Loading…
Loading…
313 results • Best match
Work on NH-713A from km 9.600 to km. 29.250 under EPC Mode for the year 2023-24
Development of new RO ON NH13 WITHIN 10KM FROM NH INTERSECTION WITH POTIN KIMIN ROAD TOWARDS ZIRO DIST KEYI PENYOR STATE ARUNACHAL PRADESH under Tinsukia Divisional Office
By-Pass Road from NH-415 at Chimpu to NH-415 at Papu Nallah via Jullang (11km).
Rectification of Accident Black Spots at Meka Junction on NH-115, Arunachal University on NH-15 and Mahadevpur on NH-15 under Jairampur Highway Division in the State of Arunachal Pradesh
Repair and Maintenance from Parshuram Kund to Chowkham Section of NH-13 and NH-15 in the State of Arunachal Pradesh
Rehabilitation of Siku bridge at km 561.200 on Pasighat-Mebo-Dambuk-Bomjir section of NH-13 (Old NH-52) on EPC mode in the state of Arunachal Pradesh under NH(O) Annual plan 2019-20.
IOAOD SO- B to A Conversion of Retail Outlet M/s Santipur Filling Station, Santipur, NH-115, Dist. Lower Dibang Valley, Arunachal Pradesh.
Emergent Erosion Control at Km 705.700 of NH-13 RHS Near Tezu Nallah River and Lohit River Confluence Point and River Training Works to prevent RHS Breach of NH-13
C/o road from NH to Mobom (New Settlement), Leparada District
Development of New A site Retail Outlet, on NH-13, within 5 km from the office of Development of New A site Retail Outlet, on NH-13, within 5 km from the office of Deputy Commissioner Lohit, Dist-Lohit, State-Arunachal Pradesh,Pin-792001
Annual Repair and Maintenance work from Brahmakund T Junction KM 745.600 to KM 770.600 Section of NH 13 and NH 15 Total Length 25.000 KM in State of Arunachal Pradesh
Construction of road fron NH-13 to Ramda (4.00 KM)
Work on NH-13 from km 583.450 to km 605.600
Work on NH-13 from km 669.800 to km 682.396
Work on NH-513 from km 0.000 to km 19.850
Improvement and Widening to two lane with Paved Shoulder of NH-15 (Old NH-52) from (Kamlang T-Junction to Chowkham, (PKG-02) in the state of Arunachal Pradesh
Performance Based Management Contract (PBMC) on Pasighat-Pangin road section of NH-13 from Km 840.91 to km 855 (Total length 14.09km) under Contract Maintenance of NH for the year 2023-24 under Pasighat NH Division in the state of Arunachal Pradesh
Performance Based Management Contract (PBMC) on Gobuk to Sijhon road section of NH-513 from Km 26.21 to Km 75.48 (Total length 49.28km) under Contract Maintenance of NH for the year 2023-24 under Pasighat NH Division in the state of Arunachal Pradesh
STMC Work on NH-415 from Km 29.500 to Km 51.740
Earthwork, GSB, WBM, PMC with Seal Coat
C/o Bridge across Chombo Nallah on NH-313 to New Emali (Old Etalin) in Etalin-Malinye Block of Dibang Valley District (A.P), under VVP (Span-20.00m)
Repair and Maintenance of Road from NH-515 to PMGSY Road.
Road Safety Measures at km 59.554 on NH-513 and km 40.900 on NH-13 in the State of Arunachal Pradesh under road safety annual plan 22-23
Permanent restoration of flood damages on Pasighat-Mebo-Dambuk-Bomjir Road (NH-13) and Jonai (Ruksin Gate)-Pasighat-Raneghat Road (NH-515) in the state of Arunachal Pradesh.
Periodic repair of Pasighat to Mebo section of NH-13 (old NH-52) from Km. 550.15 to Km. 564.39 in the state of Arunachal Pradesh on EPC mode.
Annual Repair and Maintenance work from Parshuram- Kund to Chowkham Section of NH-13 and NH-15 with total Length - 56.450 Km in the State of Arunachal Pradesh
Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE
Repair and Rehabilitation of Barapani Bridge at 42.40 Km on Itanagar- Bandardewa road on NH 415 under NH(O) annual plan 2018-19 in the state of Arunachal Pradesh.
Work on location NH 415 at km 13.280, km 13.933, km 16.630, km 20.00, km 23.115, km 24.290, km 28.560, km 34.764, km 36.380, km 36.685, km 36.875,km39.100
PBMC works at section NH-513 from Km 91.94 to Km 117.22
Development of Pasighat-Yingkiong road view point on NH-513, Arunachal Pradesh.
Improvement and Widening to two lane with Paved Shoulder of NH-13 and 15 (Old NH-52) from Brahmakund T-junction to Kamlang T-Junction (Pkg-01) in the state of Arunachal Pradesh
DEVELOPMENT OF NEW A SITE RETAIL OUTLET LOCATION - ON NH-713, WITHIN 3 KM, FROM ZIRO POINT (INTERSECTION OF NH-713 AND PALIN-NYAPIN ROAD), DIST KURUNG KUMEY, ARUNACHAL PRADESH
Restoration of continuous landslide and sinking zone at Km 37.850 Km and Km 46.200 on NH-315 in the State of Arunachal Pradesh under NH(O) Annual Plan 2019-20
Periodic repair of Jonai-Pasighat-Raneghat section of NH-515 (old NH-52) from Km. 522.00 to Km. 536.00 (14.00 Km) in the state of Arunachal Pradesh on EPC mode.
PBMC work at section of NH- 315 from Km 24.000 to Km 56.485
Strengthening work at section on NH-13 from Km 0.000 to Km 26.580.
PBMC works at section of NH-13 from km 650.615 to km 682.396
One time improvement of existing National Highway Road (NH-208) from Singhicherra Colony to Nripendra Chakraborty Chowmuhani (Km 103.100 to Km 108.800) road section in the state of Tripura in the FY 2023-24 on percentage rate basis and work order bas
C/o road from NH-515 to Taane area, Rani Village, East Siang District
Improvement and strengthening of road from NH 513 to Simong village Upper Siang District
C/o Double Lane Bypass road from NH-515 Tabi Arik Area to Diking
FC, GSB, WBM, CDs, R/B Walls, Prime Coat, Track Coat, CC Drain, Road Furniture etc
Earthwork, GSB, WBM, PMC with Seal Coat, Protection work etc
C/o Road from NH 13 Bana Point to Old Bana Village, East Kameng District
C/o Pavement Road NH-417 to Upper Model Village IV, Naharlagun in Papumpare district
Consultancy Services as AE for Supervision of Construction of IL Road with hard Shoulder of Zido Singha Tuting Zido section on NH-913 Frontier Highway in the State of Arunachal Pradesh on EPC Mode
Annual Repair and Maintenance work from Kamlang T Junction KM 770.600 to Chowkham KM 806.750 Section of NH 15 Total Length 36.150 in the State of Arunachal Pradesh
Annual Repair Maintenance of Digaru to Demwe Section of NH-13 from Km 688.000 to Km 717.540 (Length 29.540 Km) in the State of Arunachal Pradesh
Construction of Intermediate Lane Road with hard Shoulder from design Km 0.000 to Km 13.08 Total length13.080 km of Tuting Zido NH-913 FH in the State of Ar.Pr. on EPC Mode