Loading…
Loading…
13,622 results • Best match
MP LBC MS CADA 2022 23 MP LBC Modernization of field channels Renovation of field channel Sluice 24 of Peringottukurussi canal General Civil Work
Kochi Municipal Corporation S.412/22 construction of drain and covering slabs from SI road to chambakara canal road,bagathsingh road in div 52
GENERAL 00 Reconstruction of damaged portion of canal in Chekadi LI Scheme in Pulpally Panchayath in Sulthan Bathery LA Wayanad District General Civil Wor
GENERAL-LSGD- BUDGET- 2019-20- ALATHUR LAC-Kayaramkulam- Ilamannam- Rakkooramparambu- Kizhakkethara- Chimbakkodu- Perumkunnam Canal Bund Road Construction in Thenkurissi Gramapanchayat of Kuzhalmannam Block Panchayat
PTZ-44/ 2020-21- Nellikkamugal canal bund road retarring (Using shredded plastic) and wheel drain in Ward no. 13 of Vadavucodu Puthencruz .G.P. (Retender)
Anjudi health centre cannoli canal road concreting D-25(P no 730/25)-PCP 2024-25 of Tanur Municipality under Annual plan 2024-25
CPP-MRBC-Rectification to CADA from LHS of Kozhinjampara branch canal from ch13/850 km at an estimate cost of 800000(Rupees eight lakh)
Annual Plan-44/25-26-Thottuva Church P B Sound Canal Bund Road Tile Paving in Ward- 03 in Koovappady GP-General Civil Work
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance work of field chanel sluice no 49 ch 20.250 km from peringottukurissi canal
Annual Plan-ANNUAL PLAN 2025-26/KDSY/ PRO. NO.157/26 PARAPPURAM CANAL BUND ROAD CONCRETING WARD 19 - KODASSERY GPCHALAKUDY BP-General Civil Work
PTZ S0325/25 Illichodu Canal bund Road Balance Tile laying, Side protection and Drain construction of Vadavucode Puthencruz GP under Annual Plan 2024 -25
GENERALNON PLAN 202425CPPMLBCAnnual maintenance for the year 202425 Jungle clearance and Silt removal from Arampadam Branch Canal between ch 10050km to 19000kmGeneral Civil Work
Cheerakuzhy- Flood damages-Urgent removal of silt from the canal bed Between ch 0/000Kmto 6/000 km for the year of 2019-20
SDRF Flood damage works- Rectification of Anjumoorthy Mangalam distributory at ch. 1 300km to 1 400km and cada canal 1 400km to 1 650km
Annual Plan-Tcr Corp 2024-2025 Ollur Zonal Division 27 Retarring of T K V Road Pavithram Canal Side Road -PRO.NO476- General Civil Work
PTZ S0213/24 Elakkattuthazham Chellippadam Nagar Canal Bund Road Retaring in Ward No.3 of Vadavucode - Puthencruz Grama Panchayath - under Annual Plan 2023-24
95284 LAC-ADS-LAC ADS 2024-25 Chalakudy LA - Construction of Canal Bund Road, Chalakudy Municipality, Ward 6-In Chalakudy Municipality-General Civil Work
Malappuram DP Annual Plan (2019-20 and 2020-21), Project No 2159-20 Construction of Canal for Valiyora Padam kalikkadavu at Vengara (570-21)
NABARD-KPIP-Rectification works at Various Locations of LBMC Canal-from Ch. 0/000 km to 2/500 km-2023-24-General Civil Work
346/2017-2018 CONSTRUCTION OF DRAIN,TARRING AND RE TARRING WORKS AT KARUVALLY PERIYAR VALLY CANAL BUND ROAD IN WARD-4 OF THRIKKAKARA MUNICIPALITY
GENERAL-MP-LBC-Office Building- Renovation and Repair works to LBC Subdivision Office and MP canal Section Office Building at Palakkad-General Civil Work
GENERAL Petition File KIP O and M Rectificaion works of Sasthamcotta Branch Canal between Ch 16250m to 16700m in Kadampanadu Panchayath General Civil Work
LAC-ADS-KONGAD CONSTITUENCY- 2023-24-CONSTRUCTION OF 2 ROADS (AMBAMKUNNU ROAD TARRING, PADINJAREPAADAM ARIMBRA CANAL ROAD TARRING) IN KAANJIRAPUZHA GRAMA PANCHAYATH, PALAKKAD DISTRICT
Cheerakuzhy- Flood damages-Urgent removal of silt from the canal bed Between ch 6/050Kmto 11/000 km for the year of 2019-20
PyIP_Rectification and reformation of main canal between ch 22_050km and ch 24_800 amp near Ch 24_900Km Clearing jungle and desilting for the year 2022_23
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance work of field chanel sluice no 53 ch 22.069 km from peringottukurissi canal.
GENERAL PSM Rectification works of Amballur Branch Canal between Ch.7/350 and 7/700 km for the year 2024 25 General Civil Work
GENERAL Various Thodu CSIND Deepening work of Malayan Canal from Thondelil bridge to Kayamkulam Kayal of Kayamkulam Muncipality in Kayamkulam LAC General Civil Work
S.480/23 CONSTRUCTION OF DRAIN AND CULVERT IN PULLEPPADY ROAD , PULLEPPADY CROSS ROAD MULLASSERY CANAL ROAD DRAIN AND COVERING SLAB IN DIVISION 66
Annual Plan-IDP/2022-23 Chilanthiyar SC colony Uchikallu muthal Chemmanvalavu vare canal Road Concrete in Vattavada G P - (645/23)-General Civil Work
97/20 Paving interlock tile in Vemmalathumoola Valyattumugal road and retianing wall of canal road in road in ward no 7 of Thrikkakara Municipality
DEPOSIT KIP (LB) Construction of bridge at Kannamkottu in ward 15 across Kulakkada Branch Canal near ch. 1280 in Ezhukone grama panchayat.General Civil Work
133401 Annual Plan- DPT TSR 2023-24 RENOVATION OF MANMATHIPARA VELLACHAL CANAL CHELAKKARA GP PAZHAYANNUR BP (Pro.No.S1094/24)-IN PAZHAYANNUR BP-General Civil Work
IWT Removal of water hyacinth from Changanacherry boat getty to KC bridge of AC canal and its restoration for 1 year in Changanacherry taluk.
Annual Plan-Kottayam GP Proj No 52/23-Thallod Canal Ambukkavu Paral Road Retarring. Ch. 0/523 to 0/725 Km-General Civil Work
Annual Plan -DP -PKD- 2022- 23-(491/23)-A K G Nagar Road Canal Road in Akathe thara GP (Division 10)-General Civil Work
S -26/24- Punchiri lane,Vidhyavihar road,Konthuruthy road,Konthuruthy canal protection work,Yacht club road tile work,Yacht club footpath rennovation div 58
GENERAL-PVIP-Action Plan 2025-26- Rectification work for preventing leakage between Ch.15.750km and 15.835km of Kodanad East Branch Canal-General Civil Work
GENERAL CPP NP 2025 26 MRBC Annual maintenance of Manaleri and Naduchalla branch canal including distributaries for the year 2025 26 General Civil Work
Annual Plan-CLRA GP Project No. 369/2023-24 Thekkarapara Vayarenkil Parambu Road Odupara Sub Canal Palam Renovation in chalavara GP -General Civil Work
Upgradation of Coastal Roads in Kannur Dist Ukkasmotta Kathiroor Police Station 4th Mile PonniyamSree Aryakkara Kanni Bhagavathi Temple Canal Road in Kathiroor Grama Panchayath
LAC ADS PANTHRAMKUZHY NELLIVILA KIP Bridge Construction of Panthrankuzhi Nellivila KIP canal Bridge at Ward No 7 in Pallickal Gramma Panchayath Structural Design Work
GENERAL ES ANNUAL ACTION PLAN 2022 23 MP LBC Rectification works to sluice offtake from Ch.14.080 of Chulannur canal General Civil Work 1
GENERALNON PLAN 202425CPPMLBCAnnual maintenance for the year 202425 Jungle clearance and Silt removal from Arampadam branch canal between ch0000km to 5000km General Civil Work
GENERALCPPMLBCAnnual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Kinassery branch canal between Ch0000 km to 3500km General Civil Work
Annual Plan-Thavanoor GP Project No. 196/2022-23-Concreting to Nedat Main Road to Canal Kunjipadi Road in Ward 19-General Civil Work
Improvements to branch thodu of Ambalappuzha canal near old boat jetty at East Gate of Ambalapuzha temple in Ambalappuzha South Panchayat in Ambalappuzha LAC.
SDRF LBC Sub Division Malampuzha Project, Palakkad SDRF- Flood damages- Rectification works of field channel at Ch.7.300 km RHS of Kodunthirapully branch canal
CPP-MLBC Urgent rectification work of peruvemba no 1 branch canal between ch 0/000 km and ch 0/350 km to o/550
SDRF LBC Sub Division Malampuzha Project, Palakkad Urgent rectification and maintenance work of field channel off take from 5.100 km of pallavur branch canal.