Loading…
Loading…
5,217 results • Best match
Urgent Repairs to NH 5 to NP Road to Heerapuram via S.R.K.Pruram and Harashabada from km 2/0 to 5/0 in Srikakulam District (SKOD 046).
Package No.AP09PIII 15, T01 Road from NH to Ventrapragada (via) Gopuvanipalem,Marr iwada,Mudunuru, Jabarlapudi of Pamidimukkala Mandal of Krishna district, Est.Rs. 292.40 plus 17.54 lakhs
Up gradation of R14 Railway Track from 52Kg track structure to 60kg track structure including lifting and packing of track with metal ballast in NH yard.
Providing B.T Hot Mix Road to Hailand Road from NH-16 Service Road to Western Bypass Road Under in Mangalagiri Tadepalli Municipal Corporation under General Funds
Providing hot applied Thermoplastic Road marking lines & Twin Molded Shanks in NH-65 (From Durga temple to Venkateswara Foundry Jn.road) in circle-1 Area. (1ST CALL)
Providing of Thermoplastic Road Markings at Bellary bypass road, NH-44 Service road, 4th Road, 5th Road in 41 to 45 Divisions in Anantapuramu Municipal Corporation
Construction, erection and maintenance of Chalivendrams at Alankar Studio NH-16 High way Near Pitapuram Colony in ward nos.22 of East Zone. (1 No Chalivendram)
Widening and strengthening of Existing road from 3.65m to 9.00m C/w from NH 516E to Approach junction of kanamam at IP-KANAMAM, Anandhapuram(M), Visakhapatnam District.
Renewal of BT road and providing line marking from NH-16 to Way Bridge at Kapuluppada Dumping yard in Ward No. 05 of Madhurawada Zone of GVMC.
Construction of Bus shelter at NH-16 biside Gas godown of Ravulavalasa GP Narasannapeta (M) of Srikakulam (D) 2nd Call Grant: MPLAD 18th LS, est.Cost: 8.00 lakhs
CONSTRUCTION OF CC ROAD FROM OLD NH-5 ROAD TO YOGA RAMU HOUSE (D.NO.18-32-139) IN WARD NO.15 OF YELAMANCHILI MUNICIPALITY UNDER VMRDA FUNDS.
Construction of CC Road to Co-Axial Road from NH 216 to D. No. 22-3-4 in 29th ward in Tanuku Municipality (Soft Loan of APUFIDC)
Construction of Cc Drain from Kamireddy Satyanarayana (Raavi Chettu) to NH-216A (Beside Parveen Marbles)in Hukumpeta Village of Rajamahendravaram Rural Mandal,Est Cost Rs:-20.00 Lakhs
Comprehensive Maintenance to various computer systems and printers at State Roads, Administration, State Architect, Rural Roads, Quality Control, Buildings, D&P, Electrical & NH wings in the O/o Engineer-in-chief(R&B), new HODs office building at MG Road, Vijayawada, Andhra Pradesh for the year 2018-2019 i.e from 01.04.2018 to 31.03.2019 (12months).Sub work : Providing AEBAS Devices to the Office of Engineer-In-Chief(R&B) at MG Road Viijayawada.
2024-HOR01-CB-238 Maintenance of Soft landscaping Garden works of NH-16 Road central median from 7.00Kms. length at Punjab Hotel jn. to 7.60Kms. length at Birla Jn./ Murali Nagar Jn. (0.60Kms.) and Road central median from 7.60Kms. length at Birla Jn./Murali Nagar Jn. to 8.80Kms. length at Urvasi signal (Total of 1.20Kms.) for further period of 12 months from 01-10-2024 to 30-09-2025 (Reach-9&10)).
Providing water supply PVC pipe line 110mmdia from 1) Municipal Building to Mule Srinivasulareddy shop 2) Borewell to Mule Srinivasa reddy house 3) new bore well to Ramalayam at Yallampalle ward no.03 , Providing water supply PVC pipe line 110mmdia ... from NH -67 ...
Providing BT patchwork to the stretch a.from Km 0/0 to 1/68 in Bypass road to Ponnekallu village b. from Km 5/2 to 9/3 in Tadikonda to meet NH-5 via kantheru road c. from Km 0/0 to 3/0 of Tadikonda to Rayapudi road d. from Km 8/0 to 11/75 & Km 14/4 of GP road to Ravela via Visadala Mandapadu road in Guntur District
(1)Improvements to Riding surface of the road from km 0/0 to 3/245 of Madanapalli-Krishnagiri road NH 219 in Madanapalli town limits Annamayya District (2) Improvements to the ridign surface of the road from km 166/ 565 to 174/0 of Ananthapur-Chennai Road 9Madanapalle town limits) in Annamayya District (3). Improvements to the riding surface of the road from km10/0to 24/2 of Vayalpadu-Gundluru road in Annamayya District
Providing BT patchwork to the stretch a.from Km 0/0 to 1/68 in Bypass road to Ponnekallu village b. from Km 5/2 to 9/3 in Tadikonda to meet NH-5 via kantheru road c. from Km 0/0 to 3/0 of Tadikonda to Rayapudi road d. from Km 8/0 to 11/75 & Km 14/4 of GP road to Ravela via Visadala Mandapadu road in Guntur District (4th Call)
One Time Improvement of exiting road (Bypassed stretches) in Macherla Town from Km.173/394 to Km.177/924, Rentachintal Town from Km.190/485 to Km.194/578 and Gurazala Town from Km.198/554 to Km.204/170 in the State of Andhra Pradesh under Annual Plan ... (R&B) NH Sub-Division, ...
DEVELOPMENT OF NEW A SITE RO IN SURVEY NO 41/B3 SITUATED AT KAKARLA (V), (CUMBUM TO MARKAPUR ON NH) ARDHAVEEDU(M) PRAKASAM (D) VIJAYAWADA DIVISIONAL OFFICE TAPSO
Providing Central Lighting on the divider of the newly laid two-lane cement road from NH-65 to Boddurai in Mulapadu(V) of Ibrahimpatnam(M), Est.Rs.10.29 lakhs
Desiltation of Major Drains (Geddas) at Swatantra Nagar, Krishna Nagar, Mallayyapalem, Vambey Colony, Mogadaramma Colony, Bapuji Nagar, NH-16 Service Road in Ward No. 07 of Madhurawada Zone.
Beautification Yendada main road from Yendada NH Jn. to Yendada beach road Jn. by providing of Central Median, Grills, Footpath Dividers, etc., in Madhurawada Zone. (15th Finance Grant).
Package No.AP26PVT010 L031 Road from NH 516E at Masada to Egamalapadu via Gondivalasa of Hukumpeta mandal of Alluri Sitharamaraju District Est.Cost.Rs.263.50 Lakhs Rs.17.13 Lakhs for Routine Maintenance.
MRL08 NH 16 near Jonnathali to SH 354 (Old Madras Road) via Chimmiribanda Dronadula and Ankireddypalem of Martur Mandal Prakasam District (Erstwhile) Est.Cost.Rs.353.00 Lakhs , Rs.22.95 Lakhs (Mtc)
Desiltation of Storm water Drains at Janashakthinagar along NH-44 Service Road, MG Petrol bunk to Anantapur Municipal Corporation limits in 41, 42 Divisions in Ananthapuramu Municipal Corporation, Anantapuramu
(Monsoon Action plan-2026) Engaging of the Shovel 0.85 cum 110 hp for Removal of Silt at Railway Mondi Gate to NH-16 in AE - 11(LB Nagar) Section.
Erection of one number NBT D type 66 KV plus 6 (58A) extension D/C DAM, Hampi I and II feeders under self Execution Scheme by the TB Board, TB Dam for getting the adequate/maintain vertical & horizontal clearances between tower location Nos 58 and 59 ... Bellary NH -63
Estimate for erection of one number NBT D type 66KV 3(58B) extension D/C DAM - Hampi I & II feeders under Self Execution Scheme by the TB Board, TB Dam for getting the adequate/Maintain the required vertical & horizontal clearances between tower ... Ballari NH -63
Erection of one number NBT D type 66 KV plus 6 (58A) extension D/C DAM, Hampi I and II feeders under self Execution Scheme by the TB Board, TB Dam for getting the adequate/maintain vertical & horizontal clearances between tower location Nos 58 and 59 ... Bellary NH -63
Estimate for erection of one number NBT D type 66KV 3(58B) extension D/C DAM - Hampi I & II feeders under Self Execution Scheme by the TB Board, TB Dam for getting the adequate/Maintain the required vertical & horizontal clearances between tower ... Ballari NH -63
Maintenance of MDRs 1. Rajanagaram West Gonagudem via Kalavacharla, Seetharampuram, Gadarada and Branch road to Murari road from km 0/0 to 15/0. 2. Rajanagaram Kalavacharla R&B road to Bhoopalapatnam via Narendrapuram, Trimurthula temple road, ... Kothavelugubanda NH .5 ...
Annual Maintenance of MDR ODRs 1.Throvagunta-Pallamalli road from Km.0.0 to 25.6 2. GNT Road to meet CO Road from Km.0.0 to 10.515 3. Naguluppalapadu-Kanaparthy road from Km.0.0 to 17.050 4. Pernamitta to NH.5 Via Tellagunta, Peddakothapalli road from Km.0.0 to 8.630 5. Pandillapalli to IS Road Via Timmasamudram, Gollapalem road from Km.3.0 to 11.400 in R and B Section.II, Ongole for the year 2025-26 in Prakasam District
2024-HOR01-CB-246 - Maintenance - Hiring of 5KL. Capacity water tanker for Watering on the NH-16 Road central median from thatichetlapalem jn to urvasi jn (reach 11&12), urvasi jn to punjab hotel jn (reach 9&10) in zone-5 area, and telugu thalli flyover centre and side hanging pots to chavulamadam circle jn, 80 ft road , ., in zone-4 area.for further period of 12 months from 01-10-2024 to 30-09-2025 in zone -4,5 area..
Main Work: AVR HNSS Project -PhaseII- Package No:64(Balance work) Earth work excavation of Chintaparthy Distributory Canal, Construction of CM & CD works and protection works to the structures from Km. 0.000 to Km.42.300/44.200 offtaking from ... Road, NH -340(AVR ...
Annamaiah Circle to Gokul circle (via) Krishna circle a) Annamaiah Circle to Krishna Circle (Widening and Strengthening of Road from NH-18 to Km 1/3 of CRA Road (Via) Kagithalapenta, Kotireddy Circle, Seven Roads and Krishna Theatre from Km 2/7 to 3/0). b) Krishna Circle to Gokul Lodge (Widening and Strengthening of Road from Krishna Theatre to One Town Police Station Junction through Potti Sreeramulu Statue Junction on Madras Road from Km 0/0-300)
Annual Maintenance of MDR ODRs 1.Throvagunta-Pallamalli road from Km.0.0 to 25.6 2. GNT Road to meet CO Road from Km.0.0 to 10.515 3. Naguluppalapadu-Kanaparthy road from Km.0.0 to 17.050 4. Pernamitta to NH.5 Via Tellagunta, Peddakothapalli road from Km.0.0 to 8.630 5. Pandillapalli to IS Road Via Timmasamudram, Gollapalem road from Km.3.0 to 11.400 in R and B Section.II, Ongole for the year 2025-26 in Prakasam District
2024-HOR01-CB-258 - Maintenance - Hiring of 5KL. Capacity water tanker for Watering on the Maintenance of Soft landscaping works in the existing beach Road central median from Sagar Nagar Bhoolokamma Temple jn toThimmapuram jn.,, (7.7Kms.) , from ... and NH -16 ...
2024-HOR01-CB-246 - Maintenance - Hiring of 5KL. Capacity water tanker for Watering on the NH-16 Road central median from thatichetlapalem jn to urvasi jn (reach 11&12), urvasi jn to punjab hotel jn (reach 9&10) in zone-5 area, and telugu thalli flyover centre and side hanging pots to chavulamadam circle jn, 80 ft road , ., in zone-4 area.for further period of 12 months from 01-10-2024 to 30-09-2025 in zone -4,5 area..
Laying of CC Road and CC Drain from D.No. 57/73 to D.No. 56/256 CC Road from D.No. 56/11-7 to D.No. 56/11-10(vikas school) ,CC Drain from a)D.No. 56/266-1 to D.No. 56/256(DMHO Road), b) D.No. 56/7-11-2 (opp) to D.No. 56/11-3-2 (NH Road), c)D. No. 56/5 to D. No. 56/11-10(vikas school) in Sastri nagar of 46th Division.
Consultancy services for preparation of Detailed Project report for the work Construction of 2 Lane ROB & approaches as one time improvement in Lieu of LC No.8E/SPL3 at Km.7/01-02 and Km.91/2 & LC No.114 T/SPL3 at Km.105/5-6 and Km.81plus400 of NH165 ... under NH (O) ...
Annamaiah Circle to Gokul circle (via) Krishna circle"a) Annamaiah Circle to Krishna Circle (Widening and Strengthening of Road from NH-18 to Km 1/3 of CRA Road (Via) Kagithalapenta, Kotireddy Circle, Seven Roads and Krishna Theatre from Km 2/7 to 3/0). b) Krishna Circle to Gokul Lodge (Widening and Strengthening of Road from Krishna Theatre to One Town Police Station Junction through Potti Sreeramulu Statue Junction on Madras Road from Km 0/0-300)
One Time Improvement of exiting road (Bypassed stretches) in Macherla Town from Km.173/394 to Km.177/924, Rentachintal Town from Km.190/485 to Km.194/578 and Gurazala Town from Km.198/554 to Km.204/170 in the State of Andhra Pradesh under Annual Plan ... (R&B) NH Sub-Division, ...
Under the main work of Construction of Proposed 4Lane ROB and its approaches in lieu of existing level crossing No.124E SPL 3 at Km.1.800 on NH 205 between Prasannayapalli and Jangalapalli railway stations on Anantapuramu Dharmavaram Railway section in the state of AP Sub-work Urgent Repairs to the Service Road of ROB at Km.1.8 (Old NH205) of Uravakonda Krishnagiri road from Km.77.100 to 78.650 of NH42 in the State of Andhra Pradesh.
AMC of 4 Nos of (MDR) roads (1) OV Road to OV Road via palukuru from km.0/0 to 11/4, 2) Karedu Ramp to Chevuru via Ramayapatnam road from km.8/0 to 33/500, 3) NH 16 to Ulavapadu village limits from km.0/0 to 1/780 4) Kandukur to Vennuru road (via) Chirrikurapadu road from km.0/0 to 9/0 in R&B Section, Kandukur for the year 2022-23 (2nd Call)
Providing Jungle Clearance to road (1) from Km.0/0 to 3/6 of NH-7 to meet to Bommeparthi (2) from Km.0/3 to 3/6, 4/2 to 9/6, 10/4 to 13/4 and 14/2 to 21/2 of Raminepalli to Marur road (via) Gondireddypalli - Yerraguntla - M.Bandameedapalli, (3) from Km.8/2 to 11/2 of Dharmavaram to Anantapuramu road (via) Chigicherla (upto Anantapuramu Rural Mandal limits) in Anantapuramu District
2024-HOR01-CB-247 - Maintenance - Hiring of 5KL. Capacity water tanker for Watering on the NH-16 service road median from thatichetlapalem jn to r&b jn north side, central median from punjab hotel to nad jn reach 7&8, service median from thatichetlapalem to r&b jn south side and central median from nstl opp zindal buiding to vuda colony, in zone-5 area.further period of 12 months from 01-10-2024 to 30-09-2025 .
Package No. 010 S N Padu Constituency (4 works) Periodical maintenance to the R/f Kandlagunta to Old Madras road in N.G Padu mandal, Est. Cost Rs.45.00 lakhs,2)GNT road to Doddavarappadu in Maddipadu mandal, Est.Cost Rs.18.00 lakhs,3) Road from NH Chirala R&B road to Basavannapalem in Maddipadu mandal, Est.Cost Rs.12.00 Lakhs,4)Raamatheertham 27/0 Km of Ongole-Nandyal R an B road to Busarapalli in Chimakurthy mandal, Est.Cost Rs.30.00 lakhs
Additional Maintenance to riding surface of NH 43 (Manapuram) to Kompangi (R&B) road (via) Poram, Jakkuva road from km 0/0 to 16/0 (in bits) in Vizianagaram district.