Loading…
Loading…
3,585 results • Best match
Renovation and Construction of Damaged Lined Water Course of Bhurasar Distributary System offtaking from RD 75.500 R of Birsalpur Branch Package II
Regulation of Direct Disty. And Direct Outlets of IGMN from RD 416.000 to 508.000 B/S of canal IGMN Including head cum C/R at RD 507.290 with Rojri Disty.and escape (if required) for the year 2022-23
Filling Storage tanks during canal closure period at different water supply schemes under section urban, sub Div. Anoopgarh(Canal Closure 2024)
Filling storage tanks during canal closure period at different water supply schemes under Section Rawla Sub. Dn. Gharsana (Canal Closure 2026)
Main Canal Watch and Ward Cross regulator Head Regulator of Right Main Canal 0 to 17 km for year 2026-27
Strengthening of Canal Bank Both Side from RD 620 to RD 1121 of Indira Gandhi Main Canal Stage II Package I
Silt clearance
Construction work of Canal for Pokandi East side.
Nayagaon Ahiran from the drain of Manasgaon Canal
Costruction of block road near begu road canal.
Urgent Repair of Utavli Main Canal , Chhipabarod , Baran
Repair of Flood Damage of Semli Phatak Canal.
Earth Work in Lakhawali Talab feeder Canal. 3207
Regulation of Alnia Canal System (Year 2022-23)
Renovation work on Mokala 2nd dam on Canal
Urgent repair of Main Canal of Gulendi Dam
Repair work of main canal of Borband dam
Earth Work in Lakhawali Talab feeder Canal. 4206
Repair of Flood Damage of Ratai Main Canal.
Urgent Repair of phaliya Main Canal , Chhipabarod , Baran
Construction of Sewaariya Canal Phase-II village Bekariya
Urgent Repair of Phaliya Main Canal and Minor
Earth work of main canal of Chailiya Project
Repair of boundary wall in canal colony khajuwala
Urgent Repair of Flood damaged Jawai Canal System
Road construction work near Megh Nagar Canal Road.
Rehabilitation of Kikarwali Minor of Nohar Canal System
Repair of Flood Damage of Narayan Kheda Canal.
Regulation and petroling of JNVLC (Pokran lift CANAL)
Regulation of Alnia Canal System (Year 2025-26)
silt clearance work of Right Main Canal Extensions
Development Work of Lakhawali Talab Feeder Canal. 0401
Tree plantation work on Sahwa Lift Canal road
EDTA Root Canal Irrigating Liquid 17% 60ml. Bot.
Root Canal Guttae Percha point Solvent 20ml. Bot.
ROOT CANAL K FILES 21MM, Size-10 no.
Hiring of tractor driven berma for filling storage tanks in Rural area during the period when water flow in canals under Block Bhadra under Division Nohar
Watch and ward for canals of pugal branch RD 0.000 to 96.400, Panchkot disty RD 0.000 to tail and Dandi kokeri disty RD 0.000 to tail
Regulation of Direct Disty./Minor And Direct Outlets of IGMN from RD 508.000 to 620.000 B/S of canal IGMN Including head cum C/R at RD 619.300 with Pugal Branch with Power Hydal for The Year 2022-2023
Strengthening work of Syphons and VRB in between Left Main Canal, Kapren Branch Ch. 0 to 320 and Bundi Branch canal Ch. 0 to 170
Regulation and petroling of Ch. KRA lift Canal Km 63.300 to 78.300 , Punsisar mr, Punras Mr, Bhurawas mr. and Bhamran Minor 2025-26
Filling storage Tanks During Canal closure period at different Water Supply Schemes under Section Rural-II Sub Div. Anoopgarh. (Canal Clousre 2025)
Repair and Strengthening of Canal Bank and Protection work in Patan Branch Canal due to Flood Damage between Ch.0 to 280
Emergency repair work of Aquaduct at main canal Ch. 1007 along with earth work on various places of main canal of HCSP
Filling storage tanks during canal closure period at different water supply schemes under Section Rural-II Sub. Dn. Gharsana (Canal Closure 2026)
Repair and Strengthening of Canal Bank and Protection work in Patan Branch Canal due to Flood Damage between Ch. 652 to 955.
Filling storage Tanks During Canal closure period at different Water Supply Schemes under Section JEN Urban Sub Div. Anoopgarh. (Canal Clousre 2025)
Filling Storage Tanks during canal closure period at different water supply schemes under section rural-II, Sub. Div. Anoopgarh.(Canal Closure 2024)
Filling Storage Tanks during canal closure period at different water supply schemes under section rural-I, Sub. Div. Anoopgarh.(Canal Closure 2024)
Construction of Ring bundh at various canal during the canal closure period under Jen section R-III of sub dn. Hanumangarh town