Loading…
Loading…
9,452 results • Best match
C.C. road construction work from Mangal house at the canal bridge in Village Dujana to Devsharan Master Ji house in Village Duriyai.
LOT-06, Beautification and Protection Works of Bifurcation Structure (Puliya Head) at Km 30.900 (Tail) of Betwa Main Canal in District Jhansi
Construction of 4 Cell 5X5 Meter Span Box Culvert and Approach Road On Shardanagar Canal Road to Gulripurwa Link road Km 01.
Repair and Resurfacing work from Village- Sabota Mustafabad to Dayanatpur and Kishorpur to Ramner Neemka Shahpur canal side road, YEIDA. WC-06
Construction of an interlocking road and drain from Taufiqs house to the main canal in the Brahmanan Ward of Nagar Panchayat Haidergarh
Construction of Type-I, Type-II, Type-III and Type-IV Residence Building in Campus of Banganga Canal Colony in Distt. Siddharthnagar.
Construction work of Boundary wall and Rehabilitation of Quarters ofForth Class in PAHASU I.H. in Jurisdiction of Aligarh Division Ganga Canal, Aligarh
Laying B.O.E soling on Left and Right bank of Rapti Main canal from Km 28.650 to Km 30.750 in District Shrawasti. (Retender)
Construction of artificial pond for Ganesh idol immersion and Durga idol immersion at Panki Canal under Zone 6 Ward 23 Housing Development.
Road Signage Thermoplastic and Crash Barrier work at at Badalpur Canal Patri to Eastern Periferal Road ODR under Dharmarth in Distt Gautambudhnagar
Patch repair work of Right Jamni Main canal Service Road (under gadhha mukti) from km 7.500 to 11.500 and 16.100 to 23.000
20 meter Brick Lining at head Km 0.00 of D.S and VRB at km 0.165 of D.S , U.S and VRB at km 0.360 of D.S , U.S and VRB at km 1.154 of U.S , D.S of Khasor Distributary ( Adarsh Nahar) for Year 2023-24
Boulder pitching work for river bank protection work and making of stair slope and all required work including all cost of material, labour, tool and plant etc. at Kasimpur North pump canal in district Barabanki.
Repair work of the small bridge on the East Yamuna Canal at km 1 on Behat Jasmour Shakumbhari Road
Repair work of Bridge No. 3/3 on Eastern Yamuna Canal in Km 3 of Saharanpur Chilkana Gandewad Road
FABRICATION, SAND BLASTING, EPOXY PAINTING, SHIFTING ERECTION OF NEW TRASH RACK (06 NO. SIDE 02 NO. TOP) MADE OF M.S. PLATE OF 12 MM AND 8 MM, DISMANTLING OF OLD WORN OUT TRASH RACK OF SUCTION SIDE OF PUMP NO. 9, 10 AT GYANPUR PUMP CANAL. INCLUDING
First class brick lining work with 40pct and 100pct new brick with cement plaster on both side wall and cc work on canal bed and all required wok at kasimpur north Tandwa minor in district Barabanki.
First class brick lining work with 40pct and 100pct new brick with cement plaster on both side wall and cc work on canal bed and all required wok at kasimpur north Jigani minor in district Barabanki.
Construction of a CC road from Shri Munni Lal Verma house to the pond via the canal embankment in Gram Panchayat Kucharam
Installation of 01 Nos Tubwell with pump including laying of GI pipe for irrigation purpose at RB Road campus of ICAR CISH Rehmankhera Lucknow Subwork/Packages: Main Work
C/o STP -54( Annual repair of PVC Irrigation lines in different sector and P/F 50mm dia gunmetal gate valve in Stadium Sector-21) Noida
Balance work Installation of Air Conditioning System (VRV/VRF) in Cultural Museum at Dt. Deen Dayal Upadhyay Irrigation/Cultural Museum at Raibareli Road District-Lucknow (U.P.)
Sludge disposal etc work at Main gate to Sarnath gate Kalli Paschim at Pt Deen Dayal Updhyay Irrigation and cultural museum and Garden Raibareli road Lucknow
Work of Electrical connection for operation of pressure irrigation system invillage Bardhawa (Kakarhawa) and village Dharamoli (Lotan) Under depostie scheme year 2024-25 under EDD Siddharthanagar
Manufacturing /casting and providing of Rollar and other parts for New Sharda Devaha Regulator (as per BOQ and drawing) F.O.R. at Irrigation Work Shop Division Bareilly.
ADVERTISING RIGHTS ON UNIPOLE ON BOT BASIS NEAR IRRIGATION DRAIN ON NOIDA-GR. NOIDA EXPRESSWAY AND NEAR MAHAMAYA FLYOVER FOR A PERIOD OF 01 YEAR, NOIDA
M/o of STP (Two year Maintenance of Irrigation treated water pipe line from STP Sec -50 to C and D waste plant Sec -80) NOIDA
Construction work of RCC covered drain from Irrigation Department Office/Siddheshwar Nath Temple to Sainik School via Power House in Mohalla Obari in Ward Vikas Bhawan.
RESTORATION WORK OF CROSS REGULATOR AT KM. 16.200 AND KM. 46.360 AND FALL AT KM. 28.000 ON KHAJURIA BRANCH UNDER IRRIGATION DIVISION KUSHINAGAR IN DISTRICT KUSHINAGAR.
Providing and Laying Water Proofing treatment on roof of cultural museum building at Pt. Deen dayal upadhyay Irrigation and Cultural museum and garden Raibareli Road , Lucknow.
Cleaning and Desilting of main drain from Salarpur Mahrishi Police Chowki to Irrigation Drain along with Village-Salarpur Sec-101,102 and 75 Mtr. width Road, Noida.
Strengthening of Road (P/L DBM and BC Work on 45.00M wide road from DSC Road, NSEZ Metro Station to Irrigation drain in Sector-83) Noida
M/o Drain (C/o RCC Box Drain along Aushdhiya Park from Gol Chakkar Sec-91, 85, 90, 137 to Irrigation Drain in Sec-91) Noida
Strengthening of Road(P/L DBM and BC work and Mastic work on 45M wide road from Eldeco Crossing to Irrigation Drain near Sector-136) Noida
RENOVATION WORK OF BANK AND CONSTRUCTION OF BOLDER CUTTER BETWEEN KM. 8.220 TO KM. 8.520 AT UPPER NARAYANI BRANCH UNDER IRRIGATION DIVISION GORAKHPUR IN DISTRICT MAHARAJGANJ.
Renovation/repair work of Type-III temporary residence form B-1 to B-10 and Main boundary wall of Irrigation colony in District Mahoba(Lot-1)
Construction of 33/0.4 KV Sub-Station and 33 KV Line from 132 KV Sub-Station, Panwadi to Kulpahad Sprinkalar Irrigation Project, Distt. Mahoba Turn-key
Facility Management Services - LumpSum Based - UP Irrigation Department Office; Supply and Installation of IT Software; Consumables to be provided by service provider (inclusive in contract cost)
1st Class brick lining work from 0.000 Km to 0.100 Km with 40 pe New Bricks and from 0.100 Km to 0.500Km with 100 New bricks, Cement Plaster on both side wall with CC Work on bed from 0.00Km -0.500Km at Chandarpur Pump Canal in Distt. Sitapur includ
Construction of Linning of Virohiya Escape in between km 0.00 to km 0.150 situated at km 51.080 of Meja Jirgo Link Canal.
Construction of DR.B at km.11. 582 and Construction of Dingarpur DY From Km 11.480 to 11.600 under M.G. Canal stage-II.
WARD NO- 13 CONSTRUCTION OF R.C.C. RETAINING WALL FROM GATE CULVERT TO NEAR HIGH MAST/ MINI TUBEWELL ALONG THE CANAL. (HIGHWAY SIDE)
Restoration of guide bund of drainage syphon at km 49.500 of Rapti Main Canal and Channelization work of Kharjhar drain in District Balrampur.
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KAIRANA (KISHORPUR) BRIDGE CANAL TO I.T.I. AND APROACH FOR WORKSHOP OF GOVERNMENT I.T.I. KAIRANA DISTT- SHAMLI (U.P)
Under District Barabanki, Construction of CC Road road from canal track to CC road in village Bishunpur of block Fatehpur, Lot No 5
the work of restoration and construstion of pakka works between km 0.000 to km 14.270 of Ramganga Fika Doab canal in district Bijnor
LOT 01- Renovation of service road of Betwa main canal between Head to N.H 27 and Parichha wier I.H campus (Total Km 2.232)
Supply, Fabrication and erection of Single Span Steel truss bridge, 3.0 m. wide and 50.0 m long over Betwa Canal (22.0 m Deep)
Renewal/Reconstruction of painted Canal Service Road of Nainy Dy. from Km. 0.000 to Km. 04.500 and from Km.13.294 to Km. 13.794
Construction of 100 M RCC Open Barrel, 05 No Inlet and 3400 Meter WBM road between 0.00 to 5.800 of Kyolari Feeder Canal