Tender for removing ash, debris, silt from reservoir confluence points of drainage system/return canal of Power House at SGTPS Birsinghpur.
Construction of Canal System R B C and LBC including its structure of Palasi Minor Tank Project Balance Work Dist. Khandwa
General Repair and Maintenance (oiling and greasing) of CR, HR and Escape gate situated at CWC/sihawal canal at various R.D.
for raising height of HT and LT electrical lines due to development of Canal aT village Khidki Kaneri under Nawegaon DC
Repairing of H.R. Gate Size (2.50m x 4.75m) 6 Ton Capacity Electrically Operated at R.D. 0.00 Km of Bansagar Purwa Canal.
FOR THE WORK OF REPAIR OF CROSS REGULATOR GATE OF RIGHT BANK MAIN CANAL RD. 64.500 KM. OF BARGI DIVERSION PROJECT.
FOR THE WORK OF REPAIR OF AUTOMATIC TILT GATE OF RIGHT BANK MAIN CANAL RD. 49.10 KM. OF BARGI DIVERSION PROJECT.
REPAIR OF STRUCTURES AT RD 21 KM TO 33 KM. OF HANDIYA BRANCH CANAL SYSTEM OF TAWA PROJECT IN DISTT. HARDA
supply and installation work of minor and sub minor gate at different RD at sihawal canal system (under Amiliya sub division)
Upgradation of water logging area (Jalbharav) for Master Plan road from D K Cottage to Bawadiya Kala Canal, Bhopal (2ND Call)
Constrction of Road from Hathaikheda Dam to Mount foard School Raisen road Annand Nagar Canal Side Road, Bhopal Length 1.55 KM
Annual repair work for Nilji minor no. 01 and 02 Lawada minor, Khamriya minor and Chandpuri minor of Wainganga main canal.
On Turnkey Basis Construction of Gurgunda Barrage Project (Without Canal), as per detailed scope of work but not limited to that.
FOR THE WORK OF REPAIR OF HIEGHT EXTENSION OF ESCAPE GATE RD. 51.80 KM. OF LEFT BANK CANAL OF R.A.B.L.S. PROJECT.
On Turnkey Basis Construction of Kolbhan Storage tank (Without canal), as per detailed scope of work but not limited to that.
On Turnkey Basis Construction of Ruparel Tank Project (Without Canal), as per detailed scope of work but not limited to that
Special repair of VRB at Rd 16450 m and Fall at Rd 6360 m. of Ajnai dy of Handiya Branch Canal
On Turnkey Basis Construction of Jamniya Mandav Tank (Without Canal), as per detailed scope of work but not limited to that.
On Turnkey Basis Construction of Ramjipura Ruparel Tank (without canal), as per detailed scope of work but not limited to that.
Construction of balance work of Earthen Dam, Approach and Spill Channel Including 4.0m chute fall of Lacchasir Tank Scheme (Without Canal)
Shifting of11KV Line at Village Kalyanpura affected by Submergence of Sitanagar Medium Irrigation Project District Damoh (M.P.) complete work with material and labour at work site as per G Schedule and direction of Engineer.in charge
Shifting of 11KV Line (at Village KORASA) affected by submergence of Hanota Irrigation Project District Sagar (M.P.). Complete work with material and labour at work site as per G Schedule and direction of Engineer. in charge
Repairing and Reconditioning work of Tonki Distributry of Rm3 Minor and Lm3Minor of L.B.C. Main Canal at Jeerabad District Dhar (M.P.)
Supply and Installation of Minor Gate and Repair and Maintenance of Different Minor Gate of Budwa Tankand Budwa Canal (Second Call).
Repair and Maintenance of Escape Gate at R.D. 14.85 Km , 21.79 Km of Sihawal canal Under Bansagar Project Distt. Sidhi (M.P.).
Construction of Road from Jal Upbhokta (Udbhawan Sichai Yojna) Canal in Village Bagwada Road Length 1.20 Km
Providing, fabrication and fixing of S.S. Flat on Embedded parts, Casting, machining and assembly of Cast Steel Rollers, and Erection work of gates and its embedded parts of Canal gates of various sizes for Berda Tank
Fabrication, supply, erection and commissioning of Trestle Assembly and Railing Decking work and Providing, Casting, dressing and assembling of Cast Iron Ballast weight assembly work of Mahi main canal gates of size 2.20m x 2.40m 2nos at Mahi projec
Shifting of 11KV/LT Line at Village Bahrol and Kull affected by Construction of Road and Submergence area of Banda Irrigation Project District Sagar (M.P.)
Shifting of 11KV/LT Line at Village Pipriya Illai and Semra Ahir affected by Road and Submergence area of Banda Irrigation Project District Sagar (M.P.)
Shifting of 11KV/LT Line at Village Kothiyakull and Bilani affected by Construction of Road and Submergence area of Banda Irrigation Project District Sagar (M.P.)
Shifting of 33KV line (Futera Feeder) at Narsinghgarh affected by submergence of Sitanagar Medium Irrigation Project complete work with material and labour at work site.
Underwater work by trained divers and underwater repair and reconditioning of Irrigation Service Gate No. 2 at Chandel Control Structure, Indira Sagar Project, Khandwa (M.P.)
Construction and development work of rehabilitation colony at chhonda village for submergence affected families of village Gadal ka pura under Asan Barrage medium Irrigation Projcect,
electrification of irrigation 05 HP Pump connections to Shri Bahadur Jatav So Shri Gabdu Jatav at village Buddhagadi under Kailaras Dc Under (OandM) Division sabalgarh
On Turnkey Basis Construction of Chhayan-Balbahadurpura pressurized pipe irrigation system under mohanpura project, as per detailed scope of work but not limited to that
Work of Bifurcation of 11 KV Irrigation Feeder in Village Taklikheda (Nanasa) of Kannod DC under OnM Division Kannod ( Feeder Id - 211808 ) under SSTD Scheme
New Electrification work of rehabilitation site at village Badoh affected by submergence of Hanota Irrigation Project complete work with material and labour at work site.
New Electrification work of rehabilitation site at village Panari affected by submergence of Banda Irrigation Project complete work with material and labour at work site.
New Electrification work of rehabilitation site at village Gondkhedi affected by submergence of Hanota Irrigation Project complete work with material and labour at work site
New Electrification work of rehabilitation site at village Pitholi affected by submergence of Banda Irrigation Project complete work with material and labour at work site
New Electrification work of rehabilitation site at village Jajpon affected by submergence of Hanota Irrigation Project complete work with material and labour at work site
Estimate for public experiment of 1x63 KVA DTR, 11 KV Line at Village Jamgoan (on Dam Madhayam irrigation Pump) under Satnair Dc in Betul Circle
Shifting of 11KV line at Narsinghgarh (Motha DL) affected by submergence of Sitanagar Medium Irrigation Project complete work with material and labour at work site.
Lighting Arrangement with Street lights work at R and R Adarsh village PITHOLI AND PANARI affected by Submergence of Banda Irrigation Project Distt Sagar (M.P.)
On Turnkey Basis Construction of Pressurised pipe line network of Tem Medium Irrigation Project, as per detailed scope of work but not limited to that
Providing and fixing of Additional PTR at Substation of Dhamoni including New HT Line (From Bahrol to Dhamoni) affected by Submergence of Banda Irrigation Project.
Shifting of 33KV Line at Village Kalyanpura affected by Submergence of Sitanagar Medium Irrigation Project District Damoh (M.P.) complete work with material and labour at work site as per G Schedule and direction of Engineer.in charge
On Turn Key Basis Construction Serimar earthen dam with canal as per details in scope of work but not limited to that.
Repair and Maintenance of Purwa Canal Minor Gates of Different Size and Situated at Different Places RD 42.00 km to 58.35 km.