. S-1 to S-4 and S-6 to S-8 in Canal Colony, Rewari
Recharging scheme for revival of Krishnawati River from Vilage Manpura to Dhani Thetrabad (1690 ft.) in the Dark zone of District Rewari by connecting with Canal through under gravity pipeline
Bolni- Providing canal based water supply scheme for Garhi Bolni, Bagthala and Kheri Motla. Providing and fixing curtains and rods for windows and doors and all other works contingent thereto.
Replacement of 2 Nos. 150 Cs VT Axial Flow Pumps with 2 No 650 HP Motor HT 3.3 KV, at Pump House MC-3 Of M.Garh Canal having lift 23.02
Internal clearance of seepage drain for dewatering area of village Birhi kalan from RD 0 to 4500 and seepage drain from RD 31000-36340 and 41350-36350-L Loharu canal
Providing canal based water supply scheme Raghunathpura Gp Of 25 Nos .villages and 3Nos. Dhani Distt Rewari.Laying of tiles and C.C in office building and all other works contingent thereto
De-silting/cleaning of sewer line at 100 ft. road, bohra school road, church road, KCM school road and from aggarsen chowk to gurgaon canal in Ward No. 37, Ballabgarh.
Laying of RCC pipeline to fill up the village pond of village MEGHA MAJRA with canal water from RD. 40000-L Bhuna Minor in a length of approximate 2800 ft.
Bolni- Providing canal based water supply scheme for Garhi Bolni, Bagthala and Kheri Motla. Providing and fixing curtains and rods for windows and doors and all other works contingent thereto.
Bolni- Providing canal based water supply scheme for Garhi Bolni, Bagthala and Kheri Motla. Providing and fixing curtains and rods for windows and doors and all other works contingent thereto.
Bolni- Providing canal based water supply scheme for Garhi Bolni, Bagthala and Kheri Motla. Providing and fixing curtains and rods for windows and doors and all other works contingent thereto.
Providing Canal Based water supply scheme for Garhi, Bolni, Bagthala Kheri Motla group of villages construction of water works at village Kheri Motla Distt. Rewari (Under Sansad Adrash Gram Yojna).
Bolni- Providing canal based water supply scheme for Garhi Bolni, Bagthala and Kheri Motla. Providing and fixing curtains and rods for windows and doors and all other works contingent thereto.
Providing canal based water supply scheme Raghunathpura Gp Of 25 Nos .villages and 3Nos. Dhani Distt Rewari.Laying of tiles and C.C in office building and all other works contingent thereto
Engaging of various services by Outsourcing Policy Part I for different posts Drivers (LMV), Junior Draftsman, Telephone Attended, LDC and Helpers for the office of the Registrar, Irrigation and Water Resources Department, Haryana, Panchkula
Laying RCC pipeline 300 mm dia NP-2 for filling village pond Saran Ki Dhani (Thanwas) from Km. 0.100/L of Dhantal Minor for recharging ground water table and providing irrigation facilities. (Re-invited)
Providing unskilled semi skilled and skilled manpower for Flood preparedness, operation and maintenance of flood pool Irrigation structure and machineries for the flood season 2023-24 in the office of WS Mech. Division Jhajjar
Digging new village pond Sobhapur and laying RCC pipeline 450mm i/dia NP-2 from Km. 1.700/R of Shampura Minor for recharging ground water table and providing irrigation facilities. (Under Atal Bhujal Yojana)
D Drain 0 to 15000
CONST. OF SERVICE ROAD OF CANAL BELONGING TO IRRIGATION DEPARTMENT IN VILLAGE KULIYAKA IN CONSTITUENCY SOHNA DISTT. - GURUGRAM ID-11269 HON BLE C.M. APPROVED ON 25.01.2023 EARTHWORK, SUBGRADE, GSB, WMM, PIP BLOCKS, TOE WALL, CRASH BARRIER
Construction of Chowkidar Room, Earth Filling, Construction of boundary wall and construction of approach path at existing canal based water works Lehroda and all other works contingent thereto
on this 5 Nos canal based , Tubewell scheme under PHED HANSI Ch. To A Mtc. of various water supply scheme i.e. Bhaklana, Dharam Kheri, Ugalan, Khanda Kheri Sulchani under PHESD Narnaund for 10 months 01.06.2022 to 31.03.2023
for Providing water for irrigation purpose