AME (Manpower) of Distributary 35 & its Lateral of IBC for the year 2025-26
AME (Manpower) of Distributary 29,30,33,34 & its lateral of IBC for the year 2025-26
Removal of silt & Jungle in 7 and 8th Branches, pickup canals & uddi under CRBC (at selected reaches)
Removal of silt & Jungle in Ist & 2nd branches, pickup canals & uddi coming under CRBC (at selected reaches)
Removal of silt in Kakanakaluve RBC and 4th branch, pickup canals & uddi under CLBC(at selected reaches)
Removal of silt & Jungle in 5 and 6th Branches, pickup canals & uddi under CRBC (at selected reaches)
Annual Maintainance & Irrigation management of Combined Section, High level main canal and its Distributeries in selected reaches from km 0.000 to 23.00 of yaragatti LIS for the year 2025-26.
Maintenance of 22nd A Dy and Singanahalla pickup canal under VC main canal and Ramabhana canal under Hirode tank.
Maintenance repairs and improvement works in KB Canal & 215 PO Canal (Kumbahalla Road atchkat area) under CDS main Canal
Repairs and Restoration of Plumbing, Drainage network and maintenance of septic tank in HLC Irrigation colony Kurugodu
Temporary Repair and Reconstruction of Aquaduct at 13.20 km of Anvery Branch Canal.
Repairs to Lateral Gates and Canal structures of Kabbur Distributory Canal
Repair of canal lining of Sonthi feeder canal of Sonthi LIS
Improvements to tanks, canals and escapes comes under Balambeeda, Havanagi and Malgunda village of Hangal taluk coming under Ch 17.00 Km to 24.00 Km of RBC under Dharma project in Hangal taluk of Haveri District.(Proposed Malgunda branch canal from ch 1.90 to 4.20 km)
Removal of Silt, jungle & weeds in Southnahally branch & Bannikuppe branch, pickup canals & uddi under RSM (at selected reaches)
Removal of silt & Jungle in 3rd, 4th and 4A branches,pickup canals & uddi under CRBC(at selected reaches)
Improvements to Turaganur branch extension canal Ukkalagere branch canal and its distributaris and distributaries of Turaganur branch canal and Halavara branch canal of T Narasipura and Malavalli taluk
Removal of silt in selected reaches of BG pura canal, BG branch canal, BG pura branch extension canal, Kundur branch canal and its distributories for year 2026-27
AME (Manpower) of distributary 24 from 10.00 km to 20.00 kmfor the year 2025-26
AME (Manpower) of Distributary 17A (Head Regulator Gate) of IBC for the year 2025-26
Improvements To Distributary From Ch-11.00 To 17.00 KM Of D-23 Coming Under TBC
AME of Distributary 42,43,44, and 45 & its laterals of ILC for the year 2025-26
Improvements To Distributary From Ch-0.00 To 5.00 KM Of D-23 Coming Under TBC
AME (Manpower) of Distributary 19 A & its lateral of IBC for the year 2025-26
Improvements To Distributary From Ch-6.00 To 10.00 KM Of D-23 Coming Under TBC
Survey, Investigation, design, Supply, Installation, Testing and Commissioning of Lift Irrigation system (Head Works consisting of Intake canal, Jack well cum pump house, Power supply including substations and Transmission lines, Rising Main and Delivery chamber etc,) and Construction of Gravity Distribution System including structure for filling, 29 tanks comes under Shirahatti, Mundargi and Mundargi taluk of Gadag district by lifting the water from Tungabhadra River near Hammagi village Mundargi taluk, Gadag district Including Operation and Maintenance for a period of 5 years after successful commissioning on Turn-Key Basis under Jalwadagi tank filling scheme
Providing out sourcing manpower for No 1 Bannur sub-division Thuraganuru Branch Extension Canal, Ukkalagere Branch canal Halawara Branch Canal BGPura Branch Canal managementfor the year 2025-26
Supplying and installation of Panel board to borwell near Samudaya bhavan Samatha nagar Tamaka wno.1, Kurubarpet wno4 and Kataripalya wno20, supplying and installation of Cable to borewell Near Shamsheer Rehamaniya house wn9, Therahalli road wno16 ... Ambika drip irrigation Bhovi ...
Re-construction of Syphon super passage at Ch. 80.80 km under Davanagere Branch canal.
Re-construction of Syphon super passage at Ch. 77.50 km under Davanagere Branch canal.
Re-construction of Syphon super passage at Ch. 76.00 km under Davanagere Branch canal.
Re-Construction of Syphon Super Passage at Ch. 70.98 Km under Davanagere Branch Canal
Re-construction of Syphon super passage at Ch. 78.20 km under Davanagere Branch canal.
Construction of sheletr/Parking area for Vehicles at No.5 Bhadra canal division, Davangere
Removal of Jungle in Khajanegowda pickup canal,sakammapickup canal of Dalvoy tank.
Annual Maintainance & Irrigation management of Low level main canal and its Distributeries in selected reaches from km 0.000 to 18.00 of yaragatti LIS for the year 2025-26. (Reserved for SC bidder)
Removal of silt from Ch.0.00 to 4.00 km of Vaddaragudi tank high level canal, from ch 0.00 to 3.75 km of Gurupura tank feeder canal, from ch 0.00 to 2.00 km of Ballenahalli sluice canal, Tavarekere, vadakekette, Hendadakatte sluice canal and from ... sluice canal & ... pickup canal under ... Hanumanthapura canal .
Maintenance repairs and improvement works in 214 PO canal (Arekallu Road) & 211 A (Gendehosahalli Tank) PO canal under CDS main Canal
Removal of silt in Selected reaches of Chowkalli Branch Canal, Ramakatte pickup canal and Balegaranakatte tank canal coming under Hanagodu series.
Construction of check dam on the stream flowing near the land of Scheduled Tribes land Survey No. 312, 861, 862 & 863 of Kanajanahallli Village in Dharmaura hobli and Survey No. 251 of Kariyala Village Javanagondanahalli Hobli in Hiriyur Taluk
Construction of FIC to DPO-18 of Block-41,DPO-19 of Block-42,DPO-20 of Block-43,DPO-21 of Block-44,DPO-22 of Block-45 under Chachadi Main Canal and OL-10 of Block-30(FIC-1,1A&2), OL-12 of Block-31 under Distributary Canal-5 of Chachadi LIS(Including earth work ,cc lining & structures work)- Package-6
Maintenance of canal system, intakes for supply of water to field for irrigation and tank filling schemes
Repairs to Aquaducts at Ch.1635 , Ch.1666 and Ch.1715 of Main Canal of TLBC
Canal Maintenance
AME (Manpower) of Distributary 17A from ch-0.00 10.00 of IBC for the year 2025-26
AME (Manpower) of distributary 22 from 12.00 km to 21.00 km for the year 2025-26
AME (Manpower) of Distributary 25 from 0.00 km to 7.500 km for the year 2025-26
AME (Manpower) of Distributary 24 from 0.00 km to 10.00 km for the year 2025-26
AME (Manpower) of Distributary 17A from ch-10.00 20.00 of IBC for the year 2025-26
AME (Manpower) of Distributary 22 from 0.00 km to 12.00 km for the year 2025-26