Loading…
Loading…
13,598 results • Best match
DEPOSIT-KyIP 2023-24-Construction of Mampoyil Ulliyeri south canal road in Ulliyeri Grama Panchayath(Canal inspection road between Ch. 2/108 Km and Ch. 2/235 Km of Narath Distributory)-General Civil Work
CPP MLBC annual MAINTANENCE FOR the year 2022 23 jungle clearance and silt removal from main canal between ch 17 320 km to 21 700 pattanchery branch canal chenthony kallingalchira thengode and karipali distributery
MLA ADS Construction of walkway from Kallupuram Junction to Kallupalam and step access to Kollam Thodu at Kallupuram junction in between Ch 73150 m to 72950 m of West Coast Canal T S Canal
CPP MRBC Engaging Labours for removing waste, debris,floating materials etc from RB main canal from Ch 0.000Km to 10.100Km and branches Kittupillai, Manaleri and Kuttipallam canal including opening of shutters during water distribution
GENERAL CANAL CLEANING WORKS 2022 2023 MP LBC Annual maintenance of Chulannur Branch canal second crop 2022 23 and first crop 2023 24 from Ch 000 KM to 12 800 KM General Civil work
EAST ZONAL DIVISION 21--PRO NO 321/24 LAYING PAVER BLOCK IN J P NAGAR CANAL BUND ROAD J P NAGAR BYE LANE AND KACHERY CANAL BUND ROAD AND SIDE CONCRETING OF VARIOUS ROADS
GENERAL-MP -Annual Maintenance 2024- 25-Peringottukurissi canal from ch.0/000km to 6/950 km odannur branch canal from ch.0/000 Km to 4/000 Km and other branches -General Civil Work
MLA- ADS (2019-2020)- Construction of a bridge across paravoor distributory canal,approach road construction in Koshnakkavu ward near yuva club and widening of canal bridge at vallakottukonam , vayali kkada ward in Chathannoor panchayath.
GENERAL-MP-LBC-ES-MLA-24-25- Construction of Canal bund road between Ch 12/800 km-13/000 km at Palathara- Chambakulam of Kurissi Pampadi Canal in Kuthannur Grama Panchayath -General Civil Work
KIP LB Annual maintenance of canal Removal of floating bodies from Kulakkada Branch Canal Ch 0m to 4000m Maravoor Distributory and Maravoor Minor Distributory in connection With water distribution for the year 2022 2023
DEPOSIT-KyIP 2023-24-Construction of Kunichikandi Narath west canal road in Ulliyeri Panchayath (Canal inspection road between Ch. 0/310 Km and Ch.0/345 Km of Narath sub Distributory)-General Civil Work
GENERAL-MP-LBC-ES-MLA-24-25- Construction of Canal bund road between Ch 14/780 km-14/980 km at Melazhi-Maruthakode of Kurissi Pampadi Canal in Kuthannur Grama Panchayath -General Civil Work
GENERAL Mansoon Preparedness 2026 27 CPP Nurnee Nurnee Alamkadavu System Engaging labour for strengthening of canal Bunds removing silts and pruning trees and allied works of Nurnee and Nurnee Alamkadavu canal General Civil Work
DEPOSIT Road work KIP O M Deposit work Re tarring of right bund Canal inspection road of RBMC From Ch 47700m to 48195m Peedikayil Padi KIP canal road at Mukalumplavil junction of Adoor Municipality
Clearing and Desilting of Kallur branch canal
Melila Eastdistributory Urgent rectification work to the breached portion of canal
GENERAL Monsoon Preparedness 2025 26 Desiltation of Upstream of Vradoor Check Dam in Kaniyambetta Panchayath In Kalpetta LAC Wayanad District General Civil Work
GENERAL 3788 2024 WP 2024 2025 Urgent works for clearing weeds and obstructions during the water distribution Emergency tree cutting Emergency bund strengthening using earth filled bags etc for various canals under Walayar dam section Genera
KIPO and MAnnual maintanence of canals 20242025Jungle clearence and removal of floating bodies during water distribution from Iverkala main distributory between ch0m to 4989m and its field boothyIverkala I distributorybetween ch0m to 3314m and its 5
GENERAL Removal of Floating body GENERAL Removal of Floating body Clearing obstructions and floating body for the smooth flow of water during water distribution 2025 in all the canals of KIP RB Section No41 26 Karunagappally
Annual Maintenance of canals action plan sanctioned works 2023-2024-Removal and dismantling of collapse Supper passage in RBMC near thachakkode between ch 23000m to 24000m in connection with water distribution 2023-24-General Civil Work
Annual Maintanence 2023 2024 KIP OANDM Annual maintanence of canals 2023 2024 Jungle clearence and removal of floating bodies during water distribution from Enathu III distributory between ch 0m to 2824m and its 9 field boothies
KIP LB A M of canals Removal of floating bodies Chavara distry from Ch 8500 m to 14767m Pattathanam minor Chavara minor Thlamugal Menampally Kovilthottam Kollaka mukkuthodu Kulangara bhagom Poroorkkara Kizhakkekara minor no 1 2 Thevalakka
Annual maintenance 25-26 Clearing light jungle of KIP Campus and Kallada House,Emergency tree cutting, eviction encroachment and planting of boundary stones for the canals under the jurisdiction of KIP LB Sub Division no13 Kollam
Urgent reconstruction works to Chalackal LIS main canal
Cleaning work of canal Prior to Water distribution
NABARD CPP Nurnee System 2023 24 Rectification of Nurnee main canal near ch. 8/250 km
KyIP_MLA_ADS_2019_2020_Construction of Kakkodi Branch Canal Inspection road from Poolakkadavu to Cheekilode Angadi
Panikkarambalam Kadinjoolchira MC Road Low level Canal bund Road Retarring Ward 10
during 2024-25 engaging labour for watching canal and for clearing obstructions including removal of slipped earth during water distribution and clearing light jungle in the forest area from Ch.16360 m to 28800 m of
Engaging DLR
Annual maintenance
GEN-FCE3-1468745/24 - Reach 2 - Rameswaram Canal de silting in div 27 and 28
SDRF 2018MI Sub division Pathanamthitta Urgent rectification of the Omalloor LI Canal in Omalloor Panchayath
MANJAPRA GP PRO NO 140 PALLIKKUNNU KUZHIYAMPADAM KAPPELA CANAL BUND ROAD SIDE PROTECTION WARD 6
CSIND- Desilting and protection work in Kainady canal in Kavalam Panchayth in Kuttanadu L.A. Constituency.
General-Modernization of the office of the CE Irrigation Administration Renovation of the establishment section of the Irrigation CE Administration in the first floor of main building and DCE room in the first floor of Annex building of Public office
13/24-25 RAYAMANGALAM GPMC ROAD SHUTTER CANAL BUND MUTTUPARA ROAD CONCREETING WARD 10
PROJECT NO-279/24-PALLICKAL G.P -MALAMEKKARA THYVILA CANAL ROAD RETARRING IN WARD-12
Perunthenaruvi SHEP- Removal of Mud and Silt from the Fore Bay Tank and Canal.
GENERAL-CPP-TMS-ACTION PLAN-2026- 27-Rectification works to Canal Portions Between Ch 2/950km to 3/000km of Vadakarapallly Distributory Canal General Civil Work
Electrical work
Providing canal lining works to unlined portion between Ch. 50 m and Ch. 96 m of Mudikkal sub branch canal and to replace damaged sluice pipe of Poonoor FC at Ch.2.400 km
Annual Maintenance to LB Main canal from 25022m to 31200m
Ring Bund Bailing out water Earth work coconut pile Earth work filling DR packing CC RCC Steel reinforcement Centering and shuttering Shutter for check dams RR solid block masonry flooring structural steel work rolling shutter etc
GENERAL KIP RB General Action Plan 2025 26 Annual Maintenance Jungle Clearance and Removing floating body for the smooth flow of water during water distribution 2025 in Sasthakulam Distributary General Civil Work
KPIP AM 2022 23 Urgent rectification works of earthwork excavation in hard rock(blasting prohibited) and bund rising in Ottapalam distributary between Ch 2/000km to 2/500km in Ananganadi Grama Panchayth
GENERAL 2025 26 KIP O and M Urgent rectification woks of Iverkala main distributary between ch 1000 m to 1200 m in order to prevent seepage and over flow General Civil Work
-Kaithachal Anganawadi keerachi Canal Vattipram Road Tarring
-Clearing and desilting of Ayanikkad Branch Canal