Loading…
Loading…
5,018 results • Best match
Jeevan Mission JJM Balance Work Narath Panchayath Laying Distribution system and providing FHTC s Pipeline Work
JalJeevanMission JJM Phasell Packagell RoadRestoration Work ChumaduthangiJn KurisumalaJn Providing FHTC in Various wards Road Restoration PipelineWork
JJM - Kattur Grama Panchayath - RDWSS to Karalam, Kattoor, Padiyoor, Poomangalam - Providing FHTC to Rural house holds
JJM-PHASE-I PROVIDING FHTC BY AUGMENTATION OF EXISTING SCHEME-RENOVATION OF TREATMENT PLANT AT PERUVANNAMUZHI
JJM -2020-21 Perumanna Panchayath -Providing FHTC by extension of existing Water Supply Scheme - various wards
JJM 2021 24 Aryanadu and Uzhamalakkal panchayaths Distribution from Mangattupara SUMP to Uzhamalakkal panchayath 2850 FHTC
Providing Functional Household Tap Connections and pipe laying
Construction of Service Reservoirs at various locations, Supply and erection of clear water pump sets, Laying clear water pumping main and gravity main to various reservoirs and providing FHTC in zone 2 of Vellamunda Panchayath.
Jal Jeevan mission - 2022-2023 - WSS to Mala and adjoining Grama Panchayaths - BWSS to Vellangallur Grama Panchayath - South zone in Thrissur District
Jal Jeevan mission - 2022-2023 - WSS to Mala and adjoining Grama Panchayaths - BWSS to Vellangallur Grama Panchayath - North zone in Thrissur District
JAl Jeevan Mission 2021-23 CWSS to Kaallara and Adj Panchayaths construction of 2 LL OHSR at Devi Nagar
Jal Jeevan Mission (JJM)-Jal Jeevan Mission-2020-21- Vellarada G P-Providing water supply facility by installing booster pump to elevated places in Kurushumala area under Vellarada G P.-General Civil Work
JJM-WSS to Koratty and Kadukutty Panchayath in Thrissur District- Providing 900 FHTC and Street Main Extension at Koratty Panchayath Ongoing (MVS)- Part II
JJM- WSS to Wandoor Panchayath - Distribution network and FHTC at Western side of Railway track in Wandoor Grama Panchayath of Malappuram District - Phase II
JJM Muriyad Grama Panchayath Providing FHTC to Rural house holds
Jal Jeevan Mission WSS to ChungatharaPothukalluEdakkara and Vazhikadavu Grama Panchayaths in Malappuram District Construction of 31 LL OHSR at Mamankara Vazhikadavu for Vazhikadavu GP and Gravity main from Edakkara Karunechi to this OHSR General Civi
Jal Jeevan Mission- Kannur District- Mokeri Grama Panchayath- WSS to Panniyannur- Panoor- Mokeri Phase 3- Construction of 9.3 LL OHSR at Valliyayi , Laying Pumping main, providing and laying distribution system and FHTCs- pipe line work.
Jal Jeevan Mission Kasaragod District- Bedadka Grama Panchayath- ARWSS to Munnad,Bedadka and Kuttikol villages-Phase 2-Construction of OHSR ,GL Sump,Laying Distribution and providing FHTCs in Pulinkunnu,Beembungal and Chembakkad areas-Highlevel zone
Jal Jeevan Mission Phase II 2020 21 Providing Functional House Hold Tap Connection By Augmentation And Extension In Kunnamangalam Grama Panchayath In Kozhikode District Packages III Pathimangalam Area And Adj Place Reformation Of Grama Panchayat
Jal Jeevan Mission _JJM_Laying Pipe lines for supply improvement in Kattakambal PanchayathWork V_Supplying and Laying 200mm DI K9 pipe and 160mm PVC Pipe from Chirakkal Centre to Pengamuk Road_chirakkal centre to Vaykadavu Road_General Civil Work
Jal Jeevan Mission - 2020-21 - Phase 1 - Providing FHTCs in Kadangode GP in Thrissur Dt - Additional Work 1 - Source improvement - RWSS to Eyyal - Replacing old damaged 20 HP with 15 HP Borewell submersible motor pumpset
Jal Jeevan Mission -Phase IV-WSS to Kanakkary, Mulakkulam and Njeezhoor Pt (Mulakkulam Package -3)- Construction of 4 Lakh litre OHSR at Mattappallikkunnu, laying distribution lines and providing FHTCs in Mulakkulam Pt -Package3)- Pipeline work-
Jal Jeevan Mission Phase II .ARWSS to Pathanapuram and Piravanthoor . Providing water supply house service connections from the existing distribution lines and through line extension in Pathanapuram Pt and Providing water supply house service connect
Jal Jeevan Mission - WSS to Arakkulam and Velliyamattom part Panchayath - Supply and laying of CWGM from Thadiyanal to Naliyani and Devarupara, providing steel tank - 2 Nos. and Providing distribution system -Package IV -High level Zone
Jal Jeevan Mission - 2023-24-CWSS to Kunnathoor WSS to Thazhava panchayath-Supply and Laying 90 mm and 63 mm pvc 6kg/cm2 pipe line and Re storation work along various roads in Thazhava panchayath.
Jal Jeevan Mission -2021-22-Improvements to CARWSS to Moorkanad and adjoining panchayats -Package I - Construction of 12 M dia Intake well cum pumphouse Rest room Approach bridge Raw water pumping main and road reformation
Jal Jeevan Mission 2020-21 - Alappad Grama Panchayat - Supplying and Laying of 90 mm PVC pipe ,Interconnection work , erection of 7.5 HP pump set and allied works in ward no. 2 of Alappad Grama Panchayath
Painting of Karakkunnu OHSR and Compound wall including JJM slogans lettering and drawing of pictures in the walls.
RWSS to Muttil Providing FHTC to Muttil GP
Jal Jeevan Mission- Full Coverage at Annamanada Grama Panchayath - Mambra Zone - Package 3 - Water treatment plant in Thrissur District
Jal Jeevan Mission - Full Coverage to Elavally Grama Panchayath in Thrissur District - Package 2 - Distribution line to Thamarappilly and Pothanmashkunnu zone
Jal Jeevan Mission - Kottur Grama Panchayath in Kozhikode District - Additional proposal for full coverage - Restoration of Panchayath Roads for the Pipe laid in Phase I
JJM 2020-21 PALICKAL PANCHAYTH PROVIDING FHTC
balance work in vanimel zone 8 ( coppera kalam to puthukayam )pwd road right side-Pipeline Work
Balance Works in Vanimel grama Panchayath-Zone 3-Pipeline Work
Construction of Reservoir, Supplying and Laying CWGM, Distribution system and providing FHTCs in Vythiri Panchayath.
Rehabilitation of existing 1.20 LL Capcity OHSR at Nirayil and Laying Distribution System and Providing FHTCs in Purameri Panchayath- Zone 1 Purameri.
Balance Works in Thuneri Grama Panchayath - Zone 2-Pipeline Work
Thalanadu Panchayath - Providing transmission mains, Construction of service reservoirs, Providing Distribution networks and FHTCs and allied works
Supply, Installation and Commissioning of 2 Nos. of 1600 KVA ,3.3kV , 1 No of 63 KVA , 440V Indoor transformers, 3 Nos. of Suitable HP VT pumpsets and allied works in 12m dia well cum pump house at Peroor._General Civil Work
balance work in nadapuram GP zone 4-Pipeline Work
Balance works in Valayam grama panchayath Zone 5
Design Construction of 12 MLD Water Treatment Plant and Allied Components, Design Construction of OHSR at Parakulam in Kappur and Allied Works-Pipeline Work
Balance work in valayam grama panchayath -Zone 4-Pipeline Work
balance work in nadapuram GP Zone5-Pipeline Work
Balance work in Nadapuram Grama Panchayath-Zone 2-Pipeline Work
Balance works in Valayam grama Panchayath Zone 2-Pipeline Work
Blance work in vanimel grama panchayath zone-9(puthukayam to vilanged)pwd road right side-Pipeline Work
balance work in nadapuram grama panchayth zone 3-Pipeline Work
-Balance Works in Vanimel grama Panchayath-Zone 2-Pipeline Work