Loading…
Loading…
5,217 results • Best match
Development of Six Lane Kandili Tumbigura Section of NH130CD Road from km 342.500 to km 365.033 under Raipur Visakhapatnam Economic Corridor in the state of Odisha on Hybrid Annuity Mode Pkg-OD8
Consultancy Services for IE for Supervision of Development of 6-lane access control of Raipur-Visakhapatnam EC under BMP from Design Chainage 124.611 Dhanara (Odisha-Chhattisgarh) to Design Chainage 249.000 Kaliagura in Odisha on HAM Mode (PKG-I)
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur Vishakhapatnam Corridor in the State of Chhattisgarh
Development of 4Lane Road Connectivity from existing East break water upto Convent Junction from Phase 1 of the project start from Km.0.312 End of Visakhapatnam Port Trust and Ends at Km.3.800 VCTPL Exit Gate in AP under BMP
Consultancy Services for IE for Supervision of Development of six lane access control of Raipur-Visakhapatnam EC under BMP from Design Chainage km 421.100 Korlam to Design Chainage 464.662 Sabbavaram in Andhra Pradesh on HAM Mode (Package-II)
Strengthening and Major maintenance work of stretch 2lane with paved shoulder of Penchalakona to Yerpedu sec of NH565 (Total Length 84.00km) in Andhra Pradesh on PBMC mode
Consultancy Services for IE for Supervision of Development of Six Lane Chittoor-Thatchur Highway from km 61.380 (Veera Kaveri Raja Puram) to km 116.100 (Kannigaipair) on HAM under BMP in Andhra Pradesh and Tamil Nadu on HAM Mode (Package-II)
IE for Supervision of Development of 6lane Abhanpur Magerlod Sec of NH130 CD Road from km 000.000 to km 42.852 under Raipur Visakhapatnam Economic Corridor in Chhattisgarh on HAM Pkg-CG1
Development of 6 Lane Access Controlled Greenfield Highway from Nallacheruvu palli(Ch.96.300)to Yerragudipadu(Ch 129.000)of Bengaluru Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana PhaseI in Andhra Pradesh (Package 5)
Providing and Laying of Optical Fiber Cable (OFC) from km 22.000 to km 534.72 of Hyderabad Bangalore Highway on EPC mode in the state of Telangana, Andhra Pradesh, and Karnataka.
Development of 6Lane Access Controlled Greenfield Highway from Kodur (Ch. 0.000) to Vanavolu (Ch. 24.300) of Bengaluru Vijayawada EC on HAM under BMP Ph1 in Andhra Pradesh (Pkg-1)
Development of 6Lane Access Controlled GFH from Mallapalle(Ch176.000) to Kavulakuntla(Ch196.000) of Bengaluru-Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh(Pckg8)
Development of 6 Lane Dhanara (Odisha/Chhattisgarh Border) Hatibena Section of NH130CD Road from km 124.611 to km 146.500 under Raipur Visakhapatnam Economics Corridor in Odisha on HAM (Package OD 1)
Development of 6Lane Access Controlled Greenfield Highway from Odulapalle (Ch.72.000) to Nallacheruvu palli (Ch.96.300) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in the Andhra Pradesh (PKG-4)
Amakathadu at km 250.700 from Hyderabad to Bangalore section from Km 211.000 to km 295.000 (length 84.000 km) of NH7 (New NH44) in Andhra Pradesh (Under PIU Anantapur)
Construction of 4 lane access controlled highway from Samarlakota to Achampeta Jn (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH16 connectivity in Andhra Pradesh on EPC mode under Bharatmala Pariyojana
DEVELOPMENT of Six Lane Chittoor-Thatchur HIGHWAY from km 61.380 to km 96.040 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package-III)
Improvement of 4 lane road to 6 lane road and 4 lane dedicated Port Roads for the Port connectivity road from Convent junction to Sheelanagar Junction in the State of Andhra Pradesh on EPC mode (2nd Call)
IE services for Supervision of Development of 6lane of Raipur Visakhapatnam Economic Corridor from Boriguma to Pattangi section Chainage 249.000 to Chainage 338.500 of NH130 CD in Odisha on HAM Pkg2
O and M Works for Anandapuram Visakhapatnam Anakapalle sec from Km.682.980 to Km.741.256 and Ranastalam Town Portion from Km. 630.120 to Km. 634.120 of NH16 in Andhra Pradesh on PBMC
Construction of 4lane Bangalore-Chennai Expressway from Km 127.000 (Bangarupalem) to Km 156.000 (Gudipala) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase II/Package III)
Consultancy Services for IE for Supervision of Development of six lane access control of Raipur-Visakhapatnam EC under BMP from Design Chainage km 365.033 Aluru to Design Chainage 421.100 Korlam in Andhra Pradesh on HAM Mode (Package-I)
Development of 6Lane Access Controlled GFH from Narayanmpet(Ch203.500) to Chandrasekharpuram(Ch228.000) of NH544G Bengaluru-Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh(Pckg-10)
Development of Six Lane Chittoor-Thatchur Highway from km 0.000 to km 43.800 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package-I)
Limited RFP for providing Manpower Services to Invit-Concessionaire for collection of User Fee at Dukkavanipalem FP of Anandapuram Pendurthi Anakapalle of NH16 in Andhra Pradesh
CS for IE for 4Laning of NH71 from Madanapalle to Pileru Section (Length 55.900) Pkg1 and Pileru to Kalur Section (Length 37.817) Pkg2 on HAM in Andhra Pradesh under Bharatmala Pariyojana
Development of 6Lane Access Controlled GFH from Audireddipalle(Ch160.000) to Mallapalle(Ch176.000) of NH544G Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh (Pckg7)
CS for AE for Supervision of Improvement of 4 lane to 6 lane road (Public Road) and Construction of 4 lane dedicated Port Road for the Port Connectivity Road from Convent Junc. to Sheela Nagar Junc. in Andhra Pradesh on EPC Mode
Development of 6Lane Access Controlled GFH from Kavulakuntla(Ch196.000) to Narayanmpet(Ch203.500) of NH544G Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh(Pckg9)
Structural rehabilitation of Flyover RAMP-A on Port Road, Visakhapatnam by using specialized techniques in the State of Andhra Pradesh
Construction of 4Laning of NH716 from Chinna Orampadu (Design Km 64.200-Existing km 196.125 of NH716) to Renigunta on NH565 near Tirupati Airport Rd (Design Km 121.935- Existing km 137.000) (Design Length 57.735 Km) on HAM under BMP in AP (PKG-II)
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
CS for IES for Supervision of Development of 6L Access Controlled GFH from Audireddipalle to Chandrasekharpuram of NH544G Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh(PckgIII)2ndCall.
CS for IES for Supervision of Development of 6Lane Access Controlled Greenfield Highway from Odulaplle(Ch72.000) to Audireddipalle(Ch160.000) of Bengaluru Vijayawada Economic Corridor on HAM Mode under BMP Ph-I in Andhra Pradesh(Pckg-II)
Development of 6 Lane Access Controlled Greenfield Highway from Yerragudipadu (Ch.129.000) to Audireddipalle (Ch.160.000) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh (Package-6)
CS for IE services for Supervision of Development of 6Lane Access Controlled Greenfield Highway frm Chandrasekharapuram to Muppavaram(Ch.343.240) of Bengaluru Vijayawada EC on HAM Mode under BMP PhaseI in Andhra Pradesh(PKGIV)
Consultancy Services for IE for Supervision of Development of Six Lane Chittoor-Thatchur Highway from km 0.000 (Varadharajula) to km 61.380 (Veera Kaveri Raja Puram) on HAM under BMP in Andhra Pradesh and Tamil Nadu on HAM Mode (Package-I)
Engagement of user fee agency on the basis of CB through etender for Dukkavanipalem FP at km 686.540 Marripalem FP at km 722.170 for the section from Anandapuram Pendurthi Ankapalli Section from design km 682.980 to km 731.585 in Andhra Pradesh
Engagement of user fee agency on the basis of competitive bidding through e-tender for Bathalapalli fee plaza at four lane paved shoulder and Km 99.971 to Km 134.00 of Rapthadu-Mudigubba section in the State of Andhra Pradesh
Development of 6Lane Access Controlled Greenfield Highway from Vankarakunta (Ch.45.700) to Odulapalle (Ch.72.000) of Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh (PKG-3)
Construction of Six laning from Naidupeta (Green Fields) to Turpu Kanupur Ch.KM 57.046 to Ch.KM 91.930 and greenfield area which falls in Nellore district in the State of Andhra Pradesh on HAM Mode
Construction of 3 lane western side flyover from Design Km 0.300 existing Km.1098.680 (Before Jyothi Mahal Junction) to Design Km 2.770 existing Km.1096.210 (Beyond Ramesh Hospital Junction) on NH16 in Andhra Pradesh on EPC mode.
Limited RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Veeravalli Fee Plaza of Gundugolanu Devarapalli Kovvuru section of NH16 in the state of Andhra Pradesh
Development of Six Lane Chittoor-Thatchur Highway from km 43.800 (Kumarajapet) to km 61.380 (Veera Kaveri Raja Puram) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package- II)
Consultancy Services for Development of Inter-Modal Station at Tirupati Andhra Pradesh
Development of Six Lane Karki Kaliagura Section of NH130-CD Road from km 226.500 to km 249.000 under Raipur Visakhapatnam Economic Corridor in the state of Odisha on HAM (Package OD-4)
CS for Preparation of Feasibility Study for Development of MMLP and Detailed Project Report for external trunk connectivity infrastructure to the Multi Modal Logistic Park Site at Anantapur and Visakhapatnam in Andhra Pradesh(3rd Call)
Engagement of user fee agency on the basis of CB through e-tender for Visakhapatnam Port Connectivity toll plazas located at km 9.158 (Main toll plaza near Panchavati Colony) in the state of Andhra Pradesh
CS for IES for Supervision of Development of 6Lane Access Controlled Greenfield Highway from Kodur(Ch0.000) to Odulaplle(Ch72.000) of Bengaluru Vijayawada Economic Corridor on HAM under BMP Ph-I in Andhra Pradesh(Pckg-I)
Development of Six laning of Chittoor-Thachur road from km. 96.040(Pondavakkam) to km. 116.100 (Kannigaipair) on Hybrid Annuity mode under Bharatmala priyojana, in Tamil Nadu (Package-IV)