Loading…
Loading…
5,018 results • Best match
Balance Works in Valayam grama panchayath Zone 1-Pipeline Work
Balance work in Thuneri Grama Panchayath - Zone 8
balance work in vanimel grama panchayath zone 11 pwd right sid ( near vilanged hospital to panomme) -Pipeline Work
Balance Works in Thuneri Grama Panchayath-Zone 6-
-Balance work in valayam grama panchayath Zone 3-Pipeline Work
(1)Supply laying of 200 or 150mm DI transmission main from the GLSR at Kayoor, (2) Construction of GLSRs at Athirupara,Peruppara, (3) Distribution networks in the Thalappalam panchayath for the 597 nos of FHTCs.
Phase 3 -RWSS to Mulamkunnathukavu-Construction of 6 LL OHSR Tank at KSHB Compound near Kila -5th SLSSC-Package IV-General Civil Work
Balance work in Thuneri Grama Panchayath Zone 3-Pipeline Work
Balance work in Thuneri Grama Panchayath Zone 4-Pipeline Work
-Balance work in Thuneri Grama Panchayath - Zone 7
Balance Works in Vanimel grama Panchayath-Zone 1 booster-1-Pipeline Work
Balance Works in Vanimel grama Panchayath-Zone 4-Pipeline Work
balance work in vanimel zone 7 (vanimel palam to coppera kalam )pwd road left side-Pipeline Work
Balance work in Nadapuram grama Panchayth - Zone 1- Pipeline Work
Supply errection Testing and commissioning Of Clear water Pumpsets at 50MLD WTP Peroor, pump house in 8LL OHSR at Keezhattukunnu , pump house at 13LL OHSR in Perukunnu and allied Works . -General Electrical Work-1
Balane works in Valayam grama panchayath Zone 8-Pipeline Work
Construction of 20 Lakh Liters Capacity OHSR at Industrial Estate, Chorode, Laying distribution System and Providing FHTCs in Chorode Panchayath-General Civil Work.
Activities Painting of Kalliasseri OHSR and Compound wall including JJM slogan lettering and drawing of pictures in the walls.
Jal Jeevan Mission - Package 5 Construction of well (10m depth and 6m dia) in ward 8 of Chaliyar Pachayath in Malappuram District
Construction, testing and Commissioning of 22LL OHSR , Supplying , laying, testing and commissioning of distribution system and providing Functional Household Tap Connections in Puthuppadi Panchayath - Zone 1
Jal Jeevan Mission (JJM)-(2021-2024) Phase II - ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages-Pipe line extension and providing FHTC in various wards of Meenagadi GP - Reach II
Jal Jeevan Mission (JJM)-(2021-2024) Phase II - ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages-Pipe line Extension and Providing FHTC in various Wards in Meenangadi GP - Reach - I
Jal Jeevan Mission WSS to Ambalappara Panchayath Gap filling of distribution network using GI pipe and road restoration in Ambalappara high level zone
Jal Jeevan Mission (JJM)-Jal Jeevan Mission-2023-24 Maranalloor Panchayat-Phase-III CWSS to Kalippara--Replacement of old and damaged PVC pipe from Velloorkonam junction to Cheenivila road and allied work-Pipeline Work
Jal Jeevan Mission (JJM)-2021-22-Amboori Panchayath-Providing and laying Precast concrete tiles and Constructing returning wall around the Kurushumala Sump cum Pump House for avoid landslides.-Jal Jeevan Mission-General Civil Work
Jal Jeevan Mission (JJM)-Jal Jeevan Mission 2021-2024 - Providing functional household connection in Vazhathoppue and Idukki - Kanjikuzhy (Part) Panchayath-Demolition of Existing Panchayath Tank for Constructing New 1 Lakh Litre OHSR at Vasuppar
Providing House Hold Tap Connection in Rural House Holds.
Jal Jeevan Mission - Package 7 - Full coverage to Kobankolli, Millumkunnu and Vengadu Colony in ward 4 of Chaliyar Gramapanchayath, Malappuram District
JJM- 2021-22 Phase 2 - SLSSC 3- Providing FHTC and laying pipes in Panachikkadu Panchayath, Kottayam District
JJM pipe line extension , replacement of AC pipes, Augmentation of WTP and providing FHTC in Chithara panchayath
JJM WSS to Thiruvali and adjoining villages Providing FHTC to all habitations of Thiruvali Panchayath Malappuram District
JJM-CWSS to Edarikkode panchayath in Malappuram Dt-Package 3- Distribution system and FHTC- General Civil Work
JJM Poomangalam Gramapanchayath RDWSS to Karalam Kattoor Padiyoor Poomangalam Providing FHTC to Rural house holds Part 10
Jal Jeevan mission-2021-2022- Water Supply Scheme to Puthuppally Panchayaths in Kottayam District - Package II Supplying and Laying DI / PVC / HDPE/ GI Distribution network and providing FHTCs - From Existing GLSR at Vennimala Zone no III
Jal Jeevan Mission WSS to Manalur Panchayath PH 2 to 5th SLSSC Arimbur and Manalur common Gravity Line Laying 355 mm HDPE Pipe through KLDC seepage drain from Varattuchaal to Rachamuttu Bridge Thrissur District Pipeline Work
Jal Jeevan mission-2021-2022- Water Supply Scheme to Puthuppally Panchayaths in Kottayam District - Package I Supplying and Laying DI / PVC /HDPE /GI Distribution network and providing FHTCs - From Existing GLSR at Kumaromkodu Zone no I
Jal Jeevan Mission-2020-21 Supplying and laying distribution system to Marutharoad panchayath from new OHSR at Padalikkad School compound (Zone 7) and from 11 LL OHSR at JTS compound (Zone 8) providing FHTCs (2922 Nos)
Jal Jeevan Mission Supplying ,Laying, Testing and Commissioning of 700 mm DI K9 Pumping Main from WTP site at Nariparamba to OHSR at CV Junction - Package - 1 C-Utility shifting of existing old pipes -Pipeline Work
Jal Jeevan Mission-WSS to Eroor Panchayath-Phase I Package-2- Laying of pumping main and Gravity main to OHSR distribution network in Eroor-Edamon road and its by roads in Eroor panchayath in Kollam district
Jal Jeevan Mission Kannur District Eramam Kuttur G. PConstruction of Intake well cum pump house,4MLD WTP,4.50m high RCC Weir, Construction of service reservoirs and laying pumping main transmission main distribution system and providing FHTCs
Jal Jeevan Mission 2022-23- Construction of Newly drilled Tube well,Pump house,supply and erection of submersible pump set and Interconnection work at Anganawadi compound No106(South of vettuvelil temple),ward no20 in Thazhava panchayath
Jal Jeevan Mission in Elampalloor panchayath RWSS to Punukkannoorchira Supply erection and commissioning of wall mounted gravity feed chlorinator of capacity 2kg/hr with PH Meter and Turbidity meter for 3 MLD WTP at Punukkannoorchira Plant
Jal Jeevan Mission - Full coverage to Edakkattuparambu and Panampilavu (ward 20and21) and Geevargees Colony (ward 1) of Urangattiri Gramapanchayath in Malappuram District
Jal Jeevan Mission - Full Coverage to Elavally Grama Panchayath in Thrissur District- Package 7 - Pumping main 2 from KWA tank to Pothanmashkunnu
Jal Jeevan Mission - Full Coverage to Elavally Grama Panchayath in Thrissur District - Package 6 - Pumping main 1 from Ponnathukunnu to KWA Tank
Pipe line extension work at Parakkulam Anjangadi road Ayyappankadu road and Puthankalam road in Tarur Grama Panchayath
Providing Functional Household Tap Connections by Retrofitting and Extending existing JICA water supply scheme in Perumanna Grama Panchayath in Kozhikode District
JJM Providing FHTC to households in Ayyappankovil and Kanchiyar panchayaths PACKAGE II
Jal Jeevan Mission CWSS to Nattika Firka Engandiyur Grama Panchayath SWSM Reappropriation Construction of 5 LL OHSR at Thirumangalam Construction of 5LL OHSR at Thirumanagalam Engandiyur Grama Panchayath Soil investigation
JJM Kollam District- Kummil Grama panchayath- PE/PVC pipe laying, providing FHTC, construction of OHSR etc.Phase 2